    Efficiency of the solution representations for the hybrid flow shop scheduling problem with makespan objective

    Get PDF
    In this paper we address the classical hybrid flow shop scheduling problem with makespan objective. As this problem is known to be NP-hard and a very common layout in real-life manufacturing scenarios, many studies have been proposed in the literature to solve it. These contributions use different solution representations of the feasible schedules, each one with its own advantages and disadvantages. Some of them do not guarantee that all feasible semiactive schedules are represented in the space of solutions –thus limiting in principle their effectiveness– but, on the other hand, these simpler solution representations possess clear advantages in terms of having consistent neighbourhoods with well-defined neighbourhood moves. Therefore, there is a trade-off between the solution space reduction and the ability to conduct an efficient search in this reduced solution space. This trade-off is determined by two aspects, i.e. the extent of the solution space reduction, and the quality of the schedules left aside by this solution space reduction. In this paper, we analyse the efficiency of the different solution representations employed in the literature for the problem. More specifically, we first establish the size of the space of semiactive schedules achieved by the different solution representations and, secondly, we address the issue of the quality of the schedules that can be achieved by these representations using the optimal solutions given by several MILP models and complete enumeration. The results obtained may contribute to design more efficient algorithms for the hybrid flow shop scheduling problem.Ministerio de Ciencia e Innovación DPI2016-80750-

    Permutation Flowshop Scheduling with Earliness and Tardiness Penalties

    Get PDF
    We address the permutation flowshop scheduling problem with earliness and tardiness penalties (E/T) and common due date of jobs. Large number of process and discrete parts industries follow flowshop type of production process. There are very few results reported for multi-machine E/T scheduling problems. We show that the problem can be sub-divided into three groups- one, where the due date is such that all jobs are necessarily tardy; the second, where the due date is such that it is not tight enough to act as a constraint on scheduling decision; and the third is a group of problems where the due date is in between the above two. We develop analytical results and heuristics for problems arising in each of these three classes. Computational results of the heuristics are reported. Most of the problems in this research are addressed for the first time in the literature. For problems with existing heuristics, the heuristic solution is found to perform better than the existing results.

    Problem specific heuristics for group scheduling problems in cellular manufacturing

    Get PDF
    The group scheduling problem commonly arises in cellular manufacturing systems, where parts are grouped into part families. It is characterized by a sequencing task on two levels: on the one hand, a sequence of jobs within each part family has to be identified while, on the other hand, a family sequence has to be determined. In order to solve this NP-hard problem usually heuristic solution approaches are used. In this thesis different aspects of group scheduling are discussed and problem specific heuristics are developed to solve group scheduling problems efficiently. Thereby, particularly characteristic properties of flowshop group scheduling problems, such as the structure of a group schedule or missing operations, are identified and exploited. In a simulation study for job shop manufacturing cells several novel dispatching rules are analyzed. Furthermore, a comprehensive review of the existing group scheduling literature is presented, identifying fruitful directions for future research

    Efficient heuristics for the parallel blocking flow shop scheduling problem

    Get PDF
    We consider the NP-hard problem of scheduling n jobs in F identical parallel flow shops, each consisting of a series of m machines, and doing so with a blocking constraint. The applied criterion is to minimize the makespan, i.e., the maximum completion time of all the jobs in F flow shops (lines). The Parallel Flow Shop Scheduling Problem (PFSP) is conceptually similar to another problem known in the literature as the Distributed Permutation Flow Shop Scheduling Problem (DPFSP), which allows modeling the scheduling process in companies with more than one factory, each factory with a flow shop configuration. Therefore, the proposed methods can solve the scheduling problem under the blocking constraint in both situations, which, to the best of our knowledge, has not been studied previously. In this paper, we propose a mathematical model along with some constructive and improvement heuristics to solve the parallel blocking flow shop problem (PBFSP) and thus minimize the maximum completion time among lines. The proposed constructive procedures use two approaches that are totally different from those proposed in the literature. These methods are used as initial solution procedures of an iterated local search (ILS) and an iterated greedy algorithm (IGA), both of which are combined with a variable neighborhood search (VNS). The proposed constructive procedure and the improved methods take into account the characteristics of the problem. The computational evaluation demonstrates that both of them –especially the IGA– perform considerably better than those algorithms adapted from the DPFSP literature.Peer ReviewedPostprint (author's final draft

