42 research outputs found

    Heuristic algorithm for a flexible flow shop problem minimizing total weighted completion time (WJCJ) with release dates (RJ), setup (SJK) constrains with proportional machines (QM) at stations

    Get PDF
    La programación de operaciones para un taller donde los trabajos poseen fechas de entrega, alistamiento y ponderación, buscando minimizar el tiempo de terminación ponderado no es un nuevo problema que se a trabajado a nivel investigativo, pero es un problema poco trabajado por ser un problema con una complejidad computacional alta, considerada de tipo NP-HARD, campo donde la mayoría de los casos las heurísticas dan soluciones no óptimas. Lo que se muestra en esta investigación es el desarrollo de una heurística que arroje una forma eficiente para programar los trabajos en un taller de máquinas en paralelo que tiene las condiciones antes mencionadas y busque minimizar el tiempo total ponderado en el sistema.Abstract: Scheduling on many stations and machines minimizing total weighted completion time (wjCj) as objective with released dates and setup’s constraints is not a new problem, but it is a low investigated because it has a computational complexity of NP-Hard and in most cases the heuristics are not optimal solutions Our objective in the problem is develop an heuristic to be applied through an algorithm that gives as output a sequence of jobs in each station and machines having different velocities in each one and minimizing the principal objective total weighted completion time

    A PTAS for Minimizing Average Weighted Completion Time With Release Dates on Uniformly Related Machines

    Get PDF
    A classical scheduling problem is to find schedules that minimize average weighted completion time of jobs with release dates. When multiple machines are available, the machine environments may range from identical machines (the processing time required by a job is invariant across the machines) at one end, to unrelated machines (the processing time required by a job on any machine is an arbitrary function of the specific machine) at the other end of the spectrum. While the problem is strongly NP-hard even in the case of a single machine, constant factor approximation algorithms have been known for even the most general machine environment of unrelated machines. Recently, a polynomial-time approximation scheme (PTAS) was discovered for the case of identical parallel machines [1]. In contrast, it is known that this problem is MAX SNP-hard for unrelated machines [10]. An important open problem is to determine the approximability of the intermediate case of uniformly related machines where each machine i has a speed si and it takes p/si time to executing a job of processing size pIn this paper, we resolve this problem by obtaining a PTAS for the problem. This improves the earlier known ratio of (2 + ∈) for the problem

    Two-agent scheduling in open shops subject to machine availability and eligibility constraints

    Get PDF
    Purpose: The aims of this article are to develop a new mathematical formulation and a new heuristic for the problem of preemptive two-agent scheduling in open shops subject to machine maintenance and eligibility constraints. Design/methodology: Using the ideas of minimum cost flow network and constraint programming, a heuristic and a network based linear programming are proposed to solve the problem. Findings: Computational experiments show that the heuristic generates a good quality schedule with a deviation of 0.25% on average from the optimum and the network based linear programming model can solve problems up to 110 jobs combined with 10 machines without considering the constraint that each operation can be processed on at most one machine at a time. In order to satisfy this constraint, a time consuming Constraint Programming is proposed. For n = 80 and m = 10, the average execution time for the combined models (linear programming model combined with Constraint programming) exceeds two hours. Therefore, the heuristic algorithm we developed is very efficient and is in need. Practical implications: Its practical implication occurs in TFT-LCD and E-paper manufacturing wherein units go through a series of diagnostic tests that do not have to be performed in any specified order. Originality/value: The main contribution of the article is to split the time horizon into many time intervals and use the dispatching rule for each time interval in the heuristic algorithm, and also to combine the minimum cost flow network with the Constraint Programming to solve the problem optimally.Peer Reviewe

    Scheduling in Cloud Computing Environment

    Get PDF

    A statistical comparison of metaheuristics for unrelated parallel machine scheduling problems with setup times

    Get PDF
    Manufacturing scheduling aims to optimize one or more performance measures by allocating a set of resources to a set of jobs or tasks over a given period of time. It is an area that considers a very important decision-making process for manufacturing and production systems. In this paper, the unrelated parallel machine scheduling problem with machine-dependent and job-sequence-dependent setup times is addressed. This problem involves the scheduling of tasks on unrelated machines with setup times in order to minimize the makespan. The genetic algorithm is used to solve small and large instances of this problem when processing and setup times are balanced (Balanced problems), when processing times are dominant (Dominant P problems), and when setup times are dominant (Dominant S problems). For small instances, most of the values achieved the optimal makespan value, and, when compared to the metaheuristic ant colony optimization (ACOII) algorithm referred to in the literature, it was found that there were no significant differences between the two methods. However, in terms of large instances, there were significant differences between the optimal makespan obtained by the two methods, revealing overall better performance by the genetic algorithm for Dominant S and Dominant P problems.FCT—Fundação para a Ciência e Tecnologia through the R&D Units Project Scope UIDB/00319/2020 and EXPL/EME-SIS/1224/2021 and PhD grant UI/BD/150936/2021

