305 research outputs found
A survey of scheduling problems with setup times or costs
Author name used in this publication: C. T. NgAuthor name used in this publication: T. C. E. Cheng2007-2008 > Academic research: refereed > Publication in refereed journalAccepted ManuscriptPublishe
Multicriteria hybrid flow shop scheduling problem: literature review, analysis, and future research
This research focuses on the Hybrid Flow Shop production scheduling problem, which is one of the most difficult problems to solve. The literature points to several studies that focus the Hybrid Flow Shop scheduling problem with monocriteria functions. Despite of the fact that, many real world problems involve several objective functions, they can often compete and conflict, leading researchers to concentrate direct their efforts on the development of methods that take consider this variant into consideration. The goal of the study is to review and analyze the methods in order to solve the Hybrid Flow Shop production scheduling problem with multicriteria functions in the literature. The analyses were performed using several papers that have been published over the years, also the parallel machines types, the approach used to develop solution methods, the type of method develop, the objective function, the performance criterion adopted, and the additional constraints considered. The results of the reviewing and analysis of 46 papers showed opportunities for future researchon this topic, including the following: (i) use uniform and dedicated parallel machines, (ii) use exact and metaheuristics approaches, (iv) develop lower and uppers bounds, relations of dominance and different search strategiesto improve the computational time of the exact methods, (v) develop other types of metaheuristic, (vi) work with anticipatory setups, and (vii) add constraints faced by the production systems itself
An estimation of distribution algorithm for combinatorial optimization problems
This paper considers solving more than one combinatorial problem considered some of the most difficult to solve in the combinatorial optimization field, such as the job shop scheduling problem (JSSP), the vehicle routing problem with time windows (VRPTW), and the quay crane scheduling problem (QCSP). A hybrid metaheuristic algorithm that integrates the Mallows model and the Moth-flame algorithm solves these problems. Through an exponential function, the Mallows model emulates the solution space distribution for the problems; meanwhile, the Moth-flame algorithm is in charge of determining how to produce the offspring by a geometric function that helps identify the new solutions. The proposed metaheuristic, called HEDAMMF (Hybrid Estimation of Distribution Algorithm with Mallows model and Moth-Flame algorithm), improves the performance of recent algorithms. Although knowing the algebra of permutations is required to understand the proposed metaheuristic, utilizing the HEDAMMF is justified because certain problems are fixed differently under different circumstances. These problems do not share the same objective function (fitness) and/or the same constraints. Therefore, it is not possible to use a single model problem. The aforementioned approach is able to outperform recent algorithms under different metrics for these three combinatorial problems. Finally, it is possible to conclude that the hybrid metaheuristics have a better performance, or equal in effectiveness than recent algorithms
A Pareto-Based Adaptive Variable Neighborhood Search for Biobjective Hybrid Flow Shop Scheduling Problem with Sequence-Dependent Setup Time
Different from most researches focused on the single objective hybrid flowshop scheduling (HFS) problem, this paper investigates a biobjective HFS problem with sequence dependent setup time. The two objectives are the minimization of total weighted tardiness and the total setup time. To efficiently solve this problem, a Pareto-based adaptive biobjective variable neighborhood search (PABOVNS) is developed. In the proposed PABOVNS, a solution is denoted as a sequence of all jobs and a decoding procedure is presented to obtain the corresponding complete schedule. In addition, the proposed PABOVNS has three major features that can guarantee a good balance of exploration and exploitation. First, an adaptive selection strategy of neighborhoods is proposed to automatically select the most promising neighborhood instead of the sequential selection strategy of canonical VNS. Second, a two phase multiobjective local search based on neighborhood search and path relinking is designed for each selected neighborhood. Third, an external archive with diversity maintenance is adopted to store the nondominated solutions and at the same time provide initial solutions for the local search. Computational results based on randomly generated instances show that the PABOVNS is efficient and even superior to some other powerful multiobjective algorithms in the literature
Aproximações heurísticas para um problema de escalonamento do tipo flexible job-shop
Mestrado em Engenharia e Gestão IndustrialEste trabalho aborda um novo tipo de problema de escalonamento que pode ser encontrado em várias aplicações do mundo-real, principalmente na indústria transformadora. Em relação à configuração do shop floor, o problema pode ser classificado como flexible job-shop, onde os trabalhos podem ter diferentes rotas ao longo dos recursos e as suas operações têm um conjunto de recursos onde podem ser realizadas. Outras características de processamento abordadas são: datas possíveis de início, restrições de precedência (entre operações de um mesmo trabalho ou entre diferentes trabalhos), capacidade dos recursos (incluindo paragens, alterações na capacidade e capacidade infinita) e tempos de setup (que podem ser dependentes ou independentes da sequência). O objetivo é minimizar o número total de trabalhos atrasados.
