Heuristic and Exact Algorithms for the Two-Machine Just in Time Job Shop Scheduling Problem

Abstract

The problem addressed in this paper is the two-machine job shop scheduling problem when the objective is to minimize the total earliness and tardiness from a common due date (CDD) for a set of jobs when their weights equal 1 (unweighted problem). This objective became very significant after the introduction of the Just in Time manufacturing approach. A procedure to determine whether the CDD is restricted or unrestricted is developed and a semirestricted CDD is defined. Algorithms are introduced to find the optimal solution when the CDD is unrestricted and semirestricted. When the CDD is restricted, which is a much harder problem, a heuristic algorithms proposed to find approximate solutions. Through computational experiments, the heuristic algorithms\u27 performance is evaluated with problems up to 500 jobs

    Similar works