11 research outputs found

    β-catenin ameliorates myocardial infarction by preventing YAP-associated apoptosis

    Get PDF
    Objective: To explore whether the effect of β-catenin on MI and MI-induced cardiomyocyte apoptosis is YAP-dependent. Methods: The authors established an MI rat model by ligating the anterior descending branch of the left coronary artery, and an MI cell model by treating cardiomyocytes with H2O2. Results: β-catenin downregulation was observed in MI cardiac tissues and in H2O2-treated cardiomyocytes. Lentiviral-CTNNB1 was administered to MI rats to upregulate β-catenin expression in MI cardiac tissue. β-catenin recovery reduced the myocardial infarct area, fibrosis, and apoptotic cell death in MI rats. H2O2 treatment attenuated cell viability and induced cell death in cardiomyocytes, whereas β-catenin overexpression partially reversed these changes. Moreover, H2O2 treatment caused the deactivation of Yes-Associated Protein (YAP), as detected by increased YAP phosphorylation and reduced the nuclear localization of YAP. Upregulation of β-catenin expression reactivated YAP in H2O2-treated cardiomyocytes. Reactivation of YAP was achieved by administration of Mitochonic Acid-5 (MA-5) to H2O2-treated cardiomyocytes, and deactivation of YAP by CIL56 treatment in β-catenin-overexpressing H2O2-treated cardiomyocytes. MA-5 administration increased cell viability and repressed apoptosis in H2O2-treated cardiomyocytes, whereas CIL56 treatment counteracted the effects of β-catenin overexpression on cell survival and apoptosis. Conclusions: The present data indicate that β-catenin and YAP are effective treatment targets for MI, blocking the apoptotic death of cardiomyocytes

    Numerical simulation of cooperative breaking rock by multi-cutter and research on the layout law of disc cutter on cutterhead

    Get PDF
    The cutterhead was one of the key parts of the Tunneling Boring Machine to achieve tunnel mining. Cutterhead’s continuous breaking rock was the rock destruction process under the cutter group. The cutter of cutterhead was used as a direct tool for rock breaking, and the arrangement of the cutter would directly affect the breaking performance such as the force of cutter and energy consumption. This paper mainly explores the influence of cutter installation parameters on the rock breaking force and specific energy in the multi-cutter collaborative rock breaking mode. Firstly, the characteristics of rock breaking during the cutter excavation and the way of multi-cutter collaborative effects created by the adjacent cutter during the rotation are analyzed. Using the motion characteristics of multi-cutter around the center of the cutterhead rotation and slow penetrating into the rock on the cutterhead, a rock constitutive model including the cutter’s displacement loading method and the form suitable for simulating the damage of rock element in the excavation was established, a finite element model of three cutters rotary rock breaking for techniques such as rock failure separation criteria was introduced. This paper simulates the rock breaking process of multiple cutters spiral intrusion rocks. Then, the single-factor influence of three main cutterhead arrangement parameters, cutter spacing, cutter installation polar angle difference and cutting sequence, on the rock breaking performance indicators such as rock breaking force of cutter and specific energy is analyzed by finite element simulation calculation. Finally, an orthogonal experiment is designed to analyze the influence of the above parameters on the total force of rock breaking under the interaction of multiple factors. The results show that the cutter spacing and installation polar angle difference have the most significant influence on the rock breaking performance of the cutter under the cooperative breaking rock conditions. The cutter spacing affects the penetration of lateral cracks between adjacent cutting paths. With the increase of the tool spacing, the lateral crack penetration between adjacent cutting paths is gradually difficult, and the weaker the effect of adjacent cutter radial collaborative rock breaking. The installation polar angle difference affects the penetration of lateral cracks and inclined free surface. With the increase of the installation polar angle difference, the lateral crack connected to the inclined free surface becomes longer, and the cooperative rock breaking effect of by adjacent cutter in the circumferential direction of the cutterhead has been enhanced.This work analyzes the relationship between the arrangement of the cutter and the rock breaking performance of the cutter in the multi-cutter collaborative breaking rock condition, which provides a reference for the reasonable layout of the cutterhead cutter

