91 research outputs found

    A survey of scheduling problems with setup times or costs

    Get PDF
    Author name used in this publication: C. T. NgAuthor name used in this publication: T. C. E. Cheng2007-2008 > Academic research: refereed > Publication in refereed journalAccepted ManuscriptPublishe

    An agent-based genetic algorithm for hybrid flowshops with sequence dependent setup times to minimise makespan

    Full text link
    This paper deals with a variant of flowshop scheduling, namely, the hybrid or flexible flowshop with sequence dependent setup times. This type of flowshop is frequently used in the batch production industry and helps reduce the gap between research and operational use. This scheduling problem is NP-hard and solutions for large problems are based on non-exact methods. An improved genetic algorithm (GA) based on software agent design to minimise the makespan is presented. The paper proposes using an inherent characteristic of software agents to create a new perspective in GA design. To verify the developed metaheuristic, computational experiments are conducted on a well-known benchmark problem dataset. The experimental results show that the proposed metaheuristic outperforms some of the well-known methods and the state-of-art algorithms on the same benchmark problem dataset.The translation of this paper was funded by Universidad Politecnica de Valencia, Spain.Gómez Gasquet, P.; Andrés Romano, C.; Lario Esteban, FC. (2012). An agent-based genetic algorithm for hybrid flowshops with sequence dependent setup times to minimise makespan. Expert Systems with Applications. 39(9):8095-8107. https://doi.org/10.1016/j.eswa.2012.01.158S8095810739

    Minimizing the makespan in a flexible flowshop with sequence dependent setup times, uniform machines, and limited buffers

    Get PDF
    This research addresses the problem of minimizing the makespan in a flexible flowshop with sequence dependent setup times, uniform machines, and limited buffers. A mathematical model was developed to solve this problem. The problem is NP-Hard in the strong sense and only very small problems could be solved optimally. For exact methods, the computation times are long and not practical even when the problems are relatively small. Two construction heuristics were developed that could find solutions quickly. Also a simulated annealing heuristic was constructed that improved the solutions obtained from the construction heuristics. The combined heuristics could compute a good solution in a short amount of time. The heuristics were tested in three different environments: 3 stages, 4 stages, and 5 stages. To assess the quality of the solutions, a lower bound and two simple heuristics were generated for comparison purposes. The proposed heuristics showed steady improvement over the simple heuristics. When compared to the lower bounds, the heuristics performed well for the smaller environment, but the performance quality decreased as the number of stages increased. The combination of these heuristics defiantly shows promise for solving the problem

    A Linear Programming Model for Renewable Energy Aware Discrete Production Planning and Control

    Get PDF
    Industrial production in the EU, like other sectors of the economy, is obliged to stop producing greenhouse gas emissions by 2050. With its Green Deal, the European Union has already set the corresponding framework in 2019. To achieve Net Zero in the remaining time, while not endangering one's own competitiveness on a globalized market, a transformation of industrial value creation has to be started already today. In terms of energy supply, this means a comprehensive electrification of processes and a switch to fully renewable power generation. However, due to a growing share of renewable energy sources, increasing volatility can be observed in the European electricity market already. For companies, there are mainly two ways to deal with the accompanying increase in average electricity prices. The first is to reduce consumption by increasing efficiency, which naturally has its physical limits. Secondly, an increasing volatile electricity price makes it possible to take advantage of periods of relatively low prices. To do this, companies must identify their energy-intensive processes and design them in such a way as to enable these activities to be shifted in time. This article explains the necessary differentiation between labor-intensive and energy intensive processes. A general mathematical model for the holistic optimization of discrete industrial production is presented. With the help of this MILP model, it is simulated that a flexibilization of energy intensive processes with volatile energy prices can help to reduce costs and thus secure competitiveness while getting it in line with European climate goals. On the basis of real electricity market data, different production scenarios are compared, and it is investigated under which conditions the flexibilization of specific processes is worthwhile