1,374 research outputs found

    The role of aversiveness in the relationship between intolerance of uncertainty and inflexible avoidance

    Get PDF
    The study of avoidance behaviour is considered relevant to improve our understanding of anxiety disorders, which are commonly characterized by the presence of undue avoidance behaviours. Flores et al. (2018) found evidence that Prospective Intolerance of Uncertainty (P-IU) is associated with inflexible avoidance behaviour. Specifically, healthy participants learned in a free-operant discriminative task to avoid an aversive sound, and were tested in extinction to measure the sensitivity of avoidance responses to the devaluation of the sound aversiveness. The results showed that an increase in P-IU was positively associated with insensitivity to outcome devaluation. This association was still significant even when trait anxiety was controlled for. These results suggested that PIU may be a vulnerability factor for inflexible avoidance. However, in a recent replication, we found that the relationship between P-IU and inflexible avoidance was moderated by the participants ratings of outcome aversiveness. Specifically, the significant association between PIU and insensitivity to outcome devaluation was found to be conditional upon high aversiveness ratings.Universidad de Málaga. Campus de Excelencia Internacional Andalucía Tech. Ministerio de Economía y Competitividad, proyecto I+D+i PSI2014-56061. Marie Curie International Outgoing Fellowship within the 7th European Community Framework Programme. Plan Propio de Investigación de la Universidad de Málaga, Programa de Fortalecimiento de las Capacidades en I+D+I en las Universidades 2014-20150, Fondos FEDER

    An approximation to the prediction of the summery emergence of "Ochlerotatus caspius" (Diptera: Culicidae) based on the relationship between degree-days accumulations and adult captures

    Get PDF
    Ochlerotatus caspius (Pallas) (Diptera, Culicidae) es el culícido más abundante durante el verano en las marismas de Huelva. Este estudio demuestra que la relación entre capturas de adultos, convertidas en probit, y la acumulación de temperatura o número de días-grado, convenientemente adaptada mediante a una transformación logarítmica, muestra ser signifi cativamente lineal para cada generación de este mosquito a lo largo de cada verano. Además, si se procesan todos los datos disponibles de todos los años considerados en el estudio se obtiene una alta correlación lineal y, en consecuencia, las ecuaciones resultantes poseen valor predictivo. Los resultados de la validación de los pronósticos que se extraen de las rectas de regresión log-probit, permiten que se puedan considerar estas rectas como una herramienta más de cara a aumentar la efi cacia de los programas de control integrado que se llevan a cabo en esta zona.Predicción de la emergencia estival de Ochlerotatus caspius (Diptera: Culicidae) basada en la relación entre la acumulación de días-grado y la captura de adultos. Ochlerotatus caspius (Pallas) (Diptera, Culicidae) es el culícido más abundante durante el verano en las marismas de Huelva. Este estudio demuestra que la relación entre capturas de adultos, convertidas en probit, y la acumulación de temperatura o número de días-grado, convenientemente adaptada mediante a una transformación logarítmica, muestra ser signifi cativamente lineal para cada generación de este mosquito a lo largo de cada verano. Además, si se procesan todos los datos disponibles de todos los años considerados en el estudio se obtiene una alta correlación lineal y, en consecuencia, las ecuaciones resultantes poseen valor predictivo. Los resultados de la validación de los pronósticos que se extraen de las rectas de regresión log-probit, permiten que se puedan considerar estas rectas como una herramienta más de cara a aumentar la efi cacia de los programas de control integrado que se llevan a cabo en esta zona

    Cristiano de Amberes, pintor de Felipe II: algunos datos documentales

    Get PDF
    Las necesidades representativas y decorativas de la Corte de Felipe II motivan los servicios de una amplia nómina de artífices adscritos a la Casa del Príncipe Felipe y, más tarde, a la del Monarca. Cristiano de Amberes, pintor flamenco y vecino de la villa de Madrid, desarrolla su oficio en este contexto desde 1547 hasta su muerte en 1580 en calidad de Pintor de Su Majestad en la Caballeriza de la Casa de Borgoña. Aportamos aquí algunos datos que permiten esclarecer su trayectoria vital y artística.Representative and decorative needs of the Court of Philip II motivates the services of an extensive list of architects assigned to the Casa del Príncipe Felipe and, later, to the monarch. Cristiano de Amberes, Flemish painter and resident of the town of Madrid, developed his craft in this context from 1547 until his death in 1580 as Artist of His Majesty in the Caballeriza of the Casa de Borgoña. We provide here some information that sheds light on your life and artistic career

    Visitas de Don Francisco de Luzón, gobernador de la provincia de Castilla, a las obras reales de Aranjuez, el Alcázar de Madrid y la Casa Real de El Pardo (1548-1549)

