    Inapproximability Results for Scheduling with Interval and Resource Restrictions

    Get PDF
    In the restricted assignment problem, the input consists of a set of machines and a set of jobs each with a processing time and a subset of eligible machines. The goal is to find an assignment of the jobs to the machines minimizing the makespan, that is, the maximum summed up processing time any machine receives. Herein, jobs should only be assigned to those machines on which they are eligible. It is well-known that there is no polynomial time approximation algorithm with an approximation guarantee of less than 1.5 for the restricted assignment problem unless P=NP. In this work, we show hardness results for variants of the restricted assignment problem with particular types of restrictions. For the case of interval restrictions - where the machines can be totally ordered such that jobs are eligible on consecutive machines - we show that there is no polynomial time approximation scheme (PTAS) unless P=NP. The question of whether a PTAS for this variant exists was stated as an open problem before, and PTAS results for special cases of this variant are known. Furthermore, we consider a variant with resource restriction where the sets of eligible machines are of the following form: There is a fixed number of (renewable) resources, each machine has a capacity, and each job a demand for each resource. A job is eligible on a machine if its demand is at most as big as the capacity of the machine for each resource. For one resource, this problem has been intensively studied under several different names and is known to admit a PTAS, and for two resources the variant with interval restrictions is contained as a special case. Moreover, the version with multiple resources is closely related to makespan minimization on parallel machines with a low rank processing time matrix. We show that there is no polynomial time approximation algorithm with a rate smaller than 48/47 ? 1.02 or 1.5 for scheduling with resource restrictions with 2 or 4 resources, respectively, unless P=NP. All our results can be extended to the so called Santa Claus variants of the problems where the goal is to maximize the minimal processing time any machine receives

    Algorithms for Hierarchical and Semi-Partitioned Parallel Scheduling

    Get PDF
    We propose a model for scheduling jobs in a parallel machine setting that takes into account the cost of migrations by assuming that the processing time of a job may depend on the specific set of machines among which the job is migrated. For the makespan minimization objective, the model generalizes classical scheduling problems such as unrelated parallel machine scheduling, as well as novel ones such as semi-partitioned and clustered scheduling. In the case of a hierarchical family of machines, we derive a compact integer linear programming formulation of the problem and leverage its fractional relaxation to obtain a polynomial-time 2-approximation algorithm. Extensions that incorporate memory capacity constraints are also discussed

    Scheduling with processing set restrictions : a survey

    Get PDF
    2008-2009 > Academic research: refereed > Publication in refereed journalAccepted ManuscriptPublishe

    Parallel Machine Scheduling with Nested Processing Set Restrictions and Job Delivery Times

    Get PDF
    The problem of scheduling jobs with delivery times on parallel machines is studied, where each job can only be processed on a specific subset of the machines called its processing set. Two distinct processing sets are either nested or disjoint; that is, they do not partially overlap. All jobs are available for processing at time 0. The goal is to minimize the time by which all jobs are delivered, which is equivalent to minimizing the maximum lateness from the optimization viewpoint. A list scheduling approach is analyzed and its approximation ratio of 2 is established. In addition, a polynomial time approximation scheme is derived

    Unrelated Machines Scheduling With Machine Eligibility Restrictions

    Get PDF
    In this paper we present a new heuristic algorithm to minimize the makespan for scheduling jobs on unrelated parallel machines with machine eligibility restrictions ( R^ I M .1 C^^). To the best of our knowledge, the problem has not been addressed previously in the literature. The multi-phase heuristic algorithm incorporates new concepts from the multi-depot vehicle routing in the constructive heuristic. A computational study includes problems with two or four machines, up to 105 jobs, and three levels of a machine selection parameter. The heuristic algorithm solution values are compared to optimal solution values. The results show that the heuristic algorithm can yield solutions within a few percent of the optimal solutions with performance improving as the number of jobs to be scheduled increases

    Scheduling parallel machines with inclusive processing set restrictions and job release times

    Get PDF
    2009-2010 > Academic research: refereed > Publication in refereed journalAccepted ManuscriptPublishe

