54 research outputs found

    A permutation flowshop model with time-lags and waiting time preferences of the patients

    Get PDF
    The permutation flowshop is a widely applied scheduling model. In many real-world applications of this model, a minimum and maximum time-lag must be considered between consecutive operations. We can apply this model to healthcare systems in which the minimum time-lag could be the transfer times, while the maximum time-lag could refer to the number of hours patients must wait. We have modeled a MILP and a constraint programming model and solved them using CPLEX to find exact solutions. Solution times for both methods are presented. We proposed two metaheuristic algorithms based on genetic algorithm and solved and compared them with each other. A sensitivity of analysis of how a change in minimum and maximum time-lags can impact waiting time and Cmax of the patients is performed. Results suggest that constraint programming is a more efficient method to find exact solutions and changes in the values of minimum and maximum time-lags can impact waiting times of the patients and Cmax significantly

    Cable Tree Wiring -- Benchmarking Solvers on a Real-World Scheduling Problem with a Variety of Precedence Constraints

    Get PDF
    Cable trees are used in industrial products to transmit energy and information between different product parts. To this date, they are mostly assembled by humans and only few automated manufacturing solutions exist using complex robotic machines. For these machines, the wiring plan has to be translated into a wiring sequence of cable plugging operations to be followed by the machine. In this paper, we study and formalize the problem of deriving the optimal wiring sequence for a given layout of a cable tree. We summarize our investigations to model this cable tree wiring Problem (CTW) as a traveling salesman problem with atomic, soft atomic, and disjunctive precedence constraints as well as tour-dependent edge costs such that it can be solved by state-of-the-art constraint programming (CP), Optimization Modulo Theories (OMT), and mixed-integer programming (MIP) solvers. It is further shown, how the CTW problem can be viewed as a soft version of the coupled tasks scheduling problem. We discuss various modeling variants for the problem, prove its NP-hardness, and empirically compare CP, OMT, and MIP solvers on a benchmark set of 278 instances. The complete benchmark set with all models and instance data is available on github and is accepted for inclusion in the MiniZinc challenge 2020

    The dynamic, resource-constrained shortest path problem on an acyclic graph with application in column generation and literature review on sequence-dependent scheduling

    Get PDF
    This dissertation discusses two independent topics: a resource-constrained shortest-path problem (RCSP) and a literature review on scheduling problems involving sequence-dependent setup (SDS) times (costs). RCSP is often used as a subproblem in column generation because it can be used to solve many practical problems. This dissertation studies RCSP with multiple resource constraints on an acyclic graph, because many applications involve this configuration, especially in column genetation formulations. In particular, this research focuses on a dynamic RCSP since, as a subproblem in column generation, objective function coefficients are updated using new values of dual variables at each iteration. This dissertation proposes a pseudo-polynomial solution method for solving the dynamic RCSP by exploiting the special structure of an acyclic graph with the goal of effectively reoptimizing RCSP in the context of column generation. This method uses a one-time âÂÂpreliminaryâ phase to transform RCSP into an unconstrained shortest path problem (SPP) and then solves the resulting SPP after new values of dual variables are used to update objective function coefficients (i.e., reduced costs) at each iteration. Network reduction techniques are considered to remove some nodes and/or arcs permanently in the preliminary phase. Specified techniques are explored to reoptimize when only several coefficients change and for dealing with forbidden and prescribed arcs in the context of a column generation/branch-and-bound approach. As a benchmark method, a label-setting algorithm is also proposed. Computational tests are designed to show the effectiveness of the proposed algorithms and procedures. This dissertation also gives a literature review related to the class of scheduling problems that involve SDS times (costs), an important consideration in many practical applications. It focuses on papers published within the last decade, addressing a variety of machine configurations - single machine, parallel machine, flow shop, and job shop - reviewing both optimizing and heuristic solution methods in each category. Since lot-sizing is so intimately related to scheduling, this dissertation reviews work that integrates these issues in relationship to each configuration. This dissertation provides a perspective of this line of research, gives conclusions, and discusses fertile research opportunities posed by this class of scheduling problems. since, as a subproblem in column generation, objective function coefficients are updated using new values of dual variables at each iteration. This dissertation proposes a pseudo-polynomial solution method for solving the dynamic RCSP by exploiting the special structure of an acyclic graph with the goal of effectively reoptimizing RCSP in the context of column generation. This method uses a one-tim

