390 research outputs found

    SNR maximization and modulo loss reduction for Tomlinson-Harashima precoding

    Get PDF
    Compared to linear precoding, Tomlinson-Harashima precoding (THP) requires less transmit power to eliminate the spatial interference in a multi-user downlink scenario involving a multi-antenna transmitter and geographically separated receivers. However, THP gives rise to certain performance losses, referred to as modulo loss and power loss. Based on the observation that part of the users can omit the modulo operation at the receiver during an entire frame, we present an alternative detector, which reduces the modulo loss compared to the conventional detector. In addition, this contribution compares several existing and novel algorithms for selecting the user ordering and the rotation of the constellations at the transmitter, to increase the SNR at the detector and decrease the modulo loss for the alternative detector. Compared to the better of linear precoding and THP with conventional detector, the optimized alternative detector achieves significant gains (up to about 4 dB) for terrestrial wireless communication, whereas smaller gains (up to about 1 dB) are obtained for multi-beam satellite communication

    A hybrid scatter search. Electromagnetism meta-heuristic for project scheduling.

    Get PDF
    In the last few decades, several effective algorithms for solving the resource-constrained project scheduling problem have been proposed. However, the challenging nature of this problem, summarised in its strongly NP-hard status, restricts the effectiveness of exact optimisation to relatively small instances. In this paper, we present a new meta-heuristic for this problem, able to provide near-optimal heuristic solutions. The procedure combines elements from scatter search, a generic population-based evolutionary search method, and a recently introduced heuristic method for the optimisation of unconstrained continuous functions based on an analogy with electromagnetism theory, hereafter referred to as the electromagnetism meta-heuristic. We present computational experiments on standard benchmark datasets, compare the results with current state-ofthe-art heuristics, and show that the procedure is capable of producing consistently good results for challenging instances of the resource-constrained project scheduling problem. We also demonstrate that the algorithm outperforms state-of-the-art existing heuristics.Algorithms; Effectiveness; Electromagnetism; Functions; Heuristic; Project scheduling; Scatter; Scatter search; Scheduling; Theory;

    The impact of various activity assumptions on the lead-time and resource utilization of resource-constrained projects

    Get PDF
    The well-known resource-constrained project scheduling problem (RCPSP) schedules project activities within the precedence and renewable resource constraints while minimizing the total lead-time of the project. The basic problem description assumes non-pre-emptive activities with fixed durations, and has been extended to various other assumptions in literature. In this paper, we investigate the effect of three activity assumptions on the total lead-time and the total resource utilization of a project. More precisely, we investigate the influence of variable activity durations under a fixed work content, the possibility of allowing activity pre-emption and the use of fast tracking to decrease a project's duration. We give an overview of the procedures developed in literature and present some modifications to existing solution approaches to cope with our activity assumptions under study. We present computational results on a generated dataset and evaluate the impact of all assumptions on the quality of the schedule

    Meta-heuristic resource constrained project scheduling: solution space restrictions and neighbourhood extensions

    Get PDF
    The resource-constrained project scheduling problem (RCPSP) has been extensively investigated during the past decades. Due to its strongly NP-hard status and the need for solving large realistic project instances, the recent focus has shifted from exact optimisation procedures to (meta-) heuristic approaches. In this paper, we extend some existing state-of-the-art RCPSP procedures in two ways. First, we extensively test a decomposition approach that splits problem instances into smaller sub-problems to be solved with an (exact or heuristic) procedure, and re-incorporates the obtained solutions for the sub-problems into the solution of the main problem, possibly leading to an overall better solution. Second, we study the influence of an extended neighbourhood search on the performance of a meta-heuristic procedure. Computational results reveal that both techniques are valuable extensions and lead to improved results

    Pre-emptive resource-constrained project scheduling with setup times

    Get PDF
    Resource-constrained project scheduling with activity pre-emption assumes that activities are allowed to be interrupted and restarted later in the schedule at no extra cost. In the current paper, we extend this pre-emptive scheduling problem with setup times between activity interruptions and the possibility to fast track pre-emptive subparts of activities. The contribution of the paper is twofold. First, we present an optimal branch-and-bound procedure for the pre-emptive resource-constrained project scheduling problem with setup times and fast tracking options. Second, we test the impact of these pre-emptive extensions to the quality of the schedule from a lead-time point-of-view

