1,267 research outputs found
Методические подходы к оценке возможности реализации инновационных стратегий
Целью данной статьи является рассмотрение методических подходов к оценке возможности реализации инновационных стратегий
The Short-term Car Flow Planning Model in Rail Freight Company – Case Study
AbstractWith the promotion of the environmentally friendly transportation modes (the European Commission supports the freight transport operations in the rail sector), an increase in the diversification of the demand is observed. While most rail freight companies tend to apply fixed schedules, this approach is not effective turns out to be ineffective due to the need to meet the customer's specific requirements.The purpose of this paper is to present a case study of empty wagon flow planning over a medium term horizon and to discuss the opportunities of improvement of this plans by discrete optimization. In order to increase the utilization and availability of wagons, the planning procedure with a rolling horizon has to be implemented. Unfortunately, since the plan has to be updated ca. every 4hours, this planning approach needs effective optimization tools. Our hybrid two-stage approach is designed to be implemented in such business environment. This formulation allows us to solve real life instances even for a 7-day time horizon
Phase I study on docetaxel and ifosfamide in patients with advanced solid tumours.
Docetaxel and ifosfamide have shown significant activity against a variety of solid tumours. This prompted a phase I trial on the combination of these drugs. This phase I study was performed to assess the feasibility of the combination, to determine the maximum tolerated dose (MTD) and the side effects, and to propose a safe schedule for further phase II studies. A total of 34 patients with a histologically confirmed solid tumour, who were not pretreated with taxanes or ifosfamide and who had received no more than one line of chemotherapy for advanced disease were entered into the study. Treatment consisted of docetaxel given as a 1-h infusion followed by ifosfamide as a 24-h infusion (schedule A), or ifosfamide followed by docetaxel (schedule B) every 3 weeks. Docetaxel doses ranged from 60 to 85 mg m(-2) and ifosfamide doses from 2.5 to 5.0 g m(-2). Granulocytopenia grade 3 and 4 were common (89%), short lasting and ifosfamide dose dependent. Febrile neutropenia and sepsis occurred in 17% and 2% of courses respectively. Non-haematological toxicities were mild to moderate and included alopecia, nausea, vomiting, mucositis, diarrhoea, sensory neuropathy, skin and nail toxicity and oedema. There did not appear to be any pharmacokinetic interaction between docetaxel and ifosfamide. One complete response (CR) (soft tissue sarcoma) and two partial responses (PRs) were documented. A dose of 75 mg m(-2) of docetaxel combined with 5.0 g m(-2) ifosfamide appeared to be manageable. Schedule A was advocated for further treatment
The MultiSite Spectroscopic Telescope campaign: 2m spectroscopy of the V361 Hya variable PG1605+072
We present results and analysis for the 2m spectroscopic part of the
MultiSite Spectroscopic Telescope (MSST) campaign undertaken in May/June 2002.
The goal of the project was to observe the pulsating subdwarf B star PG1605+072
simultaneously in velocity and photometry and to resolve as many of the >50
known modes as possible, which will allow a detailed asteroseismological
analysis. We have obtained over 150 hours of spectroscopy, leading to an
unprecedented noise level of only 207m/s. We report here the detection of 20
frequencies in velocity, with two more likely just below our detection
threshold. In particular, we detect 6 linear combinations, making PG1605+072
only the second star known to show such frequencies in velocity. We investigate
the phases of these combinations and their parent modes and find relationships
between them that cannot be easily understood based on current theory. These
observations, when combined with our simultaneous photometry, should allow
asteroseismology of this most complicated of sdB pulsators.Comment: 9 pages, 5 figures, accepted for publication in A&A; Figure 1 at
lower resolution than accepted versio
Catalog of Galactic Beta Cephei Stars
We present an extensive and up-to-date catalog of Galactic Beta Cephei stars.
