62 research outputs found

    3D-HST+CANDELS : the evolution of the galaxy size-mass distribution since z=3

    Get PDF
    Spectroscopic+photometric redshifts, stellar mass estimates, and rest-frame colors from the 3D-HST survey are combined with structural parameter measurements from CANDELS imaging to determine the galaxy size-mass distribution over the redshift range 0 < z < 3. Separating early- and late-type galaxies on the basis of star-formation activity, we confirm that early-type galaxies are on average smaller than late-type galaxies at all redshifts, and we find a significantly different rate of average size evolution at fixed galaxy mass, with fast evolution for the early-type population, R eff∝(1 + z)–1.48, and moderate evolution for the late-type population, R eff∝(1 + z)-0.75Peer reviewedFinal Accepted Versio

    Manifestation of ageing in the low temperature conductance of disordered insulators

    Full text link
    We are interested in the out of equilibrium phenomena observed in the electrical conductance of disordered insulators at low temperature, which may be signatures of the electron coulomb glass state. The present work is devoted to the occurrence of ageing, a benchmark phenomenon for the glassy state. It is the fact that the dynamical properties of a glass depend on its age, i.e. on the time elapsed since it was quench-cooled. We first critically analyse previous studies on disordered insulators and question their interpretation in terms of ageing. We then present new measurements on insulating granular aluminium thin films which demonstrate that the dynamics is indeed age dependent. We also show that the results of different relaxation protocols are related by a superposition principle. The implications of our findings for the mechanism of the conductance slow relaxations are then discussed

    Starch safety in resuscitation

    Get PDF
    The Western Cape Department of Health (WC DoH) has taken a decision to withdraw all intravenous fluids (IVFs) containing hydroxyethyl starch (HES) from hospitals in the Western Cape, with similar action contemplated in the Free State and Gauteng. This was in response to recommendations from: The European Medicines Agency's Pharmacovigilance Risk Assessment Committee (EMA PRAC) that HES IVFs be withdrawn from clinical use. The United Kingdom Medicines and Healthcare Products Regulatory Agency (MHRA) which has issued a recall of all HES IVFs in the UK. The United States Food and Drug Administration which advises that HES IVFs be used with caution in ICU, cardiac surgery and patients with known kidney disease or coagulopathy. Further advice was that HES should be stopped if coagulopathy or renal dysfunction develops, as well as that renal function should be monitored for 90 days after HES administration.http://www.samj.org.zaam2013ay201

    Effects of Intermittent IL-2 Alone or with Peri-Cycle Antiretroviral Therapy in Early HIV Infection: The STALWART Study

    Get PDF
    The Study of Aldesleukin with and without antiretroviral therapy (STALWART) evaluated whether intermittent interleukin-2 (IL-2) alone or with antiretroviral therapy (ART) around IL-2 cycles increased CD4+ counts compared to no therapy

    THE RATE OF BINARY BLACK HOLE MERGERS INFERRED FROM ADVANCED LIGO OBSERVATIONS SURROUNDING GW150914

    Get PDF
    A transient gravitational-wave signal, GW150914, was identi fi ed in the twin Advanced LIGO detectors on 2015 September 2015 at 09:50:45 UTC. To asse ss the implications of this discovery, the detectors remained in operation with unchanged con fi gurations over a period of 39 days around the time of t he signal. At the detection statistic threshold corresponding to that observed for GW150914, our search of the 16 days of simultaneous two-detector observational data is estimated to have a false-alarm rate ( FAR ) of < ́ -- 4.9 10 yr 61 , yielding a p -value for GW150914 of < ́ - 210 7 . Parameter estimation follo w-up on this trigger identi fi es its source as a binary black hole ( BBH ) merger with component masses ( )( ) = - + - + mm M ,36,29 12 4 5 4 4 at redshift = - + z 0.09 0.04 0.03 ( median and 90% credible range ) . Here, we report on the constraints these observations place on the rate of BBH coalescences. Considering only GW150914, assuming that all BBHs in the universe have the same masses and spins as this event, imposing a search FAR threshold of 1 per 100 years, and assuming that the BBH merger rate is constant in the comoving frame, we infer a 90% credible range of merger rates between – -- 2 53 Gpc yr 31 ( comoving frame ) . Incorporating all search triggers that pass a much lower threshold while accounting for the uncerta inty in the astrophysical origin of each trigger, we estimate a higher rate, ranging from – -- 13 600 Gpc yr 31 depending on assumptions about the BBH mass distribution. All together, our various rate estimat es fall in the conservative range – -- 2 600 Gpc yr 31

