12 research outputs found

    ILD silicon tungsten electromagnetic calorimeter first full scale electronic prototype

    No full text
    International audienceThe “long slab” is a new prototype for the SiW-Ecal, a silicon tungsten electromagnetic calorimeter for the International Large Detector (ILD) at the future International Linear Collider (ILC). The new prototype has been evaluated with cosmics, radioactive sources and with 3 GeV electrons in beam tests at the DESY facility, Hamburg. A channel-wise calibration has been achieved, at different angles of incidence of the beam on the sensors. Using data collected at non-normal incidence, the signal of particles traversing adjacent pixels were used to estimate the absolute value of the trigger threshold in units of mips. This new prototype provides us many hints on how to improve the design of the front-end electronics. It is also a convenient tool to estimate the critical characteristics of ILD SiW-Ecal (like power consumption, cooling, readout time, etc.) and to optimise the future design of the detector

    Rare EGFR exon 18 and exon 20 mutations in non-small-cell lung cancer on 10 117 patients: a multicentre observational study by the French ERMETIC-IFCT network

    No full text
    International audienceBACKGROUND: There is scarce data available about epidermal growth factor receptor (EGFR) mutations other than common exon 19 deletions and exon 21 (L858R) mutations. PATIENTS AND METHODS: EGFR exon 18 and/or exon 20 mutations were collected from 10 117 non-small-cell lung cancer (NSCLC) samples analysed at 15 French National Cancer Institute (INCa)-platforms of the ERMETIC-IFCT network. RESULTS: Between 2008 and 2011, 1047 (10%) samples were EGFR-mutated, 102 (10%) with rare mutations: 41 (4%) in exon 18, 49 (5%) in exon 20, and 12 (1%) with other EGFR mutations. Exon 20 mutations were related to never-smoker status, when compared with exon 18 mutations (P \textless 0.001). Median overall survival (OS) of metastatic disease was 21 months [95% confidence interval (CI) 12-24], worse in smokers than in non-smoker patients with exon 20 mutations (12 versus 21 months; hazard ratio [HR] for death 0.27, 95% CI 0.08-0.87, P = 0.03). Under EGFR-tyrosine kinase inhibitors (TKIs), median OS was 14 months (95% CI 6-21); disease control rate was better for complex mutations (6 of 7, 86%) than for single mutations (16 of 40, 40%) (P = 0.03). CONCLUSIONS: Rare EGFR-mutated NSCLCs are heterogeneous, with resistance of distal exon 20 insertions and better sensitivity of exon 18 or complex mutations to EGFR-TKIs, probably requiring individual assessment

    A multicenter blinded study evaluating EGFR and KRAS mutation testing methods in the clinical non-small cell lung cancer setting―IFCT/ERMETIC2 Project Part 1: Comparison of testing methods in 20 French molecular genetic National Cancer Institute platforms

    No full text
    International audienceEpidermal growth factor receptor (EGFR)-tyrosine kinase inhibitors have limited use as first-line treatment for mutated EGFR metastatic non-small cell lung cancer. The French National Cancer Institute has installed molecular genetics platforms implementing EGFR and KRAS testing. However, there is considerable uncertainty as to which detection methods should be applied for routine diagnosis. This study aimed to compare the EGFR and KRAS genotyping methods developed by the IFCT/ERMETIC2 network platforms in two blind panels: 25 samples of serial dilutions of cell line DNA (20 centers) and 74 FFPE lung tumor samples (10 centers). The best threshold of mutation detection on cell lines was obtained using allele-specific amplification-based technologies. Nonamplifiable tissue samples were significantly less common when using alternative testing versus direct sequencing [15%; 95% confidence interval (CI), 14%-16% versus 40%; 95% CI, 39%-42%; P \textless 0.001]. Mutated cases increased from 42% (95% CI, 31%-54%) to 53% (95% CI, 41%-64%), with three supplementary EGFR mutations (p.G179A at exon 18 and p.L858R and p.L861Q at exon 21) and five supplementary KRAS mutations, when using alternative testing instead of direct sequencing. False-positive results were observed when using a PCR-based sizing assay, high-resolution melting, or pyrosequencing. Concordance analysis returned good kappa test scores for EGFR exon 19 and KRAS analysis when comparing sequencing with alternative methods and revealed no difference between alternative techniques themselves

    Optimisation des méthodes algorithmiques en inférence bayésienne. Modélisation dynamique de la transmission d'une infection au sein d'une population hétérogène