    Robust long-term production planning

    Get PDF

    Parallel machine scheduling subject to machine availability constraints

    Get PDF
    Cataloged from PDF version of article.Within a planning horizon, machines may become unavailable due to unexpected breakdowns or pre-scheduled activities. A realistic approach in constructing the production schedule should explicitly take into account such periods of unavailability. This study addresses the parallel machine-scheduling problem subject to availability constraints on each machine. The objectives of minimizing the total completion time and minimizing the maximum completion time are studied. The problems with both objectives are known to be NP-hard. We develop an exact branch-and-bound procedure and propose three heuristic algorithms for the total completion time problem. Similarly, we propose exact and approximation algorithms also for the maximum completion time problem. All proposed algorithms are tested through extensive computational experimentation, and several insights are provided based on computational results.Sevindik, KayaM.S

    The Distributed and Assembly Scheduling Problem

    Full text link
    Tesis por compendio[EN] Nowadays, manufacturing systems meet different new global challenges and the existence of a collaborative manufacturing environment is essential to face with. Distributed manufacturing and assembly systems are two manufacturing systems which allow industries to deal with some of these challenges. This thesis studies a production problem in which both distributed manufacturing and assembly systems are considered. Although distributed manufacturing systems and assembly systems are well-known problems and have been extensively studied in the literature, to the best of our knowledge, considering these two systems together as in this thesis is the first effort in the literature. Due to the importance of scheduling optimization on production performance, some different ways to optimize the scheduling of the considered problem are discussed in this thesis. The studied scheduling setting consists of two stages: A production and an assembly stage. Various production centers make the first stage. Each of these centers consists of several machines which are dedicated to manufacture jobs. A single assembly machine is considered for the second stage. The produced jobs are assembled on the assembly machine to form final products through a defined assembly program. In this thesis, two different problems regarding two different production configurations for the production centers of the first stage are considered. The first configuration is a flowshop that results in what we refer to as the Distributed Assembly Permutation Flowshop Scheduling Problem (DAPFSP). The second problem is referred to as the Distributed Parallel Machine and Assembly Scheduling Problem (DPMASP), where unrelated parallel machines configure the production centers. Makespan minimization of the product on the assembly machine located in the assembly stage is considered as the objective function for all considered problems. In this thesis some extensions are considered for the studied problems so as to bring them as close as possible to the reality of production shops. In the DAPFSP, sequence dependent setup times are added for machines in both production and assembly stages. Similarly, in the DPMASP, due to technological constraints, some defined jobs can be processed only in certain factories. Mathematical models are presented as an exact solution for some of the presented problems and two state-of-art solvers, CPLEX and GUROBI are used to solve them. Since these solvers are not able to solve large sized problems, we design and develop heuristic methods to solve the problems. In addition to heuristics, some metaheuristics are also designed and proposed to improve the solutions obtained by heuristics. Finally, for each proposed problem, the performance of the proposed solution methods is compared through extensive computational and comprehensive ANOVA statistical analysis.[ES] Los sistemas de producción se enfrentan a retos globales en los que el concepto de fabricación colaborativa es crucial para poder tener éxito en el entorno cambiante y complejo en el que nos encontramos. Una característica de los sistemas productivos que puede ayudar a lograr este objetivo consiste en disponer de una red de fabricación distribuida en la que los productos se fabriquen en localizaciones diferentes y se vayan ensamblando para obtener el producto final. En estos casos, disponer de modelos y herramientas para mejorar el rendimiento de sistemas de producción distribuidos con ensamblajes es una manera de asegurar la eficiencia de los mismos. En esta tesis doctoral se estudian los sistemas de fabricación distribuidos con operaciones de ensamblaje. Los sistemas distribuidos y los sistemas con operaciones de ensamblaje han sido estudiados por separado en la literatura. De hecho, no se han encontrado estudios de sistemas con ambas características consideradas de forma conjunta. Dada la complejidad de considerar conjuntamente ambos tipos