    Heuristics and metaheuristics for heavily constrained hybrid flowshop problems

    Full text link
    Due to the current trends in business as the necessity to have a large catalogue of products, orders that increase in frequency but not in size, globalisation and a market that is increasingly competitive, the production sector faces an ever harder economical environment. All this raises the need for production scheduling with maximum efficiency and effectiveness. The first scientific publications on production scheduling appeared more than half a century ago. However, many authors have recognised a gap between the literature and the industrial problems. Most of the research concentrates on optimisation problems that are actually a very simplified version of reality. This allows for the use of sophisticated approaches and guarantees in many cases that optimal solutions are obtained. Yet, the exclusion of real-world restrictions harms the applicability of those methods. What the industry needs are systems for optimised production scheduling that adjust exactly to the conditions in the production plant and that generates good solutions in very little time. This is exactly the objective in this thesis, that is, to treat more realistic scheduling problems and to help closing the gap between the literature and practice. The considered scheduling problem is called the hybrid flowshop problem, which consists in a set of jobs that flow through a number of production stages. At each of the stages, one of the machines that belong to the stage is visited. A series of restriction is considered that include the possibility to skip stages, non-eligible machines, precedence constraints, positive and negative time lags and sequence dependent setup times. In the literature, such a large number of restrictions has not been considered simultaneously before. Briefly, in this thesis a very realistic production scheduling problem is studied. Various optimisation methods are presented for the described scheduling problem. A mixed integer programming model is proposed, in order to obtaiUrlings ., T. (2010). Heuristics and metaheuristics for heavily constrained hybrid flowshop problems [Tesis doctoral no publicada]. Universitat Politècnica de València. https://doi.org/10.4995/Thesis/10251/8439Palanci

    Routing and scheduling optimisation under uncertainty for engineering applications

