122 research outputs found

    The Rydberg-Atom-Cavity Axion Search

    Get PDF
    We report on the present progress in development of the dark matter axion search experiment with Rydberg-atom-cavity detectors in Kyoto, CARRACK I and CARRACK II. The axion search has been performed with CARRACK I in the 8 % mass range around 10μeV 10 \mu {\rm eV} , and CARRACK II is now ready for the search in the wide range 2μeV50μeV 2 \mu {\rm eV} - 50 \mu {\rm eV} . We have also developed quantum theoretical calculations on the axion-photon-atom system in the resonant cavity in order to estimate precisely the detection sensitivity for the axion signal. Some essential features on the axion-photon-atom interaction are clarified, which provide the optimum experimental setup for the axion search.Comment: 8 pages, 2 figures, Invited talk presented at the Dark2000, Heidelberg, Germany,10-15 July, 200

    Ka-band linearizer structure studies for a compact light source

    Get PDF
    The CompactLight design for a next-generation x-ray free-electron laser utilizes a C-band injector. This requires that the harmonic system used to linearize the beam's phase space must operate at X-band rf or higher. We investigate the optimum frequency for the harmonic system in the range of frequencies from 12 to 48 GHz. We describe the reasoning behind selecting 36 GHz (Ka-band) as our working harmonic frequency. The full linearizer system design including the power source, pulse compressor, and linearizing structure, along with options, is considered and presented. These designs are compared in terms of rf and beam dynamics performance. Two potential MW-level rf sources are discussed; a multibeam klystron and a gyro-klystron, while a klystron-based upconverter with an X-band driver is briefly discussed as an alternative path if even higher peak powers are needed. To further increase peak power, novel options for pulse compressors at Ka-band are discussed. Traveling and standing wave solutions for the structure are presented

    Development of 36 GHz RF systems for RF linearisers

    Get PDF
    As part of the deign studies, the CompactLight project plans to use an injector in the C-band. Which constitutes a particular complication for the harmonic system in charge of linearising the beam’s phase space, since it means its operation frequency could be higher than the standard X-band RF technologies. In the present work, we investigated a 36 GHz (Ka-band) as the ideal frequency for the harmonic system. A set of structure designs are presented as candidates for the lineariser, based on different powering schemes and pulse compressor technologies. The comparison is made both in terms of beam dynamics and RF performance. Given the phase stability requirements for the MW class RF sources needed for this system, we performed careful studies of a Gyro-Klystron and a multi-beam klystron as potential RF sources, with both showing up to 3 MW available power using moderate modulator voltages. Alternatives for pulse compression at Ka-band are also discussed in this work

    Status of the compactlight design study*

    Get PDF
    CompactLight (XLS) is an International Collaboration of 24 partners and 5 third parties, funded by the European Union through the Horizon 2020 Research and Innovation Programme. The main goal of the project, which started in January 2018 with a duration of 36 months, is the design of an hard X-ray FEL facility beyond today’s state of the art, using the latest concepts for bright electron photo-injectors, high-gradient accelerating structures, and innovative short-period undulators. The specifications of the facility and the parameters of the future FEL are driven by the demands of potential users and the associated science cases. In this paper we will give an overview on the ongoing activities and the major results achieved until now

    The Compact Linear Collider (CLIC) - 2018 Summary Report

    Get PDF

    The Compact Linear Collider (CLIC) - 2018 Summary Report

    Get PDF
    The Compact Linear Collider (CLIC) is a TeV-scale high-luminosity linear e+ee^+e^- collider under development at CERN. Following the CLIC conceptual design published in 2012, this report provides an overview of the CLIC project, its current status, and future developments. It presents the CLIC physics potential and reports on design, technology, and implementation aspects of the accelerator and the detector. CLIC is foreseen to be built and operated in stages, at centre-of-mass energies of 380 GeV, 1.5 TeV and 3 TeV, respectively. CLIC uses a two-beam acceleration scheme, in which 12 GHz accelerating structures are powered via a high-current drive beam. For the first stage, an alternative with X-band klystron powering is also considered. CLIC accelerator optimisation, technical developments and system tests have resulted in an increased energy efficiency (power around 170 MW) for the 380 GeV stage, together with a reduced cost estimate at the level of 6 billion CHF. The detector concept has been refined using improved software tools. Significant progress has been made on detector technology developments for the tracking and calorimetry systems. A wide range of CLIC physics studies has been conducted, both through full detector simulations and parametric studies, together providing a broad overview of the CLIC physics potential. Each of the three energy stages adds cornerstones of the full CLIC physics programme, such as Higgs width and couplings, top-quark properties, Higgs self-coupling, direct searches, and many precision electroweak measurements. The interpretation of the combined results gives crucial and accurate insight into new physics, largely complementary to LHC and HL-LHC. The construction of the first CLIC energy stage could start by 2026. First beams would be available by 2035, marking the beginning of a broad CLIC physics programme spanning 25-30 years

    S-Band Transverse Deflecting Structure Design for CompactLight

    No full text
    The CompactLight project is currently developing the design of a next generation hard X-ray FEL facility, which is based on high-gradient X-band (12 GHz) structures. However, to carry out pump-and-probe experiments in the project, two-bunch operation with a spacing of 10 X-band rf cycles is proposed. A sub-harmonic transverse deflecting structure working at S-band is proposed to direct the two bunches into two separate FEL lines. The two FEL pulses will have independently tunable wavelengths and can be combined in a single experiment with a temporal delay between pulses of ± 100 fs. The rf design of the transverse deflector is presented in this paper
    corecore