    An effective iterated greedy algorithm for the mixed no-idle flowshop scheduling problem

    Full text link
    In the no-idle flowshop, machines cannot be idle after finishing one job and before starting the next one. Therefore, start times of jobs must be delayed to guarantee this constraint. In practice machines show this behavior as it might be technically unfeasible or uneconomical to stop a machine in between jobs. This has important ramifications in the modern industry including fiber glass processing, foundries, production of integrated circuits and the steel making industry, among others. However, to assume that all machines in the shop have this no-idle constraint is not realistic. To the best of our knowledge, this is the first paper to study the mixed no-idle extension where only some machines have the no-idle constraint. We present a mixed integer programming model for this new problem and the equations to calculate the makespan. We also propose a set of formulas to accelerate the calculation of insertions that is used both in heuristics as well as in the local search procedures. An effective iterated greedy (IG) algorithm is proposed. We use an NEH-based heuristic to construct a high quality initial solution. A local search using the proposed accelerations is employed to emphasize intensification and exploration in the IG. A new destruction and construction procedure is also shown. To evaluate the proposed algorithm, we present several adaptations of other well-known and recent metaheuristics for the problem and conduct a comprehensive set of computational and statistical experiments with a total of 1750 instances. The results show that the proposed IG algorithm outperforms existing methods in the no-idle and in the mixed no-idle scenarios by a significant margin.Quan-Ke Pan is partially supported by the National Science Foundation of China 61174187, Program for New Century Excellent Talents in University (NCET-13-0106), Science Foundation of Liaoning Province in China (2013020016), Basic scientific research foundation of Northeast University under Grant N110208001, Starting foundation of Northeast University under Grant 29321006, and Shandong Province Key Laboratory of Intelligent Information Processing and Network Security (Liaocheng University). Ruben Ruiz is partially supported by the Spanish Ministry of Economy and Competitiveness, under the project "RESULT - Realistic Extended Scheduling Using Light Techniques" with reference DPI2012-36243-C02-01 co-financed by the European Union and FEDER funds and by the Universitat Politecnica de Valencia, for the project MRPIV with reference PAID/2012/202.Pan, Q.; Ruiz García, R. (2014). An effective iterated greedy algorithm for the mixed no-idle flowshop scheduling problem. Omega. 44:41-50. https://doi.org/10.1016/j.omega.2013.10.002S41504

    A comprehensive review and evaluation of permutation flowshop heuristics to minimize flowtime

    Full text link
    [EN] In recent years, a large number of heuristics have been proposed for the minimization of the total or mean flowtime/completion time of the well-known permutation flowshop scheduling problem. Although some literature reviews and comparisons have been made, they do not include the latest available heuristics and results are hard to compare as no common benchmarks and computing platforms have been employed. Furthermore, existing partial comparisons lack the application of powerful statistical tools. The result is that it is not clear which heuristics, especially among the recent ones, are the best. This paper presents a comprehensive review and computational evaluation as well as a statistical assessment of 22 existing heuristics. From the knowledge obtained after such a detailed comparison, five new heuristics are presented. Careful designs of experiments and analyses of variance (ANOVA) techniques are applied to guarantee sound conclusions. The comparison results identify the best existing methods and show that the five newly presented heuristics are competitive or better than the best performing ones in the literature for the permutation flowshop problem with the total completion time criterionThis research is partially supported by National Science Foundation of China (60874075, 61174187), and Science Foundation of Shandong Province, China (BS2010DX005), and Postdoctoral Science Foundation of China (20100480897). Ruben Ruiz is partially funded by the Spanish Ministry of Science and Innovation, under the project "SMPA-Advanced Parallel Multiobjective Sequencing: Practical and Theorerical Advances" with reference DPI2008-03511/DPI and by the Small and Medium Industry of the Generalitat Valenciana (IMPIVA) and by the European Union through the European Regional Development Fund (FEDER) inside the R+D program "Ayudas dirigidas a Institutos Tecnologicos de la Red IMPIVA" during the year 2011, with project number IMDEEA/2011/142.Pan, Q.; Ruiz García, R. (2013). A comprehensive review and evaluation of permutation flowshop heuristics to minimize flowtime. Computers and Operations Research. 40(1):117-128. https://doi.org/10.1016/j.cor.2012.05.018S11712840