This catalog is intended to give a comprehensive overview of observational
characteristics of all known Beta Cephei stars. 93 stars could be confirmed to
be Beta Cephei stars. For some stars we re-analyzed published data or conducted
our own analyses. 61 stars were rejected from the final Beta Cephei list, and
77 stars are suspected to be Beta Cephei stars. A list of critically selected
pulsation frequencies for confirmed Beta Cephei stars is also presented. We
analyze the Beta Cephei stars as a group, such as the distributions of their
spectral types, projected rotational velocities, radial velocities, pulsation
periods, and Galactic coordinates. We confirm that the majority of these stars
are multiperiodic pulsators. We show that, besides two exceptions, the Beta
Cephei stars with high pulsation amplitudes are slow rotators. We construct a
theoretical HR diagram that suggests that almost all 93 Beta Cephei stars are
MS objects. We discuss the observational boundaries of Beta Cephei pulsation
and their physical parameters. We corroborate that the excited pulsation modes
are near to the radial fundamental mode in frequency and we show that the mass
distribution of the stars peaks at 12 solar masses. We point out that the
theoretical instability strip of the Beta Cephei stars is filled neither at the
cool nor at the hot end and attempt to explain this observation
An asteroseismic study of the beta Cephei star 12 Lacertae: multisite spectroscopic observations, mode identification and seismic modelling
We present the results of a spectroscopic multisite campaign for the beta
Cephei star 12 (DD) Lacertae. Our study is based on more than thousand
high-resolution high S/N spectra gathered with 8 different telescopes in a time
span of 11 months. In addition we make use of numerous archival spectroscopic
measurements. We confirm 10 independent frequencies recently discovered from
photometry, as well as harmonics and combination frequencies. In particular,
the SPB-like g-mode with frequency 0.3428 1/d reported before is detected in
our spectroscopy. We identify the four main modes as (l1,m1) = (1, 1), (l2,m2)
= (0, 0), (l3,m3) = (1, 0) and (l4,m4) = (2, 1) for f1 = 5.178964 1/d, f2 =
5.334224 1/d, f3 = 5.066316 1/d and f4 = 5.490133 1/d, respectively. Our
seismic modelling shows that f2 is likely the radial first overtone and that
the core overshooting parameter alpha_ov is lower than 0.4 local pressure scale
heights.Comment: 16 pages, 11 figures, accepted in MNRA
SCIAMACHY Level 1 data: calibration concept and in-flight calibration
The calibration of SCIAMACHY was thoroughly checked since the instrument was launched on-board ENVISAT in February 2002. While SCIAMACHY's functional performance is excellent since launch, a number of technical difficulties have appeared, that required adjustments to the calibration. The problems can be separated into three types: (1) Those caused by the instrument and/or platform environment. Among these are the high water content in the satellite structure and/or MLI layer. This results in the deposition of ice on the detectors in channels 7 and 8 which seriously affects the retrievals in the IR, mostly because of the continuous change of the slit function caused by scattering of the light through the ice layer. Additionally a light leak in channel 7 severely hampers any retrieval from this channel. (2) Problems due to errors in the on-ground calibration and/or data processing affecting for example the radiometric calibration. A new approach based on a mixture of onground and in-flight data is shortly described here. (3) Problems caused by principal limitations of the calibration concept, e.g. the possible appearance of spectral structures after the polarisation correction due to unavoidable errors in the determination of atmospheric polarisation. In this paper we give a complete overview of the calibration and problems that still have to be solved. We will also give an indication of the effect of calibration problems on retrievals where possible. Since the operational processing chain is currently being updated and no newly processed data are available at this point in time, for some calibration issues only a rough estimate of the effect on Level 2 products can be given. However, it is the intention of this paper to serve as a future reference for detailed studies into specific calibration issues
SCIAMACHY Level 1 data: calibration concept and in-flight calibration
The calibration of SCIAMACHY was thoroughly checked since the instrument was launched on-board ENVISAT in February 2002. While SCIAMACHY's functional performance is excellent since launch, a number of technical difficulties have appeared, that required adjustments to the calibration. The problems can be separated into three types: (1) Those caused by the instrument and/or platform environment. Among these are the high water content in the satellite structure and/or MLI layer. This results in the deposition of ice on the detectors in channels 7 and 8 which seriously affects the retrievals in the IR, mostly because of the continuous change of the slit function caused by scattering of the light through the ice layer. Additionally a light leak in channel 7 severely hampers any retrieval from this channel. (2) Problems due to errors in the on-ground calibration and/or data processing affecting for example the radiometric calibration. A new approach based on a mixture of on-ground and in-flight data is shortly described here. (3) Problems caused by principal limitations of the calibration concept, e.g. the possible appearance of spectral structures after the polarisation correction due to unavoidable errors in the determination of atmospheric polarisation. In this paper we give a complete overview of the calibration and problems that still have to be solved. We will also give an indication of the effect of calibration problems on retrievals where possible. Since the operational processing chain is currently being updated and no newly processed data are available at this point in time, for some calibration issues only a rough estimate of the effect on Level 2 products can be given. However, it is the intention of this paper to serve as a future reference for detailed studies into specific calibration issues
- …