6,874 research outputs found

    Combining Multi-Criteria Decision Making (MCDM) Methods with Building Information Modelling (BIM): A Review

    Get PDF
    Integrating building information to support decision-making has been a key challenge in the Architecture, Engineering, and Construction (AEC) industry. The synergy of Building Information Modelling (BIM) and Multi-Criteria Decision Making (MCDM) is expected to improve information integration and decision-making. The aim of this paper is to identify strategies to improve the synergy between MCDM and BIM. From the earliest literature (2009) to the present, this study examines 45 articles combining MCDM with BIM. We find that the five major application domains are sustainability, retrofit, supplier selection, safety, and constructability. Five established strategies for improving the synergy between MCDM and BIM were discussed and can be used as a benchmark for evaluating the application of decision techniques in practice. This study points out gaps of combining MCDM and BIM in the current literature. It also sheds new light into combining MCDM with BIM for practitioners, as to promote integrated decision-making

    Enhancing the collaboration of earthquake engineering research infrastructures

    Get PDF
    Towards stronger international collaboration of earthquake engineering research infrastructures International collaboration and mobility of researchers is a means for maximising the efficiency of use of research infrastructures. The European infrastructures are committed to widen joint research and access to their facilities. This is relevant to European framework for research and innovation, the single market and the competitiveness of the construction industry.JRC.G.4-European laboratory for structural assessmen

    Annual Report, 2015-2016

    Get PDF

    NASA SBIR abstracts of 1991 phase 1 projects

    Get PDF
    The objectives of 301 projects placed under contract by the Small Business Innovation Research (SBIR) program of the National Aeronautics and Space Administration (NASA) are described. These projects were selected competitively from among proposals submitted to NASA in response to the 1991 SBIR Program Solicitation. The basic document consists of edited, non-proprietary abstracts of the winning proposals submitted by small businesses. The abstracts are presented under the 15 technical topics within which Phase 1 proposals were solicited. Each project was assigned a sequential identifying number from 001 to 301, in order of its appearance in the body of the report. Appendixes to provide additional information about the SBIR program and permit cross-reference of the 1991 Phase 1 projects by company name, location by state, principal investigator, NASA Field Center responsible for management of each project, and NASA contract number are included
    corecore