    Multi-objective sequence dependent setup times permutation flowshop: A new algorithm and a comprehensive study

    Full text link
    The permutation flowshop scheduling problem has been thoroughly studied in recent decades, both from single objective as well as from multi-objective perspectives. To the best of our knowledge, little has been done regarding the multi-objective flowshop with Pareto approach when sequence dependent setup times are considered. As setup times and multi-criteria problems are important in industry, we must focus on this area. We propose a simple, yet powerful algorithm for the sequence dependent setup times flowshop problem with several criteria. The presented method is referred to as Restarted Iterated Pareto Greedy or RIPG and is compared against the best performing approaches from the relevant literature. Comprehensive computational and statistical analyses are carried out in order to demonstrate that the proposed RIPG method clearly outperforms all other algorithms and, as a consequence, it is a state-of- art method for this important and practical scheduling problemThe authors thank the anonymous referees for their careful and detailed comments which have helped improve this manuscript considerably. This work is partially financed by the Spanish Ministry of Science and Innovation, under the projects "SMPA-Advanced Parallel Multiobjective Sequencing: Practical and Theorerical Advances" with reference DPI2008-03511/DPI and "RESULT-Realistic Extended Scheduling Using Light Techniques" with reference DPI2012-36243-C02-01 and by the Small and Medium Industry of the Generalitat Valenciana (IMPIVA) and by the European Union through the European Regional Development Fund (FEDER) inside the R+D program "Ayudas dirigidas a Institutos Tecnologicos de la Red IMPIVA" during the year 2011, with project numbers IMDEEA/2011/142 and IMDEEA/2012/143.Ciavotta, M.; Minella, GG.; Ruiz García, R. (2013). Multi-objective sequence dependent setup times permutation flowshop: A new algorithm and a comprehensive study. European Journal of Operational Research. 227(2):301-313. https://doi.org/10.1016/j.ejor.2012.12.031S301313227

