    Stress ribbon bridge across the deep valley

    No full text
    The topic of this thesis is a design of stress ribbon bridge across the deep valley. The construction of the footbridge contains stress ribbon bridge with external cables and final prestressing tendons. The bridge deck is in a parabolic arc and the suspension cables are in two bend down parabolic arcs. The construction is reproduced for evaluation of longitudinal direction in the Ansys 14.0 programme and for transversal direction in the Scia Engineer 15.1 programme. The model was solved in several phases, nonlinerally. The pier was reproduced in the Scia Engineer 15.1 programme for local effect of action. The construction was evaluated for dynamic action. The construction is assessed according to the actual EN standards