    Get PDF
    The thesis aims to develop a viable computational approach suitable for solving large vehicle routing and scheduling optimisation problems affected by uncertainty. The modelling framework is built upon recent advances in Stochastic Optimisation, Robust Optimisation and Distributionally Robust Optimization. The utility of the methodology is presented on two classes of discrete optimisation problems: scheduling satellite communication, which is a variant of Machine Scheduling, and the Vehicle Routing Problem with Time Windows and Synchronised Visits. For each problem class, a practical engineering application is formulated using data coming from the real world. The significant size of the problem instances reinforced the need to apply a different computational approach for each problem class. Satellite communication is scheduled using a Mixed-Integer Programming solver. In contrast, the vehicle routing problem with synchronised visits is solved using a hybrid method that combines Iterated Local Search, Constraint Programming and the Guided Local Search metaheuristic. The featured application of scheduling satellite communication is the Satellite Quantum Key Distribution for a system that consists of one spacecraft placed in the Lower Earth Orbit and a network of optical ground stations located in the United Kingdom. The satellite generates cryptographic keys and transmits them to individual ground stations. Each ground station should receive the number of keys in proportion to the importance of the ground station in the network. As clouds containing water attenuate the signal, reliable scheduling needs to account for cloud cover predictions, which are naturally affected by uncertainty. A new uncertainty sets tailored for modelling uncertainty in predictions of atmospheric phenomena is the main contribution to the methodology. The uncertainty set models the evolution of uncertain parameters using a Multivariate Vector Auto-Regressive Time Series, which preserves correlations over time and space. The problem formulation employing the new uncertainty set compares favourably to a suite of alternative models adapted from the literature considering both the computational time and the cost-effectiveness of the schedule evaluated in the cloud cover conditions observed in the real world. The other contribution of the thesis in the satellite scheduling domain is the formulation of the Satellite Quantum Key Distribution problem. The proof of computational complexity and thorough performance analysis of an example Satellite Quantum Key Distribution system accompany the formulation. The Home Care Scheduling and Routing Problem, which instances are solved for the largest provider of such services in Scotland, is the application of the Vehicle Routing Problem with Time Windows and Synchronised Visits. The problem instances contain over 500 visits. Around 20% of them require two carers simultaneously. Such problem instances are well beyond the scalability limitations of the exact method and considerably larger than instances of similar problems considered in the literature. The optimisation approach proposed in the thesis found effective solutions in attractive computational time (i.e., less than 30 minutes) and the solutions reduced the total travel time threefold compared to alternative schedules computed by human planners. The Essential Riskiness Index Optimisation was incorporated into the Constraint Programming model to address uncertainty in visits' duration. Besides solving large problem instances from the real world, the solution method reproduced the majority of the best results reported in the literature and strictly improved the solutions for several instances of a well-known benchmark for the Vehicle Routing Problem with Time Windows and Synchronised Visits.The thesis aims to develop a viable computational approach suitable for solving large vehicle routing and scheduling optimisation problems affected by uncertainty. The modelling framework is built upon recent advances in Stochastic Optimisation, Robust Optimisation and Distributionally Robust Optimization. The utility of the methodology is presented on two classes of discrete optimisation problems: scheduling satellite communication, which is a variant of Machine Scheduling, and the Vehicle Routing Problem with Time Windows and Synchronised Visits. For each problem class, a practical engineering application is formulated using data coming from the real world. The significant size of the problem instances reinforced the need to apply a different computational approach for each problem class. Satellite communication is scheduled using a Mixed-Integer Programming solver. In contrast, the vehicle routing problem with synchronised visits is solved using a hybrid method that combines Iterated Local Search, Constraint Programming and the Guided Local Search metaheuristic. The featured application of scheduling satellite communication is the Satellite Quantum Key Distribution for a system that consists of one spacecraft placed in the Lower Earth Orbit and a network of optical ground stations located in the United Kingdom. The satellite generates cryptographic keys and transmits them to individual ground stations. Each ground station should receive the number of keys in proportion to the importance of the ground station in the network. As clouds containing water attenuate the signal, reliable scheduling needs to account for cloud cover predictions, which are naturally affected by uncertainty. A new uncertainty sets tailored for modelling uncertainty in predictions of atmospheric phenomena is the main contribution to the methodology. The uncertainty set models the evolution of uncertain parameters using a Multivariate Vector Auto-Regressive Time Series, which preserves correlations over time and space. The problem formulation employing the new uncertainty set compares favourably to a suite of alternative models adapted from the literature considering both the computational time and the cost-effectiveness of the schedule evaluated in the cloud cover conditions observed in the real world. The other contribution of the thesis in the satellite scheduling domain is the formulation of the Satellite Quantum Key Distribution problem. The proof of computational complexity and thorough performance analysis of an example Satellite Quantum Key Distribution system accompany the formulation. The Home Care Scheduling and Routing Problem, which instances are solved for the largest provider of such services in Scotland, is the application of the Vehicle Routing Problem with Time Windows and Synchronised Visits. The problem instances contain over 500 visits. Around 20% of them require two carers simultaneously. Such problem instances are well beyond the scalability limitations of the exact method and considerably larger than instances of similar problems considered in the literature. The optimisation approach proposed in the thesis found effective solutions in attractive computational time (i.e., less than 30 minutes) and the solutions reduced the total travel time threefold compared to alternative schedules computed by human planners. The Essential Riskiness Index Optimisation was incorporated into the Constraint Programming model to address uncertainty in visits' duration. Besides solving large problem instances from the real world, the solution method reproduced the majority of the best results reported in the literature and strictly improved the solutions for several instances of a well-known benchmark for the Vehicle Routing Problem with Time Windows and Synchronised Visits