    The distributed assembly permutation flowshop scheduling problem

    Full text link
    Nowadays, improving the management of complex supply chains is a key to become competitive in the twenty-first century global market. Supply chains are composed of multi-plant facilities that must be coordinated and synchronised to cut waste and lead times. This paper proposes a Distributed Assembly Permutation Flowshop Scheduling Problem (DAPFSP) with two stages to model and study complex supply chains. This problem is a generalisation of the Distributed Permutation Flowshop Scheduling Problem (DPFSP). The first stage of the DAPFSP is composed of f identical production factories. Each one is a flowshop that produces jobs to be assembled into final products in a second assembly stage. The objective is to minimise the makespan. We present first a Mixed Integer Linear Programming model (MILP). Three constructive algorithms are proposed. Finally, a Variable Neighbourhood Descent (VND) algorithm has been designed and tested by a comprehensive ANOVA statistical analysis. The results show that the VND algorithm offers good performance to solve this scheduling problem.Ruben Ruiz is partially supported by the Spanish Ministry of Science and Innovation, under the project 'RESULT - Realistic Extended Scheduling Using Light Techniques' with reference DPI2012-36243-C02-01. Carlos Andres-Romano is partially supported by the Spanish Ministry of Science and Innovation, under the project 'INSAMBLE' - Scheduling at assembly/disassembly synchronised supply chains with reference DPI2011-27633.Hatami, S.; Ruiz García, R.; Andrés Romano, C. (2013). The distributed assembly permutation flowshop scheduling problem. International Journal of Production Research. 51(17):5292-5308. https://doi.org/10.1080/00207543.2013.807955S529253085117Basso, D., Chiarandini, M., & Salmaso, L. (2007). Synchronized permutation tests in replicated designs. Journal of Statistical Planning and Inference, 137(8), 2564-2578. doi:10.1016/j.jspi.2006.04.016Biggs, D., De Ville, B., & Suen, E. (1991). A method of choosing multiway partitions for classification and decision trees. Journal of Applied Statistics, 18(1), 49-62. doi:10.1080/02664769100000005Chan, F. T. S., Chung, S. H., Chan, L. Y., Finke, G., & Tiwari, M. K. (2006). Solving distributed FMS scheduling problems subject to maintenance: Genetic algorithms approach. Robotics and Computer-Integrated Manufacturing, 22(5-6), 493-504. doi:10.1016/j.rcim.2005.11.005Chan, F. T. S., Chung, S. H., & Chan, P. L. Y. (2006). Application of genetic algorithms with dominant genes in a distributed scheduling problem in flexible manufacturing systems. International Journal of Production Research, 44(3), 523-543. doi:10.1080/00207540500319229Liao, C.-J., & Liao, L.-M. (2008). Improved MILP models for two-machine flowshop with batch processing machines. Mathematical and Computer Modelling, 48(7-8), 1254-1264. doi:10.1016/j.mcm.2008.01.001Framinan, J. M., & Leisten, R. (2003). An efficient constructive heuristic for flowtime minimisation in permutation flow shops. Omega, 31(4), 311-317. doi:10.1016/s0305-0483(03)00047-1Gao, J., & Chen, R. (2011). A hybrid genetic algorithm for the distributed permutation flowshop scheduling problem. International Journal of Computational Intelligence Systems, 4(4), 497-508. doi:10.1080/18756891.2011.9727808Hansen, P., & Mladenović, N. (2001). Variable neighborhood search: Principles and applications. European Journal of Operational Research, 130(3), 449-467. doi:10.1016/s0377-2217(00)00100-4Hariri, A. M. A., & Potts, C. N. (1997). A branch and bound algorithm for the two-stage assembly scheduling problem. European Journal of Operational Research, 103(3), 547-556. doi:10.1016/s0377-2217(96)00312-8Jia, H. Z., Fuh, J. Y. H., Nee, A. Y. C., & Zhang, Y. F. (2002). Web-based Multi-functional Scheduling System for a Distributed Manufacturing Environment. Concurrent Engineering, 10(1), 27-39. doi:10.1177/1063293x02010001054Jia, H. Z., Nee, A. Y. C., Fuh, J. Y. H., & Zhang, Y. F. (2003). Journal of Intelligent Manufacturing, 14(3/4), 351-362. doi:10.1023/a:1024653810491Jia, H. Z., Fuh, J. Y. H., Nee, A. Y. C., & Zhang, Y. F. (2007). Integration of genetic algorithm and Gantt chart for job shop scheduling in distributed manufacturing systems. Computers & Industrial Engineering, 53(2), 313-320. doi:10.1016/j.cie.2007.06.024Kass, G. V. (1980). An Exploratory Technique for Investigating Large Quantities of Categorical Data. Applied Statistics, 29(2), 119. doi:10.2307/2986296Lee, C.-Y., Cheng, T. C. E., & Lin, B. M. T. (1993). Minimizing the Makespan in the 3-Machine Assembly-Type Flowshop Scheduling Problem. Management Science, 39(5), 616-625. doi:10.1287/mnsc.39.5.616Morgan, J. N., & Sonquist, J. A. (1963). Problems in the Analysis of Survey Data, and a Proposal. Journal of the American Statistical Association, 58(302), 415-434. doi:10.1080/01621459.1963.10500855Pan, Q.-K., & Ruiz, R. (2012). Local search methods for the flowshop scheduling problem with flowtime minimization. European Journal of Operational Research, 222(1), 31-43. doi:10.1016/j.ejor.2012.04.034Potts, C. N., Sevast’janov, S. V., Strusevich, V. A., Van Wassenhove, L. N., & Zwaneveld, C. M. (1995). The Two-Stage Assembly Scheduling Problem: Complexity and Approximation. Operations Research, 43(2), 346-355. doi:10.1287/opre.43.2.346Ruiz, R., & Stützle, T. (2007). A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem. European Journal of Operational Research, 177(3), 2033-2049. doi:10.1016/j.ejor.2005.12.009Ruiz, R., Şerifoğlu, F. S., & Urlings, T. (2008). Modeling realistic hybrid flexible flowshop scheduling problems. Computers & Operations Research, 35(4), 1151-1175. doi:10.1016/j.cor.2006.07.014Ruiz, R., & Andrés-Romano, C. (2011). Scheduling unrelated parallel machines with resource-assignable sequence-dependent setup times. The International Journal of Advanced Manufacturing Technology, 57(5-8), 777-794. doi:10.1007/s00170-011-3318-2Stafford, E. F., Tseng, F. T., & Gupta, J. N. D. (2005). Comparative evaluation of MILP flowshop models. Journal of the Operational Research Society, 56(1), 88-101. doi:10.1057/palgrave.jors.2601805Tozkapan, A., Kırca, Ö., & Chung, C.-S. (2003). A branch and bound algorithm to minimize the total weighted flowtime for the two-stage assembly scheduling problem. Computers & Operations Research, 30(2), 309-320. doi:10.1016/s0305-0548(01)00098-3Tseng, F. T., & Stafford, E. F. (2008). New MILP models for the permutation flowshop problem. Journal of the Operational Research Society, 59(10), 1373-1386. doi:10.1057/palgrave.jors.260245