Para resolver o novo problema de escalonamento proposto um modelo de programação linear inteira mista é apresentado e novas abordagens heurísticas são propostas.
Duas heurísticas construtivas, cinco heurísticas de melhoramento e duas metaheurísticas são propostas. As heurísticas construtivas são baseadas em regras de ordenação simples, onde as principais diferenças entre elas dizem respeito às regras de ordenação utilizadas e à forma de atribuir os recursos às operações. Os métodos são designados de job-by-job (JBJ), operation-by-operation (OBO) e resource-by-resource (RBR). Dentro das heurísticas de melhoramento, a reassign e a external exchange visam alterar a atribuição dos recursos, a internal exchange e a swap pretendem alterar a sequência de operações e a reinsert-reassign é focada em mudar, simultaneamente, ambas as partes. Algumas das heurísticas propostas são usadas em metaheurísticas, nomeadamente a greedy randomized adaptive search procedure (GRASP) e a iterated local search (ILS).
Para avaliar estas abordagens, é proposto um novo conjunto de instâncias adaptadas de problemas de escalonamento gerais do tipo flexible job-shop. De todos os métodos, o que apresenta os melhores resultados é o ILS-OBO obtendo melhores valores médios de gaps em tempos médios inferiores a 3 minutos.This work addresses a new type of scheduling problem which can be found in several real-world applications, mostly in manufacturing. Regarding shop floor configuration, the problem can be classified as flexible job-shop, where jobs can have different routes passing through resources and their operations have a set of eligible resources in which they can be performed. The processing characteristics addressed are release dates, precedence constraints (either between operations of the same job or between different jobs), resources capacity (including downtimes, changes in capacity, and infinite capacity), and setup times, which can be sequence-dependent or sequence-independent. The objective is to minimise the total number of tardy jobs.
To tackle the newly proposed flexible job-shop scheduling problem (FJSP), a mixed integer linear programming model (MILP) is presented and new heuristic approaches are put forward.
Three constructive heuristics, five improvement heuristics, and two metaheuristics are proposed. The constructive heuristics are based on simple dispatching rules, where the main differences among them concern the used dispatching rules and the way resources are assigned. The methods are named job-by-job (JBJ), operation-by-operation (OBO) and resource-by-resource (RBR). Within improvement heuristics, reassign and external exchange aim to change the resources assignment, internal exchange and swap intend changing the operations sequence, and reinsert-reassign is focused in simultaneously changing both parts. Some of the proposed heuristics are used within metaheuristic frameworks, namely greedy randomized adaptive search procedure (GRASP) and iterative local search (ILS).
In order to evaluate these approaches, a new set of benchmark instances adapted from the general FJSP is proposed. Out of all methods, the one which shows the best average results is ILS-OBO obtaining the best average gap values in average times lower than 3 minutes
The Distributed and Assembly Scheduling Problem
Tesis por compendio[EN] Nowadays, manufacturing systems meet different new global challenges and
the existence of a collaborative manufacturing environment is essential to face
with. Distributed manufacturing and assembly systems are two manufacturing
systems which allow industries to deal with some of these challenges. This
thesis studies a production problem in which both distributed manufacturing
and assembly systems are considered. Although distributed manufacturing
systems and assembly systems are well-known problems and have been extensively
studied in the literature, to the best of our knowledge, considering
these two systems together as in this thesis is the first effort in the literature.