    Get PDF
    Las visitas que, entre 1548 y 1549, realizara Francisco de Luzón, Gobernador de la Provincia de Castilla, a las obras de Aranjuez, Alcázar de Madrid y Casa de El Pardo por encargo del Consejo de la Cámara de Castilla, se enmarcan en el nuevo interés personal mostrado por el Príncipe Felipe hacia las construcciones de la Corona. Por otra parte, las requisitorias e informes resultantes de estas visitas suministran datos importantes, no sólo en lo relativo al estado en que por entonces se hallaban estas Obras - aspecto conocido desde hace años -, sino también respecto a las medidas correctoras que habrían de ser adoptadas para una mejor organización administrativa y financiera en el gobierno de estas fábricas.The visits that, between 1548 and 1549, were carried out by Francisco de Luzón, governor of the Province of Castilla to Aranjuez's works, Alcázar de Madrid and Casa de El Pardo, by request of the Consejo de la Cámara de Castilla, are enclosed in the new personal interest showed by Principe Felipe to the Crown's works. On the other hand, the demands and reports resultant of these visits give us fundamental data, not only regarding at the condition of these works in that moment -this point of view was known some years ago-, but also the corrective measures that were to be adopted for a better administrative and financial organization in the management of these works

    El príncipe Maximiliano de Austria y el proyecto de navegabilidad del río Pisuerga (1549-1550)

    Get PDF
    Entre 1549 y 1550, durante el período de la Regencia en España de los Reyes de Bohemia, Maximiliano y María, tuvo lugar la concepción y puesta en práctica -luego no realizada- de un conocido proyecto de navegabilidad del río Pisuerga desde la localidad palentina de Aguilar de Campoo hasta la ciudad de Valladolid, con la intervención de ciertos ingenieros alemanes. El aporte de nuevos documentos en relación a este proyecto confirma el interés personal de Maximiliano en el mismo, así como reordenar las circunstancias que acompañaron su desarrollo.Between 1549 and 1550, during the period of the Regency in Spain of the Kings of Bohemia, Maximilian and Mary, took place the design and implementation -certainly not done- a project of navigability of the river Pisuerga from the town of Aguilar de Campoo (Palencia) to the city of Valladolid, with the involvement of certain German engineers. The contribution of new documents relating to this project confirms Maximilian's personal interest in it, and rearrange the time the circumstances surrounding its development

    La cripta e iglesia de Santa Leocadia y la fábrica del Alcázar de Toledo en el siglo XVI

    Get PDF
    Las reformas realizadas en el Alcázar de Toledo por iniciativa de Carlos V a partir de 1542 y continuadas por Felipe II, mantienen, en parte, un carácter conservacionista en relación a la antigua disposición y estructura medievales, a excepción, entre otras zonas, de la fachada principal (zona norte) y el "cuarto de Mediodía", siendo éste último proyectado como principal del edificio. El hallazgo de ciertos documentos relativos a la obra de este Cuarto permite una mejor comprensión del proceso edificatorio del Alcázar, a la hora de clarificar los aspectos medievales del edificio que permanecen y los que resultan transformados por las nuevas necesidades propias del mundo renacentista.The reforms made to the Alcázar de Toledo, initiated by Carlos V from 1542 and continued by Felipe II, respects, to a certain degree, its old medieval layout and structure, except, among other areas, the main façade (north area) and the cuarto de Mediodía, which became the main part of the building. The discovery of certain documents related to the construction of the cuarto, allows a better understanding of the building process of the Alcázar, when clarifying which of the medieval aspects of the original building remain and which were transformed due to the new demands of the Renaissance world

    Estimates of the likelihood of threats are related to intolerance of uncertainty and learning

    Get PDF
    In the present experiment, we assessed the relationship between intolerance of uncertainty and expectancy ratings of threats both in the presence of conditioned stimuli (CS) that signalled the delivery of an aversive unconditioned stimulus (US), and after making an avoidance response. Participants learned the relationship between several pictures serving as CSs and an aversive sound serving as the US, and learned to avoid the US through a procedure including alternating pavlovian and negative reinforcement training phases. Expectancy ratings were measured on every training trial. Our results only showed a significant association between intolerance of uncertainty and expectancy ratings made after avoidance responses. This association was found only when the avoidance response was made in the presence of CSs signalling that the aversive sound was avoidable. The increase in intolerance of uncertainty was related to lower expectancy ratings in good learners, and to higher expectancy ratings in bad learners. These results are tentatively explained by invoking a view of intolerance of uncertainty as an exaggerated reaction to uncertainty aimed at learning to avoid threats.Universidad de Málaga. Campus de Excelencia Internacional Andalucía Tech. Ministerio de Ciencia y Competitividad. Proyecto Nacional I+D+i. PSI2014-56061

    La parroquia de San Miguel de Sagra y San Gil de Madrid en el siglo XVI. Aportaciones documentales

    Get PDF
    A number of unpublished documents relating to the former parish of San Miguel de Sagra and San Gil, located very close to the main entrance of the Alcazar of Madrid, and its subsequent demolition and relocation in 1548 with a new building on the southeast side of the Palace, gives insight into an urban project long matured and resulted in the formation of an open and regularized, emblematic and representative space, which was the square in front of the main entrance of the Palace.Una serie de documentos inéditos relativos a la antigua parroquia de San Miguel de Sagra y San Gil, localizada muy próxima a la entrada principal del Alcázar de Madrid, así como su posterior derribo y traslado en 1548 con nuevo edificio en el lado suroriental del Palacio, permite profundizar en un proyecto urbano largo tiempo madurado y culminado en la conformación de un espacio abierto y regularizado, emblemático y representativo, que resultó ser la plaza situada frente a la portada principal del Alcázar
    corecore