496 research outputs found
Models and Strategies for Variants of the Job Shop Scheduling Problem
Recently, a variety of constraint programming and Boolean satisfiability
approaches to scheduling problems have been introduced. They have in common the
use of relatively simple propagation mechanisms and an adaptive way to focus on
the most constrained part of the problem. In some cases, these methods compare
favorably to more classical constraint programming methods relying on
propagation algorithms for global unary or cumulative resource constraints and
dedicated search heuristics. In particular, we described an approach that
combines restarting, with a generic adaptive heuristic and solution guided
branching on a simple model based on a decomposition of disjunctive
constraints. In this paper, we introduce an adaptation of this technique for an
important subclass of job shop scheduling problems (JSPs), where the objective
function involves minimization of earliness/tardiness costs. We further show
that our technique can be improved by adding domain specific information for
one variant of the JSP (involving time lag constraints). In particular we
introduce a dedicated greedy heuristic, and an improved model for the case
where the maximal time lag is 0 (also referred to as no-wait JSPs).Comment: Principles and Practice of Constraint Programming - CP 2011, Perugia
: Italy (2011
Improving just-in-time delivery performance of IoT-enabled flexible manufacturing systems with AGV based material transportation
Autonomous guided vehicles (AGVs) are driverless material handling systems used for transportation of pallets and line side supply of materials to provide flexibility and agility in shop-floor logistics. Scheduling of shop-floor logistics in such systems is a challenging task due to their complex nature associated with the multiple part types and alternate material transfer routings. This paper presents a decision support system capable of supporting shop-floor decision-making activities during the event of manufacturing disruptions by automatically adjusting both AGV and machine schedules in Flexible Manufacturing Systems (FMSs). The proposed system uses discrete event simulation (DES) models enhanced by the Internet-of-Things (IoT) enabled digital integration and employs a nonlinear mixed integer programming Genetic Algorithm (GA) to find near-optimal production schedules prioritising the just-in-time (JIT) material delivery performance and energy efficiency of the material transportation. The performance of the proposed system is tested on the Integrated Manufacturing and Logistics (IML) demonstrator at WMG, University of Warwick. The results showed that the developed system can find the near-optimal solutions for production schedules subjected to production anomalies in a negligible time, thereby supporting shop-floor decision-making activities effectively and rapidly
Improving just-in-time delivery performance of IoT-enabled flexible manufacturing systems with AGV based material transportation
© 2020 by the authors. Licensee MDPI, Basel, Switzerland. Autonomous guided vehicles (AGVs) are driverless material handling systems used for transportation of pallets and line side supply of materials to provide flexibility and agility in shop-floor logistics. Scheduling of shop-floor logistics in such systems is a challenging task due to their complex nature associated with the multiple part types and alternate material transfer routings. This paper presents a decision support system capable of supporting shop-floor decision-making activities during the event of manufacturing disruptions by automatically adjusting both AGV and machine schedules in Flexible Manufacturing Systems (FMSs). The proposed system uses discrete event simulation (DES) models enhanced by the Internet-of-Things (IoT) enabled digital integration and employs a nonlinear mixed integer programming Genetic Algorithm (GA) to find near-optimal production schedules prioritising the just-in-time (JIT) material delivery performance and energy efficiency of the material transportation. The performance of the proposed system is tested on the Integrated Manufacturing and Logistics (IML) demonstrator at WMG, University of Warwick. The results showed that the developed system can find the near-optimal solutions for production schedules subjected to production anomalies in a negligible time, thereby supporting shop-floor decision-making activities effectively and rapidly
Bütünleşik tedarik zinciri çizelgeleme modelleri: Bir literatür taraması
Research on integration of supply chain and scheduling is relatively recent, and
number of studies on this topic is increasing. This study provides a comprehensive
literature survey about Integrated Supply Chain Scheduling (ISCS) models to help
identify deficiencies in this area. For this purpose, it is thought that this study will
contribute in terms of guiding researchers working in this field. In this study,
existing literature on ISCS problems are reviewed and summarized by introducing
the new classification scheme. The studies were categorized by considering the
features such as the number of customers (single or multiple), product lifespan
(limited or unlimited), order sizes (equal or general), vehicle characteristics
(limited/sufficient and homogeneous/heterogeneous), machine configurations and
number of objective function (single or multi objective). In addition, properties of
mathematical models applied for problems and solution approaches are also
discussed.Bütünleşik Tedarik Zinciri Çizelgeleme (BTZÇ) üzerine yapılan araştırmalar
nispeten yenidir ve bu konu üzerine yapılan çalışma sayısı artmaktadır. Bu çalışma,
bu alandaki eksiklikleri tespit etmeye yardımcı olmak için BTZÇ modelleri hakkında
kapsamlı bir literatür araştırması sunmaktadır. Bu amaçla, bu çalışmanın bu alanda
çalışan araştırmacılara rehberlik etmesi açısından katkı sağlayacağı
düşünülmektedir. Bu çalışmada, BTZÇ problemleri üzerine mevcut literatür gözden
geçirilmiş ve yeni sınıflandırma şeması tanıtılarak çalışmalar özetlenmiştir.
