7 research outputs found

    A fast FPTAS for single machine scheduling problem of minimizing total weighted earliness and tardiness about a large common due date

    Get PDF
    We address the single machine scheduling problem to minimize the total weighted earliness and tardiness about a nonrestrictive common due date. This is a basic problem with applications to the just-in-time manufacturing. The problem is linked to a Boolean programming problem with a quadratic objective function, known as the half-product. An approach to developing a fast fully polynomial-time approximation scheme (FPTAS) for the problem is identified and implemented. The running time matches the best known running time for an FPTAS for minimizing a half-product with no additive constan

    Approximation schemes for scheduling on a single machine subject to cumulative deterioration and maintenance

    Get PDF
    We consider a scheduling problem on a single machine to minimize the makespan. The processing conditions are subject to cumulative deterioration, but can be restored by a single maintenance. We link the problem to the Subset-sum problem (if the duration of maintenance is constant) and to the Half-Product Problem (if the duration of maintenance depends on its start time). For both versions of the problem, we adapt the existing fully polynomial-time approximation schemes to our problems by handling the additive constants

    Fast approximation schemes for Boolean programming and scheduling problems related to positive convex Half-Product

    Get PDF
    We address a version of the Half-Product Problem and its restricted variant with a linear knapsack constraint. For these minimization problems of Boolean programming, we focus on the development of fully polynomial-time approximation schemes with running times that depend quadratically on the number of variables. Applications to various single machine scheduling problems are reported: minimizing the total weighted flow time with controllable processing times, minimizing the makespan with controllable release dates, minimizing the total weighted flow time for two models of scheduling with rejection

    FPTAS for half-products minimization with scheduling applications

    Get PDF
    Cataloged from PDF version of article.A special class of quadratic pseudo-boolean functions called “half-products” (HP) has recently been introduced. It has been shown that HP minimization, while NP-hard, admits a fully polynomial time approximation scheme (FPTAS). In this note, we provide a more efficient FPTAS. We further show how an FPTAS can also be derived for the general case where the HP function is augmented by a problem-dependent constant and can justifiably be assumed to be nonnegative. This leads to an FPTAS for certain partitioning type problems, including many from the field of scheduling. c 2008 Elsevier B.V. All rights reserved

    Algorithms for scheduling problems with weighted earliness-tardiness penalty

    Get PDF
    Master'sMASTER OF SCIENC

    Subject index volumes 1–92

    Get PDF
    corecore