72 research outputs found

    Reception Test of Petals for the End Cap TEC+ of the CMS Silicon Strip Tracker

    Get PDF
    The silicon strip tracker of the CMS experiment has been completed and was inserted into the CMS detector in late 2007. The largest sub system of the tracker are its end caps, comprising two large end caps (TEC) each containing 3200 silicon strip modules. To ease construction, the end caps feature a modular design: groups of about 20 silicon modules are placed on sub-assemblies called petals and these self-contained elements are then mounted onto the TEC support structures. Each end cap consists of 144 such petals, which were built and fully qualified by several institutes across Europe. Fro

    Integration of the End Cap TEC+ of the CMS Silicon Strip Tracker

    Get PDF
    The silicon strip tracker of the CMS experiment has been completed and inserted into the CMS detector in late 2007. The largest sub-system of the tracker is its end cap system, comprising two large end caps (TEC) each containing 3200 silicon strip modules. To ease construction, the end caps feature a modular design: groups of about 20 silicon modules are placed on sub-assemblies called petals and these self-contained elements are then mounted into the TEC support structures. Each end cap consists of 144 petals, and the insertion of these petals into the end cap structure is referred to as TEC integration. The two end caps were integrated independently in Aachen (TEC+) and at CERN (TEC--). This note deals with the integration of TEC+, describing procedures for end cap integration and for quality control during testing of integrated sections of the end cap and presenting results from the testing

    Ponte et stratégie de la reproduction chez les femelles du tacaud Trisopterus luscus (Gadidés) du plateau continental de la Galice, nord-ouest de l'Espagne

    Get PDF
    [EN] Pouting, Trisopterus luscus is harvested commercially on the Galician shelf by the Spanish inshore artisanal fleet. In spite of a substantial decrease in pouting catches, fishery regulations are limited to size length restrictions. This study provides biological data including length-at-maturity based on histological methods, seasonal maturation, spawning and fecundity. A collection 443 females, from 17 to 42 cm in total length, were sampled from landings (December 2003 to December 2004). Pouting length-at-maturity was estimated as 19.2 cm on average. Pouting females in spawning condition were observed throughout the year and the number of developing oocytes ranged from 20 000 to 1 327 000. Peak spawning was observed between February and April, which correlated well with trends in gonadosomatic index, and inverse to condition factor and hepatosomatic index. Histological examination of the gonads revealed that pouting ovarian development organization is asynchronous, and fecundity is probably determinate.[FR] Le tacaud, Trisopterus luscus est pêché par la flotte artisanale espagnole. En dépit d'une diminution substantielle des captures de tacaud, la pêche est réglementée uniquement à partir d'une taille minimum commerciale. Cette étude fournit des données biologiques comprenant la taille à maturité sexuelle basée sur l'histologie, la maturation saisonnière, la ponte et la fécondité. Un échantillon de 443 femelles, de 17 à 42 cm longueur totale, est examiné à partir des débarquements durant une année (de décembre 2003 à décembre 2004). La taille moyenne à maturité sexuelle est estimée à 19,2 cm. Les femelles de tacaud en condition de ponte sont observée tout au long de l'année et le nombre d'ovocytes s'étend de 20 000 to 1 327 000 par individu. Les pics de ponte sont observés entre février et avril, ce qui est bien corrélé avec l'évolution du rapport gonado-somatique et inverse de celle du facteur de condition et du rapport hépato-somatique. L'étude histologique révèle que le développement ovarien chez le tacaud est asynchrone, et que la fécondité est probablement déterminée.Peer reviewe

    Alignment of the CMS tracker with LHC and cosmic ray data

    Get PDF
    © CERN 2014 for the benefit of the CMS collaboration, published under the terms of the Creative Commons Attribution 3.0 License by IOP Publishing Ltd and Sissa Medialab srl. Any further distribution of this work must maintain attribution to the author(s) and the published article's title, journal citation and DOI.The central component of the CMS detector is the largest silicon tracker ever built. The precise alignment of this complex device is a formidable challenge, and only achievable with a significant extension of the technologies routinely used for tracking detectors in the past. This article describes the full-scale alignment procedure as it is used during LHC operations. Among the specific features of the method are the simultaneous determination of up to 200 000 alignment parameters with tracks, the measurement of individual sensor curvature parameters, the control of systematic misalignment effects, and the implementation of the whole procedure in a multi-processor environment for high execution speed. Overall, the achieved statistical accuracy on the module alignment is found to be significantly better than 10μm

    DC-DC Buck Converters for the CMS Upgrade at SLHC

    No full text
    The CMS experiment at the Large Hadron Collider (LHC) at CERN, Geneva, is planning major upgrades of its current pixel and strip detectors for the LHC luminosity upgrade, known as the SLHC. Due to the larger channel count and - in case of the strip tracker - increased functionality, the powering scheme adopted today, namely parallel powering of several detector modules, has to be abandoned. Instead, a powering scheme based on the DC-DC conversion technique is foreseen, which would lead to lower power losses in the supply cables, and would allow to reduce the material budget of cables and associated electronic boards in the sensitive detector volume. \\ This paper deals with the development, characterisation and optimisation of DC-DC buck converter prototypes for the upgrades of the CMS pixel and strip detectors at the SLHC

    DC-DC Conversion Powering Schemes for the CMS Tracker Upgrade

    No full text
    The CMS experiment foresees upgrades of its silicon pixel and strip detectors for the luminosity upgrade of the Large Hadron Collider (LHC), CERN. Due to an increase in the number of readout channels and higher complexity, larger currents will have to be provided to the detector. Since cable channels are difficult to access and space for cables is limited, this would lead to excessively large resistive power losses in the supply cables, which increase with the current squared. CMS has therefore chosen a novel powering scheme based on DC-DC converters, which allows power to be delivered at a higher voltage and consequently lower current. The development of low-mass, low-noise DC-DC converters for application in CMS is presented, including studies of switching noise, magnetic emissions and power efficiency as well as system tests with silicon strip and pixel modules. A scheme for the integration of DC-DC converters in the silicon pixel detector, currently foreseen to be exchanged around 2016, will be discussed
    corecore