Çalışmalar; tek veya çoklu müşteri sayısı, sipariş büyüklüğü tipi (eşit veya genel),
ürün ömrü (sınırlı veya sınırsız), araç karakteristikleri (sınırlı/yeterli ve
homojen/heterojen), makine konfigürasyonları ve amaç fonksiyonu sayısı (tek veya
çok amaçlı) gibi özellikler dikkate alınarak kategorize edildi. Ayrıca problemler için
uygulanan matematiksel modellerin özellikleri ve çözüm yaklaşımları da
tartışılmıştır
Hybrid Genetic Bees Algorithm applied to Single Machine Scheduling with Earliness and Tardiness Penalties
This paper presents a hybrid Genetic-Bees Algorithm based optimised solution for the single machine scheduling problem. The enhancement of the Bees Algorithm (BA) is conducted using the Genetic Algorithm's (GA's) operators during the global search stage. The proposed enhancement aims to increase the global search capability of the BA gradually with new additions. Although the BA has very successful implementations on various type of optimisation problems, it has found that the algorithm suffers from weak global search ability which increases the computational complexities on NP-hard type optimisation problems e.g. combinatorial/permutational type optimisation problems. This weakness occurs due to using a simple global random search operation during the search process. To reinforce the global search process in the BA, the proposed enhancement is utilised to increase exploration capability by expanding the number of fittest solutions through the genetical variations of promising solutions. The hybridisation process is realised by including two strategies into the basic BA, named as â\u80\u9creinforced global searchâ\u80\u9d and â\u80\u9cjumping functionâ\u80\u9d strategies. The reinforced global search strategy is the first stage of the hybridisation process and contains the mutation operator of the GA. The second strategy, jumping function strategy, consists of four GA operators as single point crossover, multipoint crossover, mutation and randomisation. To demonstrate the strength of the proposed solution, several experiments were carried out on 280 well-known single machine benchmark instances, and the results are presented by comparing to other well-known heuristic algorithms. According to the experiments, the proposed enhancements provides better capability to basic BA to jump from local minima, and GBA performed better compared to BA in terms of convergence and the quality of results. The convergence time reduced about 60% with about 30% better results for highly constrained jobs
A survey of scheduling problems with setup times or costs
Author name used in this publication: C. T. NgAuthor name used in this publication: T. C. E. Cheng2007-2008 > Academic research: refereed > Publication in refereed journalAccepted ManuscriptPublishe
A new hybrid meta-heuristic algorithm for solving single machine scheduling problems
A dissertation submitted in partial ful lment of the
degree of Master of Science in Engineering (Electrical) (50/50)
in the
Faculty of Engineering and the Built Environment
Department of Electrical and Information Engineering
May 2017Numerous applications in a wide variety of elds has resulted in a rich history of research
into optimisation for scheduling. Although it is a fundamental form of the problem, the
single machine scheduling problem with two or more objectives is known to be NP-hard.
For this reason we consider the single machine problem a good test bed for solution
algorithms. While there is a plethora of research into various aspects of scheduling
problems, little has been done in evaluating the performance of the Simulated Annealing
algorithm for the fundamental problem, or using it in combination with other techniques.
Speci cally, this has not been done for minimising total weighted earliness and tardiness,
which is the optimisation objective of this work.
If we consider a mere ten jobs for scheduling, this results in over 3.6 million possible
solution schedules. It is thus of de nite practical necessity to reduce the search space in
order to nd an optimal or acceptable suboptimal solution in a shorter time, especially
when scaling up the problem size. This is of particular importance in the application
area of packet scheduling in wireless communications networks where the tolerance for
computational delays is very low. The main contribution of this work is to investigate
the hypothesis that inserting a step of pre-sampling by Markov Chain Monte Carlo
methods before running the Simulated Annealing algorithm on the pruned search space
can result in overall reduced running times.
The search space is divided into a number of sections and Metropolis-Hastings Markov
Chain Monte Carlo is performed over the sections in order to reduce the search space for
Simulated Annealing by a factor of 20 to 100. Trade-o s are found between the run time
and number of sections of the pre-sampling algorithm, and the run time of Simulated
Annealing for minimising the percentage deviation of the nal result from the optimal
solution cost. Algorithm performance is determined both by computational complexity
and the quality of the solution (i.e. the percentage deviation from the optimal). We
nd that the running time can be reduced by a factor of 4.5 to ensure a 2% deviation
from the optimal, as compared to the basic Simulated Annealing algorithm on the full
search space. More importantly, we are able to reduce the complexity of nding the
optimal from O(n:n!) for a complete search to O(nNS) for Simulated Annealing to
O(n(NMr +NS)+m) for the input variables n jobs, NS SA iterations, NM Metropolis-
Hastings iterations, r inner samples and m sections.MT 201
Multicriteria hybrid flow shop scheduling problem: literature review, analysis, and future research
This research focuses on the Hybrid Flow Shop production scheduling problem, which is one of the most difficult problems to solve. The literature points to several studies that focus the Hybrid Flow Shop scheduling problem with monocriteria functions. Despite of the fact that, many real world problems involve several objective functions, they can often compete and conflict, leading researchers to concentrate direct their efforts on the development of methods that take consider this variant into consideration. The goal of the study is to review and analyze the methods in order to solve the Hybrid Flow Shop production scheduling problem with multicriteria functions in the literature. The analyses were performed using several papers that have been published over the years, also the parallel machines types, the approach used to develop solution methods, the type of method develop, the objective function, the performance criterion adopted, and the additional constraints considered. The results of the reviewing and analysis of 46 papers showed opportunities for future researchon this topic, including the following: (i) use uniform and dedicated parallel machines, (ii) use exact and metaheuristics approaches, (iv) develop lower and uppers bounds, relations of dominance and different search strategiesto improve the computational time of the exact methods, (v) develop other types of metaheuristic, (vi) work with anticipatory setups, and (vii) add constraints faced by the production systems itself
- …