    A Multi-Restart Iterated Local Search Algorithm for the Permutation Flow Shop Problem Minimizing Total Flow Time

    Get PDF
    A variety of metaheuristics have been developed to solve the permutation flow shop problem minimizing total flow time. Iterated local search (ILS) is a simple but powerful metaheuristic used to solve this problem. Fundamentally, ILS is a procedure that needs to be restarted from another solution when it is trapped in a local optimum. A new solution is often generated by only slightly perturbing the best known solution, narrowing the search space and leading to a stagnant state. In this paper, a strategy is proposed to allow the restart solution to be generated from a group of solutions drawn from local optima. This allows an extension of the search space, while maintaining the quality of the restart solution. A multi-restart ILS (MRSILS) is proposed, with the performance evaluated on a set of benchmark instances and compared with six state of the art metaheuristics. The results show that the easily implementable MRSILS is significantly better than five of the other metaheuristics and comparable to or slightly better than the remaining one. © 2012 Elsevier Ltd. All rights reserved

    New efficient constructive heuristics for the hybrid flowshop to minimise makespan: A computational evaluation of heuristics

    Get PDF
    This paper addresses the hybrid flow shop scheduling problem to minimise makespan, a well-known scheduling problem for which many constructive heuristics have been proposed in the literature. Nevertheless, the state of the art is not clear due to partial or non homogeneous comparisons. In this paper, we review these heuristics and perform a comprehensive computational evaluation to determine which are the most efficient ones. A total of 20 heuristics are implemented and compared in this study. In addition, we propose four new heuristics for the problem. Firstly, two memory-based constructive heuristics are proposed, where a sequence is constructed by inserting jobs one by one in a partial sequence. The most promising insertions tested are kept in a list. However, in contrast to the Tabu search, these insertions are repeated in future iterations instead of forbidding them. Secondly, we propose two constructive heuristics based on Johnson’s algorithm for the permutation flowshop scheduling problem. The computational results carried out on an extensive testbed show that the new proposals outperform the existing heuristics.Ministerio de Ciencia e Innovación DPI2016-80750-

    Overview on: sequencing in mixed model flowshop production line with static and dynamic context

    Get PDF
    In the present work a literature overview was given on solution techniques considering basic as well as more advanced and consequently more complex arrangements of mixed model flowshops. We first analyzed the occurrence of setup time/cost; existing solution techniques are mainly focused on permutation sequences. Thereafter we discussed objectives resulting in the introduction of variety of methods allowing resequencing of jobs within the line. The possibility of resequencing within the line ranges from 1) offline or intermittent buffers, 2) parallel stations, namely flexible, hybrid or compound flowshops, 3) merging and splitting of parallel lines, 4) re-entrant flowshops, to 5) change job attributes without physically interchanging the position. In continuation the differences in the consideration of static and dynamic demand was studied. Also intermittent setups are possible, depending on the horizon and including the possibility of resequencing, four problem cases were highlighted: static, semi dynamic, nearly dynamic and dynamic case. Finally a general overview was given on existing solution methods, including exact and approximation methods. The approximation methods are furthermore divided in two cases, know as heuristics and methaheuristic

    An estimation of distribution algorithm for lot-streaming flow shop problems with setup times

    Full text link
    Lot-streaming flow shops have important applications in different industries including textile, plastic, chemical, semiconductor and many others. This paper considers an n-job m-machine lot-streaming flow shop scheduling problem with sequence-dependent setup times under both the idling and noidling production cases. The objective is to minimize the maximum completion time or makespan. To solve this important practical problem, a novel estimation of distribution algorithm (EDA) is proposed with a job permutation based representation. In the proposed EDA, an efficient initialization scheme based on the NEH heuristic is presented to construct an initial population with a certain level of quality and diversity. An estimation of a probabilistic model is constructed to direct the algorithm search towards good solutions by taking into account both job permutation and similar blocks of jobs. A simple but effective local search is added to enhance the intensification capability. A diversity controlling mechanism is applied to maintain the diversity of the population. In addition, a speed-up method is presented to reduce the computational effort needed for the local search technique and the NEH-based heuristics. A comparative evaluation is carried out with the best performing algorithms from the literature. The results show that the proposed EDA is very effective in comparison after comprehensive computational and statistical analyses.This research is partially supported by the National Science Foundation of China (60874075, 70871065), and Science Foundation of Shandong Province in China under Grant BS2010DX005, and Postdoctoral Science Foundation of China under Grant 20100480897. Ruben Ruiz is partially funded by the Spanish Ministry of Science and Innovation, under the project "SMPA-Advanced Parallel Multiobjective Sequencing: Practical and Theoretical Advances" with reference DPI2008-03511/DPI and by the IMPIVA-Institute for the Small and Medium Valencian Enterprise, for the project OSC with references IMIDIC/2008/137, IMIDIC/2009/198 and IMIDIC/2010/175.Pan, Q.; Ruiz García, R. (2012). An estimation of distribution algorithm for lot-streaming flow shop problems with setup times. Omega. 40(2):166-180. https://doi.org/10.1016/j.omega.2011.05.002S16618040