    The Distributed and Assembly Scheduling Problem

    Full text link
    Tesis por compendio[EN] Nowadays, manufacturing systems meet different new global challenges and the existence of a collaborative manufacturing environment is essential to face with. Distributed manufacturing and assembly systems are two manufacturing systems which allow industries to deal with some of these challenges. This thesis studies a production problem in which both distributed manufacturing and assembly systems are considered. Although distributed manufacturing systems and assembly systems are well-known problems and have been extensively studied in the literature, to the best of our knowledge, considering these two systems together as in this thesis is the first effort in the literature. Due to the importance of scheduling optimization on production performance, some different ways to optimize the scheduling of the considered problem are discussed in this thesis. The studied scheduling setting consists of two stages: A production and an assembly stage. Various production centers make the first stage. Each of these centers consists of several machines which are dedicated to manufacture jobs. A single assembly machine is considered for the second stage. The produced jobs are assembled on the assembly machine to form final products through a defined assembly program. In this thesis, two different problems regarding two different production configurations for the production centers of the first stage are considered. The first configuration is a flowshop that results in what we refer to as the Distributed Assembly Permutation Flowshop Scheduling Problem (DAPFSP). The second problem is referred to as the Distributed Parallel Machine and Assembly Scheduling Problem (DPMASP), where unrelated parallel machines configure the production centers. Makespan minimization of the product on the assembly machine located in the assembly stage is considered as the objective function for all considered problems. In this thesis some extensions are considered for the studied problems so as to bring them as close as possible to the reality of production shops. In the DAPFSP, sequence dependent setup times are added for machines in both production and assembly stages. Similarly, in the DPMASP, due to technological constraints, some defined jobs can be processed only in certain factories. Mathematical models are presented as an exact solution for some of the presented problems and two state-of-art solvers, CPLEX and GUROBI are used to solve them. Since these solvers are not able to solve large sized problems, we design and develop heuristic methods to solve the problems. In addition to heuristics, some metaheuristics are also designed and proposed to improve the solutions obtained by heuristics. Finally, for each proposed problem, the performance of the proposed solution methods is compared through extensive computational and comprehensive ANOVA statistical analysis.[ES] Los sistemas de producción se enfrentan a retos globales en los que el concepto de fabricación colaborativa es crucial para poder tener éxito en el entorno cambiante y complejo en el que nos encontramos. Una característica de los sistemas productivos que puede ayudar a lograr este objetivo consiste en disponer de una red de fabricación distribuida en la que los productos se fabriquen en localizaciones diferentes y se vayan ensamblando para obtener el producto final. En estos casos, disponer de modelos y herramientas para mejorar el rendimiento de sistemas de producción distribuidos con ensamblajes es una manera de asegurar la eficiencia de los mismos. En esta tesis doctoral se estudian los sistemas de fabricación distribuidos con operaciones de ensamblaje. Los sistemas distribuidos y los sistemas con operaciones de ensamblaje han sido estudiados por separado en la literatura. De hecho, no se han encontrado estudios de sistemas con ambas características consideradas de forma conjunta. Dada la complejidad de considerar conjuntamente ambos tipos de sistemas a la hora de realizar la programación de la producción en los mismos, se ha abordado su estudio considerando un modelo bietápico en la que en la primera etapa se consideran las operaciones de producción y en la segunda se plantean las operaciones de ensamblaje. Dependiendo de la configuración de la primera etapa se han estudiado dos variantes. En la primera variante se asume que la etapa de producción está compuesta por sendos sistemas tipo flowshop en los que se fabrican los componentes que se ensamblan en la segunda etapa (Distributed