3 research outputs found

    The impact of design approach and contracting practices on cost and execution period of school buildings

    Get PDF
    More than two million school-age children in Yemen are unable to enroll in education because of a shortage of school buildings. This is one of the reasons the country missed the Millennium Development Goal of achieving Education for all by 2015. The struggle to afford school accommodation will continue, because of the lack of resources and high unit cost. Construction cost as time schedule for an identical school building vary by the implementing agency. This paper aims to study in-depth this multi-dimensional issue to find out the factors that lead to this variation, as well as the reasons for the high unit cost and lengthy periods of construction. To achieve this objective, comprehensive raw data that was resourced from agencies that are assigned to implement the largest part of the construction program along with data collected through questionnaires and semi-structured interviews were utilized. Complete sets of design and contracting documents of representative schools were used for deeper analysis and evaluation. The analysis shows that the employed design approaches lead to large structural elements and consequently to longer implementation period and 30% increase in cost. It also shows that contractors add up to 20% for the client’s procurement procedure, approvals, and payment cycle. Additionally, bidders price risks related to accessibility to building sites, availability of building materials, and how trouble-prone is the region. The findings are of relevance to researchers, education planners, and practitioners as they are of high importance to policy makers and financiers whose main concern is to meet the growing need for school accommodation

    Evaluation of performance-based earthquake engineering in Yemen

    Get PDF
    Building codes follow a common concept in designing buildings to achieve an acceptable seismic performance. The objective underlying the concept is to ensure that the buildings should be able to resist minor earthquake without damage, resist moderate earthquake with some non-structural damage, and resist major earthquakes without collapse, but some structural as well as non-structural damage. This study aims to evaluate the performance-based seismic to come up with necessary recommendations for both future practices, essential review, and restoration of existing structures in Yemen. To do this real case studies incorporated, and nonlinear pushover analysis is carried out. The analysis results presented and then assessed to find out the conformity with the required performance. The structural sections assumed at the beginning of the design, then the design repeated many times to achieve the selected performance criteria (the plastic hinge properties and the maximum displacement)
    corecore