    An Application On Flowshop Scheduling

    Get PDF
    Flow shop scheduling problem has been well known as a research field for fifty years. In recent years, researchers have suggested many heuristic procedures to solve this type of problems. Most of these proposed algorithms in flow shop literature were applied to the benchmark problems. Few studies in flow shop literature include a real production application. The aim of this paper is to apply scheduling activity in a real flow shop production line. A cable production line is choosen for the application. All of the jobs are processed with same order which is named as permutational environment. The production line which is composed of eight different machines produces twelve kinds of cable. In other words, the problem size is 12 jobs x 8 machines. The objective of this problem focuses on minimizing total completion time and makespan. An ant colony algorithm is proposed to solve the problem. By changing initial solution of the algorithm, effect on objective function was monitored

    Ant Colony Optimization for Multilevel Assembly Job Shop Scheduling

    Get PDF
    Job shop scheduling is one of the most explored areas in the last few decades. Although it is very commonly witnessed in real-life situations, very less investigation has been carried out in scheduling operations of multi-level jobs, which undergo serial, parallel, and assembly operations in an assembly job shop. In this work, some of the dispatch rules, which have best performances in scheduling multilevel jobs in dynamic assembly job shop, are tested in static assembly job shop environment. A new optimization heuristic based on Ant Colony Algorithm is proposed and its performance is compared with the dispatch rules

    A survey of scheduling problems with setup times or costs

    Get PDF
    Author name used in this publication: C. T. NgAuthor name used in this publication: T. C. E. Cheng2007-2008 > Academic research: refereed > Publication in refereed journalAccepted ManuscriptPublishe

    Multi-objective sequence dependent setup times permutation flowshop: A new algorithm and a comprehensive study

    Full text link
    The permutation flowshop scheduling problem has been thoroughly studied in recent decades, both from single objective as well as from multi-objective perspectives. To the best of our knowledge, little has been done regarding the multi-objective flowshop with Pareto approach when sequence dependent setup times are considered. As setup times and multi-criteria problems are important in industry, we must focus on this area. We propose a simple, yet powerful algorithm for the sequence dependent setup times flowshop problem with several criteria. The presented method is referred to as Restarted Iterated Pareto Greedy or RIPG and is compared against the best performing approaches from the relevant literature. Comprehensive computational and statistical analyses are carried out in order to demonstrate that the proposed RIPG method clearly outperforms all other algorithms and, as a consequence, it is a state-of- art method for this important and practical scheduling problemThe authors thank the anonymous referees for their careful and detailed comments which have helped improve this manuscript considerably. This work is partially financed by the Spanish Ministry of Science and Innovation, under the projects "SMPA-Advanced Parallel Multiobjective Sequencing: Practical and Theorerical Advances" with reference DPI2008-03511/DPI and "RESULT-Realistic Extended Scheduling Using Light Techniques" with reference DPI2012-36243-C02-01 and by the Small and Medium Industry of the Generalitat Valenciana (IMPIVA) and by the European Union through the European Regional Development Fund (FEDER) inside the R+D program "Ayudas dirigidas a Institutos Tecnologicos de la Red IMPIVA" during the year 2011, with project numbers IMDEEA/2011/142 and IMDEEA/2012/143.Ciavotta, M.; Minella, GG.; Ruiz García, R. (2013). Multi-objective sequence dependent setup times permutation flowshop: A new algorithm and a comprehensive study. European Journal of Operational Research. 227(2):301-313. https://doi.org/10.1016/j.ejor.2012.12.031S301313227

    An integrated ACO approach for the joint production and preventive maintenance scheduling problem in the flowshop sequencing problem.

    No full text
    International audienceIn this paper, an integrated ACO approach to solve joint production and preventive maintenance scheduling problem in permutation flowshops is considered. A newly developed antcolony algorithm is proposed and analyzed for solving this problem, based on a common representation of production and maintenance data, to obtain a joint schedule that is, subsequently, improved by a new local search procedure. The goal is to optimize a common objective function which takes into account both maintenance and production criteria. We compare the results obtained with our algorithm to those of an integrated genetic algorithm developed in previous works. The results and experiments carried out indicate that the proposed ant-colony algorithm provide very effective solutions for this problem