239 research outputs found

    Exploiting Music and Dance Notation to Improve Visualization of Data in BIM

    Get PDF
    Suboptimal information sharing is a key a factor that negatively impacts the construction sector’s massive productivity gap when compared to other sectors of the economy. This is due to management difficulties, supply chain issues and rework. Building Information Modeling has been shown to improve dissemination of information but has not yet been exploited to its full potential. In this paper, we propose a new notation for visualizing project information in a BIM context. It is inspired by music and dance notation, and is designed to overcome current limitations that may cause the technology’s limited use during the construction phase. A proof of concept was implemented and tested in an experiment with stakeholders. The use of the proposed BIM notations appeared to make access to and interpretation of available data more effective and resulted in more correct responses

    Integration of Cost andWork Breakdown Structures in the Management of Construction Projects

    Get PDF
    Scope management allows project managers to react when a project underperforms regarding schedule, budget, and/or quality at the execution stage. Scope management can also minimize project changes and budget omissions, as well as improve the accuracy of project cost estimates and risk responses. For scope management to be effective, though, it needs to rely on a robust work breakdown structure (WBS). A robust WBS hierarchically and faithfully reflects all project tasks and work packages so that projects are easier to manage. If done properly, the WBS also allows meeting the project objectives while delivering the project on time, on budget, and with the required quality. This paper analyzes whether the integration of a cost breakdown structure (CBS) can lead to the generation of more robust WBSs in construction projects. Over the last years, some international organizations have standardized and harmonized different cost classification systems (e.g., ISO 12006-2, ISO 81346-12, OmniClass, CoClass, UniClass). These cost databases have also been introduced into building information modeling (BIM) frameworks. We hypothesize that in BIM environments, if these CBSs are used to generate the project WBS, several advantages are gained such as sharper project definition. This enhanced project definition reduces project contradictions at both planning and execution stages, anticipates potential schedule and budget deviations, improves resource allocation, and overall it allows a better response to potential project risks. The hypothesis that the use of CBSs can generate more robust WBSs is tested by the response analysis of a questionnaire survey distributed among construction practitioners and project managers. By means of structural equation modeling (SEM), the correlation (agreement) and perception differences between two 250-respondent subsamples (technical project staff vs. project management staff) are also discussed. Results of this research support the use of CBSs by construction professionals as a basis to generate WBSs for enhanced project management (PM)

    Conflicts of interest for members of the US 2020 dietary guidelines advisory committee.

    Get PDF
    Objectives To measure incidence of conflicts of interest (COI) with food and pharmaceutical industry actors on the advisory committee for the 2020-2025 US Dietary Guidelines for Americans (DGA) and assess the adequacy of current mechanisms to disclose and manage COI among the committee's members. Design We compiled longitudinal data from archival sources on connections between members of the DGA's advisory committee and actors. We hypothesised that these committee members, who oversee the science for the most influential dietary policy in the USA, might have significant COI that would be relevant to their decision making. Disclosure of COI on this committee was recommended in 2017 by the National Academies of Sciences in order to increase transparency and manage bias, but public disclosure of the committee's COI does not appear to have taken place. Setting The committee was composed of twenty experts. Participants None. Results Our analysis found that 95 % of the committee members had COI with the food and/or pharmaceutical industries and that particular actors, including Kellogg, Abbott, Kraft, Mead Johnson, General Mills, Dannon and the International Life Sciences, had connections with multiple members. Research funding and membership of an advisory/executive board jointly accounted for more than 60 % of the total number of COI documented. Conclusions Trustworthy dietary guidelines result from a transparent, objective and science-based, process. Our analysis has shown that the significant and widespread COI on the committee prevent the DGA from achieving the recommended standard for transparency without mechanisms in place to make this information publicly available

    The advantages of information management through building information modelling

    Get PDF
    This article was published in the journal, Construction Management [© Taylor & Francis] and the definitive version is available at: http://dx.doi.org/10.1080/01446193.2013.777754As building information modelling (BIM) is positioned by governments and construction professionals as a solution to the problems in the construction industry, research is needed into the benefits BIM actually confers. The focus here is on the effectiveness of BIM as a medium for communicating information within a construction team. A case study of an offsite precast concrete fabrication facility was conducted. At the time of the study, the facility was supplying precast units for four public sector projects, and using four information management systems: e-mail, a construction project extranet tool, an Enterprise Resource Planning system and a new BIM-based system. The flow of information through the four media was measured and visualized as the projects progressed. This quantitative measurement of information flow was combined with qualitative data from interviews with facility staff. It was found that the introduction of the BIM-based system diverted information flow through the building model and away from the extranet system. The use of e-mail was largely unaffected. BIM allowed considerably more accurate, on-time and appropriate exchange of information. It is concluded it is possible to quantify some of the benefits of BIM to information management. This research paves the way for future research into the management of more construction project information linked more closely to building models

    digital 3d control room for healthcare

    Get PDF
    The building process is in an evolutionary phase dictated by the constructive innovations and the digital revolution that has involved the tools and the technical and design contents of the entire life cycle of buildings. In this context, the operators of the sector need to develop organizational models capable of protecting and managing the conceptual and scale transition, between the conceptual framework of the architecture and the subsequent ones of construction, use and management. In the development of complex projects the elaboration of the organizational model is in fact fundamental to reach adequate figurative, performance and qualitative levels by incorporating the necessary contents of environmental, economic and management sustainability of buildings. This text illustrates the development of a horizontal organizational model for the smart and dynamic control of complex buildings through the creation of an innovative digital Web-Based platform capable of integrating Building Information Modeling (BIM) technology with a "Facility Management platform". The project involves experimentation applied to a real case involving the restructuring of a complex building

    The Association of Left Ventricular Hypertrophy with Metabolic Syndrome is Dependent on Body Mass Index in Hypertensive Overweight or Obese Patients

    Get PDF
    Overweight (Ow) and obesity (Ob) influence blood pressure (BP) and left ventricular hypertrophy (LVH). It is unclear whether the presence of metabolic syndrome (MetS) independently affects echocardiographic parameters in hypertension.380 Ow/Ob essential hypertensive patients (age ≤ 65 years) presenting for referred BP control-related problems. MetS was defined according to NCEP III/ATP with AHA modifications and LVH as LVM/h(2.7) ≥ 49.2 g/m(2.7) in males and ≥ 46.7 g/m(2.7) in females. Treatment intensity score (TIS) was used to control for BP treatment as previously reported.Hypertensive patients with MetS had significantly higher BMI, systolic and mean BP, interventricular septum and relative wall thickness and lower ejection fraction than those without MetS. LVM/h(2.7) was significantly higher in MetS patients (59.14 ± 14.97 vs. 55.33 ± 14.69 g/m(2.7); p = 0.022). Hypertensive patients with MetS had a 2.3-fold higher risk to have LVH/h(2.7) after adjustment for age, SBP and TIS (OR 2.34; 95%CI 1.40-3.92; p = 0.001), but MetS lost its independent relationship with LVH when BMI was included in the model.In Ow/Ob hypertensive patients MetS maintains its role of risk factor for LVH independently of age, SBP, and TIS, resulting in a useful predictor of target organ damage in clinical practice. However, MetS loses its independent relationship when BMI is taken into account, suggesting that the effects on MetS on LV parameters are mainly driven by the degree of adiposity