428 research outputs found
“We’re in this together”: Changing intra-household decision making for more cooperative smallholder farming
Conceptualising smallholder farming households as collective action institutions,
that make interrelated decisions about investment, resource use and allocation in a common
household farm, may contribute to understanding widely observed uncooperative outcomes,
such as yield gaps, gender gaps in productivity, suboptimal or Pareto inefficient sustainable intensification
and climate change adaptation. We examine the relation between participatory
intra-household decision making – as a set of ‘rules of the game’ that reduces information and
bargaining power asymmetries – and cooperative, i.e. more efficient, sustainable and equitable,
outcomes in smallholder coffee farming households in Uganda. We find experimental evidence
that participatory decision making is positively related to investments in the common household
farm. Consumption behaviour however is not fairer nor more sustainable. Participatory decision
making is associated with more cooperative actual outcomes such as greater investment in sustainable
intensification, consideration of women’s interests, fairer reproductive intra-household
labour division, more balanced control over cash crop income and improved livelihoods
Raising irrigation productivity and releasing water for intersectoral needs (RIPARWIN): RIPARWIN final technical report
River basinsHydrologyRiver basin managementRiver basin developmentDevelopment projectsWater allocationIrrigation waterProductivityIrrigation managementRiceTanzaniaGreat Ruaha River BasinUsangu River Basin
Globalization intentions in tension: The case of Singapore
10.1177/0020872810371202International Social Work535671-68
Private finance for the delivery of school projects in England
This paper analyses the use of the private finance initiative (PFI) approach to deliver school projects in England. The findings are based on case-study research in the Building Schools for the Future scheme (BSF), the largest single capital investment in SO years to rebuild and renew all of England's secondary schools. Up to half of the school infrastructure is to be procured by PFI contracts. A major concern has been the high cost associated with PFI procurement and any subsequent changes to scope. Furthermore, in some cases PFI-funded schools have been closed soon after completion; at great cost to the public sector. The aim of this research was therefore to
understand the underlying reasons for these problems.
The main conclusion is that the difficulties in BSF arise
from not sorting out strategic issues and instituting
appropriate organisational frameworks before engaging
the private sector. The result of this is a lack of clarity
about the long-term needs and end user aspirations. A
brief outline of current programme management methods
is given and it is suggested that this might be integral to
the successful delivery of schools using private finance. A
clear strategic vision that cascades into projects via
programmes will ensure that the school infrastructure is
appropriate for the anticipated strategic benefits and is
aligned to the overall service delivery ambitions
Stakeholders' role in improving Ghana's construction safety
Health and safety (H&S) management has traditionally been the responsibility of the contractor. Most often, contractors are blamed for the accidents and other ill health that occur on their construction sites. H&S performance is, however, enhanced when there is effective collaboration between those involved in the construction process. This paper therefore explores the role of stakeholders in promoting construction H&S in Ghana through public works procurement. The four main stakeholders identified and evaluated in this study are the government, the client (employer), the contractor and the employee(s). Seven interviewees (comprising procurement managers, consultants and quantity surveyors) from public institutions in Ghana participated in the research. Data were collected using semi-structured interviews and were thematically analysed. Results indicate a conflict in the perceived functions and relation of these stakeholders in the construction process. To address the constraint to improving construction H&S, certain recommendations are offered. These include the identification of specific individuals responsible for supervision and employee training, the development of H&S policies by the government and contracts that clearly outline the contractual obligations of all parties involved. Additionally, the specific roles and involvements of other stakeholders in the procurement process in improving construction H&S are also outlined
Environmental impact assessments of the Three Gorges Project in China: issues and interventions
The paper takes China's authoritative Environmental Impact Statement for the Yangzi (Yangtze) Three Gorges Project (TGP) in 1992 as a benchmark against which to evaluate emerging major environmental outcomes since the initial impoundment of the Three Gorges reservoir in 2003. The paper particularly examines five crucial environmental aspects and associated causal factors. The five domains include human resettlement and the carrying capacity of local environments (especially land), water quality, reservoir sedimentation and downstream riverbed erosion, soil erosion, and seismic activity and geological hazards. Lessons from the environmental impact assessments of the TGP are: (1) hydro project planning needs to take place at a broader scale, and a strategic environmental assessment at a broader scale is necessary in advance of individual environmental impact assessments; (2) national policy and planning adjustments need to react quickly to the impact changes of large projects; (3) long-term environmental monitoring systems and joint operations with other large projects in the upstream areas of a river basin should be established, and the cross-impacts of climate change on projects and possible impacts of projects on regional or local climate considered. © 2013 Elsevier B.V.Xibao Xu, Yan Tan, Guishan Yan
