198 research outputs found
Common Due-Date Problem: Exact Polynomial Algorithms for a Given Job Sequence
This paper considers the problem of scheduling jobs on single and parallel
machines where all the jobs possess different processing times but a common due
date. There is a penalty involved with each job if it is processed earlier or
later than the due date. The objective of the problem is to find the assignment
of jobs to machines, the processing sequence of jobs and the time at which they
are processed, which minimizes the total penalty incurred due to tardiness or
earliness of the jobs. This work presents exact polynomial algorithms for
optimizing a given job sequence or single and parallel machines with the
run-time complexities of and respectively, where
is the number of jobs and the number of machines. The algorithms take a
sequence consisting of all the jobs as input and
distribute the jobs to machines (for ) along with their best completion
times so as to get the least possible total penalty for this sequence. We prove
the optimality for the single machine case and the runtime complexities of
both. Henceforth, we present the results for the benchmark instances and
compare with previous work for single and parallel machine cases, up to
jobs.Comment: 15th International Symposium on Symbolic and Numeric Algorithms for
Scientific Computin
Permutation Flowshop Scheduling with Earliness and Tardiness Penalties
We address the permutation flowshop scheduling problem with earliness and tardiness penalties (E/T) and common due date of jobs. Large number of process and discrete parts industries follow flowshop type of production process. There are very few results reported for multi-machine E/T scheduling problems. We show that the problem can be sub-divided into three groups- one, where the due date is such that all jobs are necessarily tardy; the second, where the due date is such that it is not tight enough to act as a constraint on scheduling decision; and the third is a group of problems where the due date is in between the above two. We develop analytical results and heuristics for problems arising in each of these three classes. Computational results of the heuristics are reported. Most of the problems in this research are addressed for the first time in the literature. For problems with existing heuristics, the heuristic solution is found to perform better than the existing results.
A Novel Approach to the Common Due-Date Problem on Single and Parallel Machines
This paper presents a novel idea for the general case of the Common Due-Date
(CDD) scheduling problem. The problem is about scheduling a certain number of
jobs on a single or parallel machines where all the jobs possess different
processing times but a common due-date. The objective of the problem is to
minimize the total penalty incurred due to earliness or tardiness of the job
completions. This work presents exact polynomial algorithms for optimizing a
given job sequence for single and identical parallel machines with the run-time
complexities of for both cases, where is the number of jobs.
Besides, we show that our approach for the parallel machine case is also
suitable for non-identical parallel machines. We prove the optimality for the
single machine case and the runtime complexities of both. Henceforth, we extend
our approach to one particular dynamic case of the CDD and conclude the chapter
with our results for the benchmark instances provided in the OR-library.Comment: Book Chapter 22 page
Minimizing weighted total earliness, total tardiness and setup costs
The paper considers a (static) portfolio system that satisfies adding-up contraints and the gross substitution theorem. The paper shows the relationship of the two conditions to the weak dominant diagonal property of the matrix of interest rate elasticities. This enables to investigate the impact of simultaneous changes in interest rates on the asset demands.
Hybrid Genetic Bees Algorithm applied to Single Machine Scheduling with Earliness and Tardiness Penalties
This paper presents a hybrid Genetic-Bees Algorithm based optimised solution for the single machine scheduling problem. The enhancement of the Bees Algorithm (BA) is conducted using the Genetic Algorithm's (GA's) operators during the global search stage. The proposed enhancement aims to increase the global search capability of the BA gradually with new additions. Although the BA has very successful implementations on various type of optimisation problems, it has found that the algorithm suffers from weak global search ability which increases the computational complexities on NP-hard type optimisation problems e.g. combinatorial/permutational type optimisation problems. This weakness occurs due to using a simple global random search operation during the search process. To reinforce the global search process in the BA, the proposed enhancement is utilised to increase exploration capability by expanding the number of fittest solutions through the genetical variations of promising solutions. The hybridisation process is realised by including two strategies into the basic BA, named as â\u80\u9creinforced global searchâ\u80\u9d and â\u80\u9cjumping functionâ\u80\u9d strategies. The reinforced global search strategy is the first stage of the hybridisation process and contains the mutation operator of the GA. The second strategy, jumping function strategy, consists of four GA operators as single point crossover, multipoint crossover, mutation and randomisation. To demonstrate the strength of the proposed solution, several experiments were carried out on 280 well-known single machine benchmark instances, and the results are presented by comparing to other well-known heuristic algorithms. According to the experiments, the proposed enhancements provides better capability to basic BA to jump from local minima, and GBA performed better compared to BA in terms of convergence and the quality of results. The convergence time reduced about 60% with about 30% better results for highly constrained jobs
Group sequencing around a common due date
Author name used in this publication: C. T. Ng2007-2008 > Academic research: refereed > Publication in refereed journalAccepted ManuscriptPublishe
Heuristic and Exact Algorithms for the Two-Machine Just in Time Job Shop Scheduling Problem
The problem addressed in this paper is the two-machine job shop scheduling problem when the objective is to minimize the total earliness and tardiness from a common due date (CDD) for a set of jobs when their weights equal 1 (unweighted problem). This objective became very significant after the introduction of the Just in Time manufacturing approach. A procedure to determine whether the CDD is restricted or unrestricted is developed and a semirestricted CDD is defined. Algorithms are introduced to find the optimal solution when the CDD is unrestricted and semirestricted. When the CDD is restricted, which is a much harder problem, a heuristic algorithms proposed to find approximate solutions. Through computational experiments, the heuristic algorithms\u27 performance is evaluated with problems up to 500 jobs
Flowshop scheduling problems with due date related objectives: A review of the literature
3rd International Conference on Industrial Engineering and Industrial Management
XIII Congreso de Ingeniería de Organización
Barcelona-Terrassa, September 2nd-4th 200
- …