de sistemas a la hora de realizar la programación de la producción en los mismos, se ha abordado su estudio considerando un modelo bietápico en la que en la primera etapa se consideran las operaciones de producción y en la segunda se plantean las operaciones de ensamblaje. Dependiendo de la configuración de la primera etapa se han estudiado dos variantes. En la primera variante se asume que la etapa de producción está compuesta por sendos sistemas tipo flowshop en los que se fabrican los componentes que se ensamblan en la segunda etapa (Distributed Assembly Permutation Flowshop Scheduling Problem o DAPFSP). En la segunda variante se considera un sistema de máquinas en paralelo no relacionadas (Distributed Parallel Machine and Assembly Scheduling Problem o DPMASP). En ambas variantes se optimiza la fecha de finalización del último trabajo secuenciado (Cmax) y se contempla la posibilidad que existan tiempos de cambio (setup) dependientes de la secuencia de trabajos fabricada. También, en el caso DPMASP se estudia la posibilidad de prohibir o no el uso de determinadas máquinas de la etapa de producción. Se han desarrollado modelos matemáticos para resolver algunas de las variantes anteriores. Estos modelos se han resuelto mediante los programas CPLEX y GUROBI en aquellos casos que ha sido posible. Para las instancias en los que el modelo matemático no ofrecía una solución al problema se han desarrollado heurísticas y metaheurísticas para ello. Todos los procedimientos anteriores han sido estudiados para determinar el rendimiento de los diferentes algoritmos planteados. Para ello se ha realizado un exhaustivo estudio computacional en el que se han aplicado técnicas ANOVA. Los resultados obtenidos en la tesis permiten avanzar en la comprensión del comportamiento de los sistemas productivos distribuidos con ensamblajes, definiendo algoritmos que permiten obtener buenas soluciones a este tipo de problemas tan complejos que aparecen tantas veces en la realidad industrial.[CA] Els sistemes de producció s'enfronten a reptes globals en què el concepte de fabricació col.laborativa és crucial per a poder tindre èxit en l'entorn canviant i complex en què ens trobem. Una característica dels sistemes productius que pot ajudar a aconseguir este objectiu consistix a disposar d'una xarxa de fabricació distribuïda en la que els productes es fabriquen en localitzacions diferents i es vagen acoblant per a obtindre el producte final. En estos casos, disposar de models i ferramentes per a millorar el rendiment de sistemes de producció distribuïts amb acoblaments és una manera d'assegurar l'eficiència dels mateixos. En esta tesi doctoral s'estudien els sistemes de fabricació distribuïts amb operacions d'acoblament. Els sistemes distribuïts i els sistemes amb operacions d'acoblament han sigut estudiats per separat en la literatura però, en allò que es coneix, no s'han trobat estudis de sistemes amb ambdós característiques conjuntament. Donada la complexitat de considerar conjuntament ambdós tipus de sistemes a l'hora de realitzar la programació de la producció en els mateixos, s'ha abordat el seu estudi considerant un model bietàpic en la que en la primera etapa es consideren les operacions de producció i en la segona es plantegen les operacions d'acoblament. Depenent de la configuració de la primera etapa s'han estudiat dos variants. En la primera variant s'assumix que l'etapa de producció està composta per sengles sistemes tipus flowshop en els que es fabriquen els components que s'acoblen en la segona etapa (Distributed Assembly Permutation Flowshop Scheduling Problem o DAPFSP). En la segona variant es considera un sistema de màquines en paral.lel no relacionades (Distributed Parallel Machine and Assembly Scheduling Problem o DPMASP). En ambdós variants s'optimitza la data de finalització de l'últim treball seqüenciat (Cmax) i es contempla la possibilitat que existisquen temps de canvi (setup) dependents de la seqüència de treballs fabricada. També, en el cas DPMASP s'estudia la possibilitat de prohibir o no l'ús de determinades màquines de l'etapa de producció. S'han desenvolupat models matemàtics per a resoldre algunes de les variants anteriors. Estos models s'han resolt per mitjà dels programes CPLEX i GUROBI en aquells casos que ha sigut possible. Per a les instàncies en què el model matemàtic no oferia una solució al problema s'han desenrotllat heurístiques i metaheurísticas per a això. Tots els procediments anteriors han sigut estudiats per a determinar el rendiment dels diferents algoritmes plantejats. Per a això s'ha realitzat un exhaustiu estudi computacional en què s'han aplicat tècniques ANOVA. Els resultats obtinguts en la tesi permeten avançar en la comprensió del comportament dels sistemes productius distribuïts amb acoblaments, definint algoritmes que permeten obtindre bones solucions a este tipus de problemes tan complexos que apareixen tantes vegades en la realitat industrial.Hatami, S. (2016). The Distributed and Assembly Scheduling Problem [Tesis doctoral no publicada]. Universitat Politècnica de València. https://doi.org/10.4995/Thesis/10251/64072TESISCompendi