28 research outputs found
A Very Intense Neutrino Super Beam Experiment for Leptonic CP Violation Discovery based on the European Spallation Source Linac: A Snowmass 2013 White Paper
Very intense neutrino beams and large neutrino detectors will be needed in
order to enable the discovery of CP violation in the leptonic sector. We
propose to use the proton linac of the European Spallation Source currently
under construction in Lund, Sweden to deliver, in parallel with the spallation
neutron production, a very intense, cost effective and high performance
neutrino beam. The baseline program for the European Spallation Source linac is
that it will be fully operational at 5 MW average power by 2022, producing 2
GeV 2.86 ms long proton pulses at a rate of 14 Hz. Our proposal is to upgrade
the linac to 10 MW average power and 28 Hz, producing 14 pulses/s for neutron
production and 14 pulses/s for neutrino production. Furthermore, because of the
high current required in the pulsed neutrino horn, the length of the pulses
used for neutrino production needs to be compressed to a few s with the
aid of an accumulator ring. A long baseline experiment using this Super Beam
and a megaton underground Water Cherenkov detector located in existing mines
300-600 km from Lund will make it possible to discover leptonic CP violation at
5 significance level in up to 50% of the leptonic Dirac CP-violating
phase range. This experiment could also determine the neutrino mass hierarchy
at a significance level of more than 3 if this issue will not already
have been settled by other experiments by then. The mass hierarchy performance
could be increased by combining the neutrino beam results with those obtained
from atmospheric neutrinos detected by the same large volume detector. This
detector will also be used to measure the proton lifetime, detect cosmological
neutrinos and neutrinos from supernova explosions. Results on the sensitivity
to leptonic CP violation and the neutrino mass hierarchy are presented.Comment: 28 page
High intensity neutrino oscillation facilities in Europe
The EUROnu project has studied three possible options for future, high intensity neutrino oscillation facilities in Europe. The first is a Super Beam, in which the neutrinos come from the decay of pions created by bombarding targets with a 4 MW proton beam from the CERN High Power Superconducting Proton Linac. The far detector for this facility is the 500 kt MEMPHYS water Cherenkov, located in the Fréjus tunnel. The second facility is the Neutrino Factory, in which the neutrinos come from the decay of μ+ and μ− beams in a storage ring. The far detector in this case is a 100 kt magnetized iron neutrino detector at a baseline of 2000 km. The third option is a Beta Beam, in which the neutrinos come from the decay of beta emitting isotopes, in particular He6 and Ne18, also stored in a ring. The far detector is also the MEMPHYS detector in the Fréjus tunnel. EUROnu has undertaken conceptual designs of these facilities and studied the performance of the detectors. Based on this, it has determined the physics reach of each facility, in particular for the measurement of CP violation in the lepton sector, and estimated the cost of construction. These have demonstrated that the best facility to build is the Neutrino Factory. However, if a powerful proton driver is constructed for another purpose or if the MEMPHYS detector is built for astroparticle physics, the Super Beam also becomes very attractive
Status of the ESSνSB Target Station
The goal of the ESSSB project is to discover and measure neutrino CP violation with unprecedented sensitivity. The associated ESSSB H2020 Design Study is aimed at investigating and proposing a conceptual design of a new neutrino superbeam in Europe. The Target Station is a key element of this project, since it will produce a high intensity neutrino superbeam from a 5MW proton beam delivered by the European Spallation Source at Lund. Work Package 4 of this project
focuses on the optimization of the physics performance of the elements producing the beam, such as the targets and the magnetic horns, as well as on the technical aspects related to the Target Station design. The 5MW proton beam will be split laterally into four 1.25MW beams, each with 1.3 μs proton pulses and 14 Hz repetition rate, which will hit four separate targets inserted inside four horns. The production of the neutrino beam under such conditions requires the development of technologies capable of working at a MW power scale, both for the target and for the other
components of the target station facility
Neutrino super beam based on a superconducting proton linac
We present a new design study of the neutrino Super Beam based on the Superconducting Proton Linac at CERN. This beam is aimed at megaton mass physics, a large water Cherenkov detector, proposed for the Laboratoire Souterrain de Modane in France, with a baseline of 130 km. The aim of this proposed facility is to study CP violation in the neutrino sector. In the study reported here, we have developed the conceptual design of the neutrino beam, especially the target and the magnetic focusing device. Indeed, this beam presents several unprecedented challenges, related to the high primary proton beam power (4 MW), the high repetition rate (50 Hz), and the low kinetic energy of the protons (4.5 GeV). The design is completed by a study of all the main components of the system, starting from the transport system to guide the beam to the target up to the beam dump. This is the first complete study of a neutrino beam based on a pebble-bed target capable of standing the large heat deposition of MW class proton beams