    Sessenta anos de Shop Scheduling : uma revisão sistemática da literatura

    Get PDF
    Orientador : Prof. Dr. Cassius Tadeu ScarpinDissertação (mestrado) - Universidade Federal do Paraná, Setor de Tecnologia, Programa de Pós-Graduação em Engenharia de Produção. Defesa: Curitiba, 09/02/2017Inclui referências : f. 449-492Resumo: Desde o seminal artigo de Johnson em 1954, a Programação da Produção em Shop Scheduling tem se tornado uma área relevante dentro da Pesquisa Operacional e, atualmente, duzentos trabalhos tangentes à temática são publicados anualmente. Dentre os artigos aqui citados tem-se aqueles que se dedicam à apresentação e síntese do estado da arte desse assunto, intitulados artigos de revisão. Quando tais artigos são elaborados a partir de um conjunto objetivo de critérios, relativos à categorização dos artigos selecionados, tem-se a Revisão Sistemática da Literatura (RSL). O presente trabalho realiza uma RSL em Shop Scheduling, a partir da análise de cada ambiente fabril que o compõe. Fez-se o escrutínio de 560 artigos, à luz de um conjunto de métricas, que constitui a estrutura basilar da proposta de nova taxonomia do Shop Scheduling, complementar à notação de Graham, objetivo fulcral do presente trabalho. Além disso, utilizou-se uma representação em redes dos resultados obtidos em algumas das métricas empregadas, como a característica dos itens, algo outrora inaudito em estudos de revisão desse assunto. Ademais, outro ponto relevante desse estudo repousa na identificação de campos pouco explorados, de modo a colaborar com a pesquisa futura neste tomo. Palavras-chave: Shop Scheduling. Revisão Sistemática da Literatura. Taxonomia. Representação em Redes.Abstract: Since Johnson's seminal article in 1954, Shop Scheduling in Production Scheduling has become a relevant area within Operational Research, and currently hundreds of tangential works on the subject are published annually. Among the articles cited here are those dedicated to the presentation and synthesis of the state of the art of this subject, which are entitled review articles. When these articles are elaborated from an objective set of criteria, regarding the categorization of the selected articles, we have the Systematic Review of Literature (SLR). The present work performs a SLR in Shop Scheduling, based on the analysis of each manufacturing environment that composes it. There were 560 articles scrutinized based on a set of metrics, which is the basic structure of the proposed new Taxonomy of Shop Scheduling, complementary to Graham's notation, the main objective of this work. In addition to that a network representation of the results was obtained in some of the metrics used, such as the job characteristics, something previously unheard of in review studies of this subject. Moreover, another relevant point of this study lies in the identification of less explored fields in order to collaborate with future research in this matter. Keywords: Shop Scheduling. Systematic Literature Review. Taxonomy. Network Representation

    Identifying sources of global contention in constraint satisfaction search

    Get PDF
    Much work has been done on learning from failure in search to boost solving of combinatorial problems, such as clause-learning and clause-weighting in boolean satisfiability (SAT), nogood and explanation-based learning, and constraint weighting in constraint satisfaction problems (CSPs). Many of the top solvers in SAT use clause learning to good effect. A similar approach (nogood learning) has not had as large an impact in CSPs. Constraint weighting is a less fine-grained approach where the information learnt gives an approximation as to which variables may be the sources of greatest contention. In this work we present two methods for learning from search using restarts, in order to identify these critical variables prior to solving. Both methods are based on the conflict-directed heuristic (weighted-degree heuristic) introduced by Boussemart et al. and are aimed at producing a better-informed version of the heuristic by gathering information through restarting and probing of the search space prior to solving, while minimizing the overhead of these restarts. We further examine the impact of different sampling strategies and different measurements of contention, and assess different restarting strategies for the heuristic. Finally, two applications for constraint weighting are considered in detail: dynamic constraint satisfaction problems and unary resource scheduling problems

    Project schedule optimisation utilising genetic algorithms

    Get PDF
    This thesis extends the body of research into the application of Genetic Algorithms to the Project Scheduling Problem (PSP). A thorough literature review is conducted in this area as well as in the application of other similar meta-heuristics. The review extends previous similar reviews to include PSP utilizing the Design Structure Matrix (DSM), as well as incorporating recent developments. There is a need within industry for optimisation algorithms that can assist in the identification of optimal schedules when presented with a network that can present a number of possible alternatives. The optimisation requirement may be subtle only performing slight resource levelling or more profound by selecting an optimal mode of execution for a number of activities or evaluating a number of alternative strategies. This research proposes a unique, efficient algorithm using adaptation based on the fitness improvement over successive generations. The algorithm is tested initially using a MATLAB based implementation to solve instances of the travelling salesman problem (TSP). The algorithm is then further developed both within MATLAB and Microsoft Project Visual Basic to optimise both known versions of the Resource Constrained Project Scheduling Problems as well as investigating newly defined variants of the problem class.EThOS - Electronic Theses Online ServiceGBUnited Kingdo
    corecore