Assembly Permutation Flowshop Scheduling Problem o DAPFSP). En la segunda variante se considera un sistema de máquinas en paralelo no relacionadas (Distributed Parallel Machine and Assembly Scheduling Problem o DPMASP). En ambas variantes se optimiza la fecha de finalización del último trabajo secuenciado (Cmax) y se contempla la posibilidad que existan tiempos de cambio (setup) dependientes de la secuencia de trabajos fabricada. También, en el caso DPMASP se estudia la posibilidad de prohibir o no el uso de determinadas máquinas de la etapa de producción. Se han desarrollado modelos matemáticos para resolver algunas de las variantes anteriores. Estos modelos se han resuelto mediante los programas CPLEX y GUROBI en aquellos casos que ha sido posible. Para las instancias en los que el modelo matemático no ofrecía una solución al problema se han desarrollado heurísticas y metaheurísticas para ello. Todos los procedimientos anteriores han sido estudiados para determinar el rendimiento de los diferentes algoritmos planteados. Para ello se ha realizado un exhaustivo estudio computacional en el que se han aplicado técnicas ANOVA. Los resultados obtenidos en la tesis permiten avanzar en la comprensión del comportamiento de los sistemas productivos distribuidos con ensamblajes, definiendo algoritmos que permiten obtener buenas soluciones a este tipo de problemas tan complejos que aparecen tantas veces en la realidad industrial.[CA] Els sistemes de producció s'enfronten a reptes globals en què el concepte de fabricació col.laborativa és crucial per a poder tindre èxit en l'entorn canviant i complex en què ens trobem. Una característica dels sistemes productius que pot ajudar a aconseguir este objectiu consistix a disposar d'una xarxa de fabricació distribuïda en la que els productes es fabriquen en localitzacions diferents i es vagen acoblant per a obtindre el producte final. En estos casos, disposar de models i ferramentes per a millorar el rendiment de sistemes de producció distribuïts amb acoblaments és una manera d'assegurar l'eficiència dels mateixos. En esta tesi doctoral s'estudien els sistemes de fabricació distribuïts amb operacions d'acoblament. Els sistemes distribuïts i els sistemes amb operacions d'acoblament han sigut estudiats per separat en la literatura però, en allò que es coneix, no s'han trobat estudis de sistemes amb ambdós característiques conjuntament. Donada la complexitat de considerar conjuntament ambdós tipus de sistemes a l'hora de realitzar la programació de la producció en els mateixos, s'ha abordat el seu estudi considerant un model bietàpic en la que en la primera etapa es consideren les operacions de producció i en la segona es plantegen les operacions d'acoblament. Depenent de la configuració de la primera etapa s'han estudiat dos variants. En la primera variant s'assumix que l'etapa de producció està composta per sengles sistemes tipus flowshop en els que es fabriquen els components que s'acoblen en la segona etapa (Distributed Assembly Permutation Flowshop Scheduling Problem o DAPFSP). En la segona variant es considera un sistema de màquines en paral.lel no relacionades (Distributed Parallel Machine and Assembly Scheduling Problem o DPMASP). En ambdós variants s'optimitza la data de finalització de l'últim treball seqüenciat (Cmax) i es contempla la possibilitat que existisquen temps de canvi (setup) dependents de la seqüència de treballs fabricada. També, en el cas DPMASP s'estudia la possibilitat de prohibir o no l'ús de determinades màquines de l'etapa de producció. S'han desenvolupat models matemàtics per a resoldre algunes de les variants anteriors. Estos models s'han resolt per mitjà dels programes CPLEX i GUROBI en aquells casos que ha sigut possible. Per a les instàncies en què el model matemàtic no oferia una solució al problema s'han desenrotllat heurístiques i metaheurísticas per a això. Tots els procediments anteriors han sigut estudiats per a determinar el rendiment dels diferents algoritmes plantejats. Per a això s'ha realitzat un exhaustiu estudi computacional en què s'han aplicat tècniques ANOVA. Els resultats obtinguts en la tesi permeten avançar en la comprensió del comportament dels sistemes productius distribuïts amb acoblaments, definint algoritmes que permeten obtindre bones solucions a este tipus de problemes tan complexos que apareixen tantes vegades en la realitat industrial.Hatami, S. (2016). The Distributed and Assembly Scheduling Problem [Tesis doctoral no publicada]. Universitat Politècnica de València. https://doi.org/10.4995/Thesis/10251/64072TESISCompendi