    No full text
    International audienceThis work consists in two parts, "Repeated estimates in bayesian modelling " and " Modelling of the transmission of infectious diseases in a population. Estimation of the parameters". Techniques developed in the first part are used at the end of the second part.The first part deals with optimizations of very often used stochastic algorithms, in particular in the context of Bayesian modelling. This optimization is particularly made when empirical study of estimates based on numerous simulated data sets is done. When posterior distribution of parameters are not explicit, its approximation is obtained via iterative stochastic algorithms (of the family of Markov Chain Monte Carlo) which is computationally expensive because has to be done on each data set. In this context, solutions are proposed avoiding an excess large number of MCMC calls but nevertheless giving accurate results. The Importance Sampling method is used in combination with MCMC in Bayesian simulation study. The second part deals with epidemic models, in particular the compartimental model SIS (Susceptible-Infectious-Susceptible) in its stochastic version. The stochastic approach allows to take into account the heterogeneousness of disease evolution in the population. Markov Process is particularly studied where transition probability between states is not linear, the solution of the differential equation in probability being then generally not explicit. The main techniques used in this part are the ones based on Master equation applied on SIS model with a constant population size. Empirical properties of parameters estimates are studied in frequentist and Bayesian context with algorithmic optimization presented in the first part.Ce travail se décompose en deux grandes parties, "Estimations répétées dans le cadre de la modélisation bayésienne" et "Modélisation de la transmission de maladies infectieuses dans une population. Estimation des paramètres.". Les techniques développées dans la première partie sont utilisées en fin de la seconde partie. La première partie est consacrée à des optimisations d'algorithmes stochastiques très souvent utilisés, notamment dans le contexte des modélisations Bayésiennes. Cette optimisation est particulièrement faite lors de l'étude empirique d'estimateurs des paramètres d'un modèle où les qualités des estimateurs sont évaluées sur un grand nombre de jeux de données simulées. Quand les lois a posteriori ne sont pas explicites, le recours à des algorithmes stochastiques itératifs (de la famille des algorithmes dits de Monte Carlo par Chaîne de Makov) pour approcher les lois a posteriori est alors très couteux en temps car doit être fait pour chaque jeu de données. Dans ce contexte, ce travail consiste en l'étude de solutions évitant un trop grand nombre d'appels à ces algorithmes mais permettant bien-sûr d'obtenir malgré tout des résultats précis. La principale technique étudiée dans cette partie est celle de l'échantillonnage préférentiel. La seconde partie est consacrée aux études de modèles épidémiques, en particulier le modèle compartimental dit SIS (Susceptible-Infecté-Susceptible) dans sa version stochastique. L'approche stochastique permet de prendre en compte l'hétérogénéité de l'évolution de la maladie dans la population. les approches par des processus Markoviens sont étudiés où la forme des probabilités de passage entre les états est non linéaire. La solution de l'équation différentielle en probabilité n'est alors en général pas explicite. Les principales techniques utilisées dans cette partie sont celles dites de développement de l'équation maîtresse ("master equation") appliquées au modèle SIS avec une taille de population constante. Les propriétés des estimateurs des paramètres sont étudiées dans le cadre fréquentiste et bayésien. Concernant l'approche Bayésienne, les solutions d'optimisation algorithmique de la première partie sont appliquées

    CEPC Technical Design Report -- Accelerator

    No full text
    International audienceThe Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s

    CEPC Technical Design Report -- Accelerator

    No full text
    International audienceThe Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s

    CEPC Technical Design Report -- Accelerator

    No full text
    International audienceThe Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s

    CEPC Technical Design Report -- Accelerator

    No full text
    International audienceThe Circular Electron Positron Collider (CEPC) is a large scientific project initiated and hosted by China, fostered through extensive collaboration with international partners. The complex comprises four accelerators: a 30 GeV Linac, a 1.1 GeV Damping Ring, a Booster capable of achieving energies up to 180 GeV, and a Collider operating at varying energy modes (Z, W, H, and ttbar). The Linac and Damping Ring are situated on the surface, while the Booster and Collider are housed in a 100 km circumference underground tunnel, strategically accommodating future expansion with provisions for a Super Proton Proton Collider (SPPC). The CEPC primarily serves as a Higgs factory. In its baseline design with synchrotron radiation (SR) power of 30 MW per beam, it can achieve a luminosity of 5e34 /cm^2/s^1, resulting in an integrated luminosity of 13 /ab for two interaction points over a decade, producing 2.6 million Higgs bosons. Increasing the SR power to 50 MW per beam expands the CEPC's capability to generate 4.3 million Higgs bosons, facilitating precise measurements of Higgs coupling at sub-percent levels, exceeding the precision expected from the HL-LHC by an order of magnitude. This Technical Design Report (TDR) follows the Preliminary Conceptual Design Report (Pre-CDR, 2015) and the Conceptual Design Report (CDR, 2018), comprehensively detailing the machine's layout and performance, physical design and analysis, technical systems design, R&D and prototyping efforts, and associated civil engineering aspects. Additionally, it includes a cost estimate and a preliminary construction timeline, establishing a framework for forthcoming engineering design phase and site selection procedures. Construction is anticipated to begin around 2027-2028, pending government approval, with an estimated duration of 8 years. The commencement of experiments could potentially initiate in the mid-2030s
    corecore