68,636 research outputs found

    The interaction of lean and building information modeling in construction

    Get PDF
    Lean construction and Building Information Modeling are quite different initiatives, but both are having profound impacts on the construction industry. A rigorous analysis of the myriad specific interactions between them indicates that a synergy exists which, if properly understood in theoretical terms, can be exploited to improve construction processes beyond the degree to which it might be improved by application of either of these paradigms independently. Using a matrix that juxtaposes BIM functionalities with prescriptive lean construction principles, fifty-six interactions have been identified, all but four of which represent constructive interaction. Although evidence for the majority of these has been found, the matrix is not considered complete, but rather a framework for research to explore the degree of validity of the interactions. Construction executives, managers, designers and developers of IT systems for construction can also benefit from the framework as an aid to recognizing the potential synergies when planning their lean and BIM adoption strategies

    Requirements for building information modeling based lean production management systems for construction

    Get PDF
    Smooth flow of production in construction is hampered by disparity between individual trade teams' goals and the goals of stable production flow for the project as a whole. This is exacerbated by the difficulty of visualizing the flow of work in a construction project. While the addresses some of the issues in Building information modeling provides a powerful platform for visualizing work flow in control systems that also enable pull flow and deeper collaboration between teams on and off site. The requirements for implementation of a BIM-enabled pull flow construction management software system based on the Last Planner System™, called ‘KanBIM’, have been specified, and a set of functional mock-ups of the proposed system has been implemented and evaluated in a series of three focus group workshops. The requirements cover the areas of maintenance of work flow stability, enabling negotiation and commitment between teams, lean production planning with sophisticated pull flow control, and effective communication and visualization of flow. The evaluation results show that the system holds the potential to improve work flow and reduce waste by providing both process and product visualization at the work face

    Is agile project management applicable to construction?

    Get PDF
    This paper briefly summarises the evolution of Agile Project Management (APM) and differentiates it from lean and agile production and ‘leagile’ construction. The significant benefits being realized through employment of APM within the information systems industry are stated. The characteristics of APM are explored, including: philosophy, organizational attitudes and practices, planning, execution and control and learning. Finally, APM is subjectively assessed as to its potential contribution to the pre-design, design and construction phases. In conclusion, it is assessed that APM offers considerable potential for application in predesign and design but that there are significant hurdles to its adoption in the actual construction phase. Should these be overcome, APM offers benefits well beyond any individual project

    Influential factors of aligning Spotify squads in mission-critical and offshore projects – a longitudinal embedded case study

    Get PDF
    Changing the development process of an organization is one of the toughest and riskiest decisions. This is particularly true if the known experiences and practices of the new considered ways of working are relative and subject to contextual assumptions. Spotify engineering culture is deemed as a new agile software development method which increasingly attracts large-scale organizations. The method relies on several small cross-functional self-organized teams (i.e., squads). The squad autonomy is a key driver in Spotify method, where a squad decides what to do and how to do it. To enable effective squad autonomy, each squad shall be aligned with a mission, strategy, short-term goals and other squads. Since a little known about Spotify method, there is a need to answer the question of: How can organizations work out and maintain the alignment to enable loosely coupled and tightly aligned squads? In this paper, we identify factors to support the alignment that is actually performed in practice but have never been discussed before in terms of Spotify method. We also present Spotify Tailoring by highlighting the modified and newly introduced processes to the method. Our work is based on a longitudinal embedded case study which was conducted in a real-world large-scale offshore software intensive organization that maintains mission-critical systems. According to the confidentiality agreement by the organization in question, we are not allowed to reveal a detailed description of the features of the explored project

    How Do Real Options Concepts Fit in Agile Requirements Engineering?

    Get PDF
    Agile requirements engineering is driven by creating business value for the client and heavily involves the client in decision-making under uncertainty. Real option thinking seems to be suitable in supporting the client’s decision making process at inter-iteration time. This paper investigates the fit between real option thinking and agile requirements engineering. We first look into previously published experiences in the agile software engineering literature to identify (i) ‘experience clusters’ suggesting the ways in which real option concepts fit into the agile requirements process and (ii) ‘experience gaps’ and under-researched agile requirements decision-making topics which require further empirical studies. Furthermore, we conducted a cross-case study in eight agile development organizations and interviewed 11 practitioners about their decision-making process. The results suggest that options are almost always identified, reasoned about and acted upon. They are not expressed in quantitative terms, however, they are instead explicitly or implicitly taken\ud into account during the decision-making process at interiteration time

    Global Innovations in Measurement and Evaluation

    Get PDF
    We researched the latest developments in theory and practice in measurement and evaluation. And we found that new thinking, techniques, and technology are influencing and improving practice. This report highlights 8 developments that we think have the greatest potential to improve evaluation and programme design, and the careful collection and use of data. In it, we seek to inform and inspire—to celebrate what is possible, and encourage wider application of these ideas

    Lean and green – a systematic review of the state of the art literature

    Get PDF
    The move towards greener operations and products has forced companies to seek alternatives to balance efficiency gains and environmental friendliness in their operations and products. The exploration of the sequential or simultaneous deployment of lean and green initiatives is the results of this balancing action. However, the lean-green topic is relatively new, and it lacks of a clear and structured research definition. Thus, this paper’s main contribution is the offering of a systematic review of the existing literature on lean and green, aimed at providing guidance on the topic, uncovering gaps and inconsistencies in the literature, and finding new paths for research. The paper identifies and structures, through a concept map, six main research streams that comprise both conceptual and empirical research conducted within the context of various organisational functions and industrial sectors. Important issues for future research are then suggested in the form of research questions. The paper’s aim is to also contribute by stimulating scholars to further study this area in depth, which will lead to a better understanding of the compatibility and impact on organisational performance of lean and green initiatives. It also holds important implications for industrialists, who can develop a deeper and richer knowledge on lean and green to help them formulate more effective strategies for their deployment

    Analysis framework for the interaction between lean construction and building information modelling

    Get PDF
    Building with Building Information Modelling (BIM) changes design and production processes. But can BIM be used to support process changes designed according to lean production and lean construction principles? To begin to answer this question we provide a conceptual analysis of the interaction of lean construction and BIM for improving construction. This was investigated by compiling a detailed listing of lean construction principles and BIM functionalities which are relevant from this perspective. These were drawn from a detailed literature survey. A research framework for analysis of the interaction between lean and BIM was then compiled. The goal of the framework is to both guide and stimulate research; as such, the approach adopted up to this point is constructive. Ongoing research has identified 55 such interactions, the majority of which show positive synergy between the two
    corecore