    The LHCb upgrade I

    No full text
    International audienceThe LHCb upgrade represents a major change of the experiment. The detectors have been almost completely renewed to allow running at an instantaneous luminosity five times larger than that of the previous running periods. Readout of all detectors into an all-software trigger is central to the new design, facilitating the reconstruction of events at the maximum LHC interaction rate, and their selection in real time. The experiment's tracking system has been completely upgraded with a new pixel vertex detector, a silicon tracker upstream of the dipole magnet and three scintillating fibre tracking stations downstream of the magnet. The whole photon detection system of the RICH detectors has been renewed and the readout electronics of the calorimeter and muon systems have been fully overhauled. The first stage of the all-software trigger is implemented on a GPU farm. The output of the trigger provides a combination of totally reconstructed physics objects, such as tracks and vertices, ready for final analysis, and of entire events which need further offline reprocessing. This scheme required a complete revision of the computing model and rewriting of the experiment's software

    The LHCb upgrade I

    No full text
    The LHCb upgrade represents a major change of the experiment. The detectors have been almost completely renewed to allow running at an instantaneous luminosity five times larger than that of the previous running periods. Readout of all detectors into an all-software trigger is central to the new design, facilitating the reconstruction of events at the maximum LHC interaction rate, and their selection in real time. The experiment's tracking system has been completely upgraded with a new pixel vertex detector, a silicon tracker upstream of the dipole magnet and three scintillating fibre tracking stations downstream of the magnet. The whole photon detection system of the RICH detectors has been renewed and the readout electronics of the calorimeter and muon systems have been fully overhauled. The first stage of the all-software trigger is implemented on a GPU farm. The output of the trigger provides a combination of totally reconstructed physics objects, such as tracks and vertices, ready for final analysis, and of entire events which need further offline reprocessing. This scheme required a complete revision of the computing model and rewriting of the experiment's software

    The LHCb upgrade I

    No full text
    International audienceThe LHCb upgrade represents a major change of the experiment. The detectors have been almost completely renewed to allow running at an instantaneous luminosity five times larger than that of the previous running periods. Readout of all detectors into an all-software trigger is central to the new design, facilitating the reconstruction of events at the maximum LHC interaction rate, and their selection in real time. The experiment's tracking system has been completely upgraded with a new pixel vertex detector, a silicon tracker upstream of the dipole magnet and three scintillating fibre tracking stations downstream of the magnet. The whole photon detection system of the RICH detectors has been renewed and the readout electronics of the calorimeter and muon systems have been fully overhauled. The first stage of the all-software trigger is implemented on a GPU farm. The output of the trigger provides a combination of totally reconstructed physics objects, such as tracks and vertices, ready for final analysis, and of entire events which need further offline reprocessing. This scheme required a complete revision of the computing model and rewriting of the experiment's software

    The LHCb upgrade I

    No full text
    International audienceThe LHCb upgrade represents a major change of the experiment. The detectors have been almost completely renewed to allow running at an instantaneous luminosity five times larger than that of the previous running periods. Readout of all detectors into an all-software trigger is central to the new design, facilitating the reconstruction of events at the maximum LHC interaction rate, and their selection in real time. The experiment's tracking system has been completely upgraded with a new pixel vertex detector, a silicon tracker upstream of the dipole magnet and three scintillating fibre tracking stations downstream of the magnet. The whole photon detection system of the RICH detectors has been renewed and the readout electronics of the calorimeter and muon systems have been fully overhauled. The first stage of the all-software trigger is implemented on a GPU farm. The output of the trigger provides a combination of totally reconstructed physics objects, such as tracks and vertices, ready for final analysis, and of entire events which need further offline reprocessing. This scheme required a complete revision of the computing model and rewriting of the experiment's software

    The LHCb upgrade I

    No full text
    International audienceThe LHCb upgrade represents a major change of the experiment. The detectors have been almost completely renewed to allow running at an instantaneous luminosity five times larger than that of the previous running periods. Readout of all detectors into an all-software trigger is central to the new design, facilitating the reconstruction of events at the maximum LHC interaction rate, and their selection in real time. The experiment's tracking system has been completely upgraded with a new pixel vertex detector, a silicon tracker upstream of the dipole magnet and three scintillating fibre tracking stations downstream of the magnet. The whole photon detection system of the RICH detectors has been renewed and the readout electronics of the calorimeter and muon systems have been fully overhauled. The first stage of the all-software trigger is implemented on a GPU farm. The output of the trigger provides a combination of totally reconstructed physics objects, such as tracks and vertices, ready for final analysis, and of entire events which need further offline reprocessing. This scheme required a complete revision of the computing model and rewriting of the experiment's software
    corecore