    Avoiding congestion in freight transport planning: a case study in Flanders

    Full text link
    A substantial increase in transport intensity for passenger and freight traffic has been observed during the last decades and research confirms that this trend will continue in the years to come. Economic centres have turned into heavily congested areas. The freight transport sector incurs excessive waiting times on the road as well as at intermediate stops (e.g. sea terminals, loading or unloading points). This may cause economic losses and environmental damages. Waiting times may be avoided by taking into account congestion in freight transport planning. Vehicle routing problems arise when several pickup and delivery operations need to be performed, mainly by truck, over relatively short distances [1]. Congestion leads to uncertain travel times on links and uncertain waiting times at pickup or delivery locations. Peak hours may be avoided on congested road segments by changing the order in which customers are served. On the other hand, time slots at customer sites may be renegotiated, creating more flexibility to avoid congestion on the road and at customer stops. The objective of this paper is to estimate the benefits of taking congestion into account in transport planning and to quantify the impact of delivery restrictions on transport costs. A highly congested road network raises the need for robust vehicle routing decisions. Current traffic conditions give rise to uncertain travel times. The reliability of travel time on a route is one of the dominant factors affecting route and departure time choices in passenger transport [2]. Similarly, in freight transport the reliability of travel times may be taken into account when planning vehicle routes. In this paper congestion is modelled as time-dependent travel times. These travel times take into account the dynamics of the time lost due to congestion using the Bureau of Public Roads (BPR) function, which is commonly-used for relating travel times to increases in travel volume [3]. The Time Dependent Vehicle Routing Problem (TDVRP) will be studied as a deterministic planning problem taking into account peak hour traffic congestion. Solution methods for the TDVRP have been focused on heuristic approaches [4, 5, 6, 7]. Kok [8] applies a restricted dynamic programming heuristic to solve a TDVRP. In this paper a heuristic algorithm will be presented to solve problem instances of realistic size. Next, this algorithm will be applied to perform a sensitivity analysis to identify which congestion avoiding strategies have a large influence on the objective function. Shippers may adapt the way they plan their transport as a strategy to avoid congestion. For example, time windows at customer locations may be renegotiated, departure times at the depot may be questioned or the assignment of customers to routes and the order in which customers are served may be changed. The proposed methodology will be demonstrated with a Flemish case study

    Betulin-related esters from birch bark tar: identification, origin and archaeological significance

    Get PDF
    International audienc

    TWINLATIN: Twinning European and Latin-American river basins for research enabling sustainable water resources management. Combined Report D3.1 Hydrological modelling report and D3.2 Evaluation report

    Get PDF
    Water use has almost tripled over the past 50 years and in some regions the water demand already exceeds supply (Vorosmarty et al., 2000). The world is facing a “global water crisis”; in many countries, current levels of water use are unsustainable, with systems vulnerable to collapse from even small changes in water availability. The need for a scientifically-based assessment of the potential impacts on water resources of future changes, as a basis for society to adapt to such changes, is strong for most parts of the world. Although the focus of such assessments has tended to be climate change, socio-economic changes can have as significant an impact on water availability across the four main use sectors i.e. domestic, agricultural, industrial (including energy) and environmental. Withdrawal and consumption of water is expected to continue to grow substantially over the next 20-50 years (Cosgrove & Rijsberman, 2002), and consequent changes in availability may drastically affect society and economies. One of the most needed improvements in Latin American river basin management is a higher level of detail in hydrological modelling and erosion risk assessment, as a basis for identification and analysis of mitigation actions, as well as for analysis of global change scenarios. Flow measurements are too costly to be realised at more than a few locations, which means that modelled data are required for the rest of the basin. Hence, TWINLATIN Work Package 3 “Hydrological modelling and extremes” was formulated to provide methods and tools to be used by other WPs, in particular WP6 on “Pollution pressure and impact analysis” and WP8 on “Change effects and vulnerability assessment”. With an emphasis on high and low flows and their impacts, WP3 was originally called “Hydrological modelling, flooding, erosion, water scarcity and water abstraction”. However, at the TWINLATIN kick-off meeting it was agreed that some of these issues resided more appropriately in WP6 and WP8, and so WP3 was renamed to focus on hydrological modelling and hydrological extremes. The specific objectives of WP3 as set out in the Description of Work are

    Betulin-related esters from birch bark tar: Identification, origin and archaeological significance

    Get PDF
    Birch bark tar, an organic material frequently encountered during archaeological excavations, has been identified from its lipid composition on the cracks of a ceramic dated to the late Neolithic. Lipids of this black substance were dominated by a characteristic triterpenoid assemblage of lupane-related triterpenoids from birch bark together with their thermal degradation products formed during preparation of the tar. Among the latter, four main series of unusual triterpenoid esters have been detected and were postulated to correspond to esters of Delta2-betulin and Delta2-dihydrobetulin based on their mass spectra and hydrolysis experiments. Their conclusive identification has been achieved by synthesis of reference compounds. These compounds most likely originate from the esterification between triterpenoid alcohols related to betulin and fatty acids from suberin formed upon heating of birch bark tar. They could be considered as markers of intense heating during birch bark tar preparation using the “single pot“ procedure

    Whole genome microarray data of chronic wound debridement prior to application of dermal skin substitutes

    Get PDF
    Clinical consensus is that debridement is necessary for successful application of dermal skin substitutes (DSS) to chronic wounds. The aim here was to identify commonly expressed genes associated with wound healing in untreated acute wounds and chronic wounds treated with wound debridement followed by DSS. Cutaneous biopsies were taken at two time points from untreated acute and chronic wounds and from chronic wounds treated with DSS following debridement. Microarray analysis identified significant differences (
    • …
    corecore