    Restricted assignment scheduling with resource constraints

    Get PDF
    We consider parallel machine scheduling with job assignment restrictions, i.e., each job can only be processed on a certain subset of the machines. Moreover, each job requires a set of renewable resources. Any resource can be used by only one job at any time. The objective is to minimize the makespan. We present approximation algorithms with constant worst-case bound in the case that each job requires only a fixed number of resources. For some special cases optimal algorithms with polynomial running time are given. If any job requires at most one resource and the number of machines is fixed, we give a PTAS. On the other hand we prove that the problem is APX-hard, even when there are just three machines and the input is restricted to unit-time jobs. (C) 2018 Published by Elsevier B.V

    Some combinational optimization problems on radio network communication and machine scheduling

    Get PDF
    The combinatorial optimization problems coming from two areas are studied in this dissertation: network communication and machine scheduling. In the network communication area, the complexity of distributed broadcasting and distributed gossiping is studied in the setting of random networks. Two different models are considered: one is random geometric networks, the main model used to study properties of sensor and ad-hoc networks, where ri points are randomly placed in a unit square and two points are connected by an edge if they are at most a certain fixed distance r from each other. The other model is the so-called line-of-sight networks, a new network model introduced recently by Frieze et al. (SODA\u2707). The nodes in this model are randomly placed (with probability p) on an n x n grid and a node can communicate with all the nodes that are in at most a certain fixed distance r and which are in the same row or column. It can be shown that in many scenarios of both models, the random structure of these networks makes it possible to perform distributed gossiping in asymptotically optimal time 0(D), where D is the diameter of the network. The simulation results show that most algorithms especially the randomized algorithm works very fast in practice. In the scheduling area, the first problem is online scheduling a set of equal processing time tasks with precedence constraints so as to minimize the makespan. It can be shown that Hu \u27s algorithm yields an asymptotic competitive ratio of 3/2 for intree precedence constraints and an asymptotic competitive ratio of 1 for outtree precedences, and Coffinan-Graham algorithm yields an asymptotic competitive ratio of 1 for arbitrary precedence constraints and two machines.The second scheduling problem is the integrated production and delivery scheduling with disjoint windows. In this problem, each job is associated with a time window, and a profit. A job must be finished within its time window to get the profit. The objective is to pick a set ofjobs and schedule them to get the maximum total profit. For a single machine and unit profit, an optimal algorithm is proposed. For a single machine and arbitrary profit, a fully polynomial time approximation scheme(FPTAS) is proposed. These algorithms can be extended to multiple machines with approximation ratio less than e/(e - 1). The third scheduling problem studied in this dissertation is the preemptive scheduling algorithms with nested and inclusive processing set restrictions. The objective is to minimize the makespan of the schedule. It can be shown that there is no optimal online algorithm even for the case of inclusive processing set. Then a linear time optimal algorithm is given for the case of nested processing set, where all jobs are available for processing at time t = 0. A more complicated algorithm with running time 0(n log ri) is given that produces not only optimal but also maximal schedules. When jobs have different release times, an optimal algorithm is given for the nested case and a faster optimal algorithm is given for the inclusive processing set case

    Approximation Schemes for Machine Scheduling

    Get PDF
    In the classical problem of makespan minimization on identical parallel machines, or machine scheduling for short, a set of jobs has to be assigned to a set of machines. The jobs have a processing time and the goal is to minimize the latest finishing time of the jobs. Machine scheduling is well known to be NP-hard and thus there is no polynomial time algorithm for this problem that is guaranteed to find an optimal solution unless P=NP. There is, however, a polynomial time approximation scheme (PTAS) for machine scheduling, that is, a family of approximation algorithms with ratios arbitrarily close to one. Whether a problem admits an approximation scheme or not is a fundamental question in approximation theory. In the present work, we consider this question for several variants of machine scheduling. We study the problem where the machines are partitioned into a constant number of types and the processing time of the jobs is also dependent on the machine type. We present so called efficient PTAS (EPTAS) results for this problem and variants thereof. We show that certain cases of machine scheduling with assignment restrictions do not admit a PTAS unless P=NP. Moreover, we introduce a graph framework based on the restrictions of the jobs and use it in the design of approximation schemes for other variants. We introduce an enhanced integer programming formulation for assignment problems, show that it can be efficiently solved, and use it in the EPTAS design for variants of machine scheduling with setup times. For one of the problems, we show that there is also a PTAS in the case with uniform machines, where machines have speeds influencing the processing times of the jobs. We consider cases in which each job requires a certain amount of a shared renewable resource and the processing time is depended on the amount of resource it receives or not. We present so called asymptotic fully polynomial time approximation schemes (AFPTAS) for the problems