50,711 research outputs found

    Improvement of speed response in four-phase DC–DC converter switching using two shunt voltage-source

    Get PDF
    This study proposes a technique that is able to improve the speed response of a four-phase DC–DC converter switching. The basic concept of the proposed technique is the inclusion of two shunt-connected voltage sources in series to the converter system. Using a higher input voltage to drive the load, a higher current per microsecond output system will be obtained and reverts to its nominal input upon obtaining desired references. Thus, the transient response observed when using this proposed technique is found to be much faster when compared to the conventional converter. Moreover, this technique is easily implemented as it requires only an additional voltage source, power switch, and power diode. The integrated model of the two shunt voltage-source in a four-phase DC–DC converter was simulated in MATLAB/Simulink and validated against the experimental results of a laboratory prototype, 600 W four-phase DC–DC converter. The novelty of this proposed technique is its ability to provide faster operations for critical loads applications, lower output capacitor and lower operating frequency

    Advancing automation and robotics technology for the space station and for the US economy: Submitted to the United States Congress October 1, 1987

    Get PDF
    In April 1985, as required by Public Law 98-371, the NASA Advanced Technology Advisory Committee (ATAC) reported to Congress the results of its studies on advanced automation and robotics technology for use on the space station. This material was documented in the initial report (NASA Technical Memorandum 87566). A further requirement of the Law was that ATAC follow NASA's progress in this area and report to Congress semiannually. This report is the fifth in a series of progress updates and covers the period between 16 May 1987 and 30 September 1987. NASA has accepted the basic recommendations of ATAC for its space station efforts. ATAC and NASA agree that the mandate of Congress is that an advanced automation and robotics technology be built to support an evolutionary space station program and serve as a highly visible stimulator affecting the long-term U.S. economy

    Simulation in manufacturing and business: A review

    Get PDF
    Copyright @ 2009 Elsevier B.V.This paper reports the results of a review of simulation applications published within peer-reviewed literature between 1997 and 2006 to provide an up-to-date picture of the role of simulation techniques within manufacturing and business. The review is characterised by three factors: wide coverage, broad scope of the simulation techniques, and a focus on real-world applications. A structured methodology was followed to narrow down the search from around 20,000 papers to 281. Results include interesting trends and patterns. For instance, although discrete event simulation is the most popular technique, it has lower stakeholder engagement than other techniques, such as system dynamics or gaming. This is highly correlated with modelling lead time and purpose. Considering application areas, modelling is mostly used in scheduling. Finally, this review shows an increasing interest in hybrid modelling as an approach to cope with complex enterprise-wide systems

    Factors shaping the evolution of electronic documentation systems

    Get PDF
    The main goal is to prepare the space station technical and managerial structure for likely changes in the creation, capture, transfer, and utilization of knowledge. By anticipating advances, the design of Space Station Project (SSP) information systems can be tailored to facilitate a progression of increasingly sophisticated strategies as the space station evolves. Future generations of advanced information systems will use increases in power to deliver environmentally meaningful, contextually targeted, interconnected data (knowledge). The concept of a Knowledge Base Management System is emerging when the problem is focused on how information systems can perform such a conversion of raw data. Such a system would include traditional management functions for large space databases. Added artificial intelligence features might encompass co-existing knowledge representation schemes; effective control structures for deductive, plausible, and inductive reasoning; means for knowledge acquisition, refinement, and validation; explanation facilities; and dynamic human intervention. The major areas covered include: alternative knowledge representation approaches; advanced user interface capabilities; computer-supported cooperative work; the evolution of information system hardware; standardization, compatibility, and connectivity; and organizational impacts of information intensive environments

    WFIRST Coronagraph Technology Requirements: Status Update and Systems Engineering Approach

    Full text link
    The coronagraphic instrument (CGI) on the Wide-Field Infrared Survey Telescope (WFIRST) will demonstrate technologies and methods for high-contrast direct imaging and spectroscopy of exoplanet systems in reflected light, including polarimetry of circumstellar disks. The WFIRST management and CGI engineering and science investigation teams have developed requirements for the instrument, motivated by the objectives and technology development needs of potential future flagship exoplanet characterization missions such as the NASA Habitable Exoplanet Imaging Mission (HabEx) and the Large UV/Optical/IR Surveyor (LUVOIR). The requirements have been refined to support recommendations from the WFIRST Independent External Technical/Management/Cost Review (WIETR) that the WFIRST CGI be classified as a technology demonstration instrument instead of a science instrument. This paper provides a description of how the CGI requirements flow from the top of the overall WFIRST mission structure through the Level 2 requirements, where the focus here is on capturing the detailed context and rationales for the CGI Level 2 requirements. The WFIRST requirements flow starts with the top Program Level Requirements Appendix (PLRA), which contains both high-level mission objectives as well as the CGI-specific baseline technical and data requirements (BTR and BDR, respectively)... We also present the process and collaborative tools used in the L2 requirements development and management, including the collection and organization of science inputs, an open-source approach to managing the requirements database, and automating documentation. The tools created for the CGI L2 requirements have the potential to improve the design and planning of other projects, streamlining requirement management and maintenance. [Abstract Abbreviated]Comment: 16 pages, 4 figure
    • …
    corecore