    RCRA (Resource Conservation and Recovery Act) ground-water monitoring projects for Hanford facilities: Annual progress report for 1988

    No full text
    This report describes the progress during 1988 of 14 Hanford Site ground-water monitoring projects covering 16 hazardous waste facilities and 1 nonhazardous waste facility (the Solid Waste Landfill). Each of the projects is being conducted according to federal regulations based on the Resource Conservation and Recovery Act (RCRA) of 1976 and the State of Washington Administrative Code. 21 refs., 23 figs., 8 tabs

    Resource conservation and recovery act ground-water monitoring projects for Hanford facilities: Progress report for the period July 1 to September 30, 1988: Volume 2, Appendices

    Get PDF
    This is Volume 2 of a two-volume set of documents that describes the progress of 12 Hanford Site ground-water monitoring projects for the period July 1 to September 30, 1988. This volume provides those drilling logs and well inspection/completion reports inadvertently left out of last quarter&#x27;s report for the 216-A-36B Crib (Appendix A) and as-built diagrams, drilling logs, and geophysical logs for wells drilled this quarter near the 2101-M Pond. Volume 1 discusses the 12 projects

    Resource Conservation and Recovery Act ground-water monitoring projects for Hanford facilities: Progress report for the period July 1 to September 30, 1988: Volume 1, Text

    No full text
    This report describes the progress of 12 Hanford ground-water monitoring projects for the period July 1 to September 30, 1988. During this quarter, field activities at the 300 Area process trenches, the Nonradioactive Dangerous Waste Landfill, the 183-H Solar Evaporation Basins, the 1324-N/NA Surface Impoundment and Percolation Ponds, the 1301-N and 1325-N Liquid Waste Disposal Facilities, and the 216-A-36B Crib consisted of ground-water sampling and analyses, and water-level monitoring. The 200 Area Low-Level Burial Grounds section includes well development data, sediment analysis, and water-level measurements. Ground-water sampling was begun at this site, and results will be included in next quarter&#x27;s report. Twelve new wells were installed during the quarter, two at the 216-A-29 Ditch, size at the 216-A-10 Crib, and four at the 216-B-3 Pond. Preliminary characterization data for these new wells are included in this report. Driller&#x27;s logs and other drilling and site characterization data will be provided in the next quarterly report. At the 2101-M Pond, construction was completed on four wells, and initial ground-water samples were taken. The drilling logs, geophysical logging data, and as-built diagrams are included in this report in Volume 2. 19 refs., 24 figs., 39 tabs

    RCRA (Resource Conservation and Recovery Act of 1976) ground-water monitoring projects for Hanford facilities: Progress report, October 1--December 31, 1988: Volume 1, Text

    No full text
    This report describes the progress of 13 Hanford ground-water monitoring projects for the period October 1 to December 31, 1988. There are 16 individual hazardous waste facilities covered by the 13 ground-water monitoring projects. The Grout Treatment Facility is included in this series of quarterly reports for the first time. The 13 projects discussed in this report were designed according to applicable interim-status ground-water monitoring requirements specified in the Resource Conservation and Recovery Act of 1976 (RCRA). During this quarter, field activities primarily consisted of sampling and analyses, and water-level monitoring. The 200 Areas Low-Level Burial Grounds section includes sediment analyses in addition to ground-water monitoring results. Twelve new wells were installed during the previous quarter: two at the 216-A-29 Ditch, six at the 216-A-10 Crib, and four at the 216-B-3 Pond. Preliminary characterization data for these new wells include drillers&#x27; logs and other drilling and site characterization data, and are provided in Volume 2 or on microfiche in the back of Volume 1. 26 refs., 28 figs., 74 tabs
    corecore