234 research outputs found

    An all-electron density functional theory study of the structure and properties of the neutral and singly charged M-12 and M-13 clusters: M = Sc-Zn

    Get PDF
    The electronic and geometrical structures of the M 12 and M 13 clusters where M = Sc, Ti, V, Cr, Mn, Fe, Co, Ni, Cu, and Zn along with their singly negatively and positively charged ions are studied using all-electron density functional theory within the generalized gradient approximation. The geometries corresponding to the lowest total energy states of singly and negatively charged ions of V13, Mn12, Co12, Ni 13, Cu 13, Zn 12, and Zn 13 are found to be different from the geometries of the corresponding neutral parents. The computed ionizationenergies of the neutrals, vertical electron detachment energies from the anions, and energies required to remove a single atom from the M 13 and M 13 + clusters are in good agreement with experiment. The change in a total spin magnetic moment of the cation or anion with respect to a total spin magnetic moment of the corresponding neutral is consistent with the one-electron model in most cases, i.e., they differ by ±1.0 μ B. Exceptions are found only for Sc12 −, Ti12 +, Mn12 −, Mn12 +, Fe12 −, Fe13 +, and Co12 +

    Evaluation of bottom-up and top-down strategies for aggregated forecasts: state space models and arima applications

    Get PDF
    Abstract. In this research, we consider monthly series from the M4 competition to study the relative performance of top-down and bottom-up strategies by means of implementing forecast automation of state space and ARIMA models. For the bottomup strategy, the forecast for each series is developed individually and then these are combined to produce a cumulative forecast of the aggregated series. For the top-down strategy, the series or components values are first combined and then a single forecast is determined for the aggregated series. Based on our implementation, state space models showed a higher forecast performance when a top-down strategy is applied. ARIMA models had a higher forecast performance for the bottom-up strategy. For state space models the top-down strategy reduced the overall error significantly. ARIMA models showed to be more accurate when forecasts are first determined individually. As part of the development we also proposed an approach to improve the forecasting procedure of aggregation strategies

    Electron Collisions with CO Molecule: An R-Matrix Study Using a Large Basis Set

    Get PDF
    Fixed-nuclei R -matrix calculations are performed at the equilibrium geometry of carbon monoxide using the very large cc-pV6Z Gaussian basis set. Results from a close-coupling model involving 27 low-lying target states indicate the presence of three2Σ+ resonances at 10.1 eV (width 0.1 eV), 10.38 eV (0.0005 eV), and 11.15 eV (0.005 eV), a2Δ resonance at 13.3 eV (0.1 eV) and two2Π resonances at 1.9 eV (1.3 eV) and 12.8 eV (0.1 eV). These new results are in very good agreement with many experimental studies but in contrast to a previous calculation using a smaller cc-pVTZ basis set where we found only one2Σ+ resonances at 12.9 eV. This is the first time that any theoretical study has reported these high lying2Σ+ resonances in agreement to experiment and reported detection of a2Δ resonance. Total, elastic and electronic excitation cross sections of CO by electron impact are also presented

    The Compact Linear Collider (CLIC) - 2018 Summary Report

    Get PDF

    The Compact Linear Collider (CLIC) - 2018 Summary Report

    Get PDF
    The Compact Linear Collider (CLIC) is a TeV-scale high-luminosity linear e+ee^+e^- collider under development at CERN. Following the CLIC conceptual design published in 2012, this report provides an overview of the CLIC project, its current status, and future developments. It presents the CLIC physics potential and reports on design, technology, and implementation aspects of the accelerator and the detector. CLIC is foreseen to be built and operated in stages, at centre-of-mass energies of 380 GeV, 1.5 TeV and 3 TeV, respectively. CLIC uses a two-beam acceleration scheme, in which 12 GHz accelerating structures are powered via a high-current drive beam. For the first stage, an alternative with X-band klystron powering is also considered. CLIC accelerator optimisation, technical developments and system tests have resulted in an increased energy efficiency (power around 170 MW) for the 380 GeV stage, together with a reduced cost estimate at the level of 6 billion CHF. The detector concept has been refined using improved software tools. Significant progress has been made on detector technology developments for the tracking and calorimetry systems. A wide range of CLIC physics studies has been conducted, both through full detector simulations and parametric studies, together providing a broad overview of the CLIC physics potential. Each of the three energy stages adds cornerstones of the full CLIC physics programme, such as Higgs width and couplings, top-quark properties, Higgs self-coupling, direct searches, and many precision electroweak measurements. The interpretation of the combined results gives crucial and accurate insight into new physics, largely complementary to LHC and HL-LHC. The construction of the first CLIC energy stage could start by 2026. First beams would be available by 2035, marking the beginning of a broad CLIC physics programme spanning 25-30 years
    corecore