Solving the Resource Constrained Project Scheduling Problem with Generalized Precedences by Lazy Clause Generation
The technical report presents a generic exact solution approach for
minimizing the project duration of the resource-constrained project scheduling
problem with generalized precedences (Rcpsp/max). The approach uses lazy clause
generation, i.e., a hybrid of finite domain and Boolean satisfiability solving,
in order to apply nogood learning and conflict-driven search on the solution
generation. Our experiments show the benefit of lazy clause generation for
finding an optimal solutions and proving its optimality in comparison to other
state-of-the-art exact and non-exact methods. The method is highly robust: it
matched or bettered the best known results on all of the 2340 instances we
examined except 3, according to the currently available data on the PSPLib. Of
the 631 open instances in this set it closed 573 and improved the bounds of 51
of the remaining 58 instances.Comment: 37 pages, 3 figures, 16 table
Understanding Algorithm Performance on an Oversubscribed Scheduling Application
The best performing algorithms for a particular oversubscribed scheduling
application, Air Force Satellite Control Network (AFSCN) scheduling, appear to
have little in common. Yet, through careful experimentation and modeling of
performance in real problem instances, we can relate characteristics of the
best algorithms to characteristics of the application. In particular, we find
that plateaus dominate the search spaces (thus favoring algorithms that make
larger changes to solutions) and that some randomization in exploration is
critical to good performance (due to the lack of gradient information on the
plateaus). Based on our explanations of algorithm performance, we develop a new
algorithm that combines characteristics of the best performers; the new
algorithms performance is better than the previous best. We show how hypothesis
driven experimentation and search modeling can both explain algorithm
performance and motivate the design of a new algorithm
Resource-constrained project scheduling for timely project completion with stochastic activity durations.
We investigate resource-constrained project scheduling with stochastic activity durations. Various objective functions related to timely project completion are examined, as well as the correlation between these objectives. We develop a GRASP-heuristic to produce high-quality solutions, using so-called descriptive sampling. The algorithm outperforms other existing algorithms for expected-makespan minimization. The distribution of the possible makespan realizations for a given scheduling policy is studied, and problem difficulty is explored as a function of problem parameters.GRASP; Project scheduling; Uncertainty;
Multi-Objective Multi-mode Time-Cost Tradeoff modeling in Construction Projects Considering Productivity Improvement
In today's construction industry, poor performance often arises due to
various factors related to time, finances, and quality. These factors
frequently lead to project delays and resource losses, particularly in terms of
financial resources. This research addresses the Multimode Resource-Constrained
Project Scheduling Problem (MRCPSP), a real-world challenge that takes into
account the time value of money and project payment planning. In this context,
project activities exhibit discrete cost profiles under different execution
conditions and can be carried out in multiple ways. This paper aims to achieve
two primary objectives: minimizing the net present value of project costs and
project completion times while simultaneously improving the project's
productivity index. To accomplish this, a mathematical programming model based
on certain assumptions is proposed. Several test cases are designed, and they
are rigorously evaluated using the methodology outlined in this paper to
validate the modeling approach. Recognizing the NP-hard nature of this problem,
a multi-objective genetic algorithm capable of solving large-scale instances is
developed. Finally, the effectiveness of the proposed solution is assessed by
comparing it to the performance of the NSGA-II algorithm using well-established
efficiency metrics. Results demonstrate the superior performance of the
algorithm introduced in this study.Comment: 40 pages, 20 figures, 7 table
Recommended from our members
Resource constrained routing and scheduling: Review and research prospects
In the service industry, it is crucial to efficiently allocate scarce resources to perform tasks and meet particular service requirements. What considerably complicates matters is when these resources, for example skilled technicians, nurses, and home carers have to visit different customer locations. This paper provides a comprehensive survey on resource constrained routing and scheduling that unveils the problem characteristics with respect to resource qualifications, service requirements and problem objectives. It also identifies the most effective exact and heuristic algorithms for this class of problems. The paper closes with several research prospects
Working Notes from the 1992 AAAI Spring Symposium on Practical Approaches to Scheduling and Planning
The symposium presented issues involved in the development of scheduling systems that can deal with resource and time limitations. To qualify, a system must be implemented and tested to some degree on non-trivial problems (ideally, on real-world problems). However, a system need not be fully deployed to qualify. Systems that schedule actions in terms of metric time constraints typically represent and reason about an external numeric clock or calendar and can be contrasted with those systems that represent time purely symbolically. The following topics are discussed: integrating planning and scheduling; integrating symbolic goals and numerical utilities; managing uncertainty; incremental rescheduling; managing limited computation time; anytime scheduling and planning algorithms, systems; dependency analysis and schedule reuse; management of schedule and plan execution; and incorporation of discrete event techniques
A biased random-key genetic algorithm with forward-backward improvement for the resource constrained project scheduling problem
This paper presents a biased random-key genetic algorithm for the resource constrained project scheduling problem. The chromosome representation of the problem is based on random keys. Active schedules are constructed using a priority-rule heuristic in which the priorities of the activities are defined by the genetic algorithm. A forward-backward improvement procedure is applied to all solutions. The chromosomes supplied by the genetic algorithm are adjusted to reflect the solutions obtained by the improvement procedure. The heuristic is tested on a set of standard problems taken from the literature and compared with other approaches. The computational results validate the effectiveness of the proposed algorithm
- …