Legal Empowerment and Horizontal Inequalities after Conflict
This article explores whether legal empowerment can address horizontal inequalities in post-conflict settings, and, if so, how. It argues that legal empowerment has modest potential to reduce these inequalities. Nevertheless, there are risks that legal empowerment might contribute to a strengthening of group identities, reduction of social cohesion, and, in the worst case, triggering of conflict. It looks at how two legal empowerment programmes in Liberia navigated the tensions between equity and peace
Adalimumab, etanercept and ustekinumab for treating plaque psoriasis in children and young people: systematic review and economic evaluation
Background: Psoriasis is a chronic inflammatory disease that predominantly affects the skin. Adalimumab (HUMIRA®, AbbVie, Maidenhead, UK), etanercept (Enbrel®, Pfizer, New York, NY, USA) and ustekinumab (STELARA®, Janssen Biotech, Inc., Titusville, NJ, USA) are the three biological treatments currently licensed for psoriasis in children. Objective: To determine the clinical effectiveness and cost-effectiveness of adalimumab, etanercept and ustekinumab within their respective licensed indications for the treatment of plaque psoriasis in children and young people. Data sources: Searches of the literature and regulatory sources, contact with European psoriasis registries, company submissions and clinical study reports from manufacturers, and previous National Institute for Health and Care Excellence (NICE) technology appraisal documentation. Review methods: Included studies were summarised and subjected to detailed critical appraisal. A network meta-analysis incorporating adult data was developed to connect the effectiveness data in children and young people and populate a de novo decision-analytic model. The model estimated the cost-effectiveness of adalimumab, etanercept and ustekinumab compared with each other and with either methotrexate or best supportive care (BSC), depending on the position of the intervention in the management pathway. Results: Of the 2386 non-duplicate records identified, nine studies (one randomised controlled trial for each drug plus six observational studies) were included in the review of clinical effectiveness and safety. Etanercept and ustekinumab resulted in significantly greater improvements in psoriasis symptoms than placebo at 12 weeks’ follow-up. The magnitude and persistence of the effects beyond 12 weeks is less certain. Adalimumab resulted in significantly greater improvements in psoriasis symptoms than methotrexate for some but not all measures at 16 weeks. Quality-of-life benefits were inconsistent across different measures. There was limited evidence of excess short-term adverse events; however, the possibility of rare events cannot be excluded. The majority of the incremental cost-effectiveness ratios for the use of biologics in children and young people exceeded NICE’s usual threshold for cost-effectiveness and were reduced significantly only when combined assumptions that align with those made in the management of psoriasis in adults were adopted. Limitations: The clinical evidence base for short- and long-term outcomes was limited in terms of total participant numbers, length of follow-up and the absence of young children. Conclusions: The paucity of clinical and economic evidence to inform the cost-effectiveness of biological treatments in children and young people imposed a number of strong assumptions and uncertainties. Health-related quality-of-life (HRQoL) gains associated with treatment and the number of hospitalisations in children and young people are areas of considerable uncertainty. The findings suggest that biological treatments may not be cost-effective for the management of psoriasis in children and young people at a willingness-to-pay threshold of £30,000 per quality-adjusted life-year, unless a number of strong assumptions about HRQoL and the costs of BSC are combined. Registry data on biological treatments would help determine safety, patterns of treatment switching, impact on comorbidities and long-term withdrawal rates. Further research is also needed into the resource use and costs associated with BSC. Adequately powered randomised controlled trials (including comparisons against placebo) could substantially reduce the uncertainty surrounding the effectiveness of biological treatments in biologic-experienced populations of children and young people, particularly in younger children. Such trials should establish the impact of biological therapies on HRQoL in this population, ideally by collecting direct estimates of EuroQol-5 Dimensions for Youth (EQ-5D-Y) utilities. Study registration: This study is registered as PROSPERO CRD42016039494. Funding: The National Institute for Health Research Health Technology Assessment programme
Modeling the Total Allowable Area for Coastal Reclamation : a case study of Xiamen, China
Author Posting. © The Author(s), 2013. This is the author's version of the work. It is posted here by permission of Elsevier B.V. for personal use, not for redistribution. The definitive version was published in Ocean & Coastal Management 76 (2013):38-44, doi:10.1016/j.ocecoaman.2013.02.015.This paper presents an analytical framework to estimate the Total Allowable Area for Coastal Reclamation (TAACR) to provide scientific support for the implementation of a coastal reclamation restriction mechanism. The logic of the framework is to maximize the net benefits of coastal reclamation subject to a set of constraints. Various benefits and costs, including the ecological and environmental costs of coastal reclamation, are systematically quantified in the framework. Model simulations are developed using data from Tongan Bay of Xiamen. The results suggest that the TAACR in Tongan Bay is 5.67 km2, and the area of the Bay should be maintained at least at 87.52 km2.The study was funded by the National Oceanic Public Welfare Projects (No. 201105006) and the Fujian Natural Science Foundation (No. 2010J01360
- …