Due to the importance of scheduling optimization on production performance,
some different ways to optimize the scheduling of the considered problem are
discussed in this thesis.
The studied scheduling setting consists of two stages: A production and an
assembly stage. Various production centers make the first stage. Each of these
centers consists of several machines which are dedicated to manufacture jobs.
A single assembly machine is considered for the second stage. The produced
jobs are assembled on the assembly machine to form final products through a
defined assembly program.
In this thesis, two different problems regarding two different production
configurations for the production centers of the first stage are considered.
The first configuration is a flowshop that results in what we refer to as the
Distributed Assembly Permutation Flowshop Scheduling Problem (DAPFSP).
The second problem is referred to as the Distributed Parallel Machine and
Assembly Scheduling Problem (DPMASP), where unrelated parallel machines
configure the production centers. Makespan minimization of the product on the
assembly machine located in the assembly stage is considered as the objective
function for all considered problems.
In this thesis some extensions are considered for the studied problems
so as to bring them as close as possible to the reality of production shops.
In the DAPFSP, sequence dependent setup times are added for machines in
both production and assembly stages. Similarly, in the DPMASP, due to
technological constraints, some defined jobs can be processed only in certain
factories.
Mathematical models are presented as an exact solution for some of the
presented problems and two state-of-art solvers, CPLEX and GUROBI are
used to solve them. Since these solvers are not able to solve large sized
problems, we design and develop heuristic methods to solve the problems. In
addition to heuristics, some metaheuristics are also designed and proposed to
improve the solutions obtained by heuristics. Finally, for each proposed problem,
the performance of the proposed solution methods is compared through
extensive computational and comprehensive ANOVA statistical analysis.[ES] Los sistemas de producción se enfrentan a retos globales en los que el concepto
de fabricación colaborativa es crucial para poder tener éxito en el entorno
cambiante y complejo en el que nos encontramos. Una característica de los sistemas
productivos que puede ayudar a lograr este objetivo consiste en disponer
de una red de fabricación distribuida en la que los productos se fabriquen en
localizaciones diferentes y se vayan ensamblando para obtener el producto
final. En estos casos, disponer de modelos y herramientas para mejorar el
rendimiento de sistemas de producción distribuidos con ensamblajes es una
manera de asegurar la eficiencia de los mismos.
En esta tesis doctoral se estudian los sistemas de fabricación distribuidos
con operaciones de ensamblaje. Los sistemas distribuidos y los sistemas con
operaciones de ensamblaje han sido estudiados por separado en la literatura.
De hecho, no se han encontrado estudios de sistemas con ambas características
consideradas de forma conjunta.
Dada la complejidad de considerar conjuntamente ambos tipos de sistemas
a la hora de realizar la programación de la producción en los mismos, se ha
abordado su estudio considerando un modelo bietápico en la que en la primera
etapa se consideran las operaciones de producción y en la segunda se plantean
las operaciones de ensamblaje.
Dependiendo de la configuración de la primera etapa se han estudiado dos
variantes. En la primera variante se asume que la etapa de producción está
compuesta por sendos sistemas tipo flowshop en los que se fabrican los componentes
que se ensamblan en la segunda etapa (Distributed Assembly Permutation
Flowshop Scheduling Problem o DAPFSP). En la segunda variante
se considera un sistema de máquinas en paralelo no relacionadas (Distributed
Parallel Machine and Assembly Scheduling Problem o DPMASP). En ambas
variantes se optimiza la fecha de finalización del último trabajo secuenciado
(Cmax) y se contempla la posibilidad que existan tiempos de cambio (setup)
dependientes de la secuencia de trabajos fabricada. También, en el caso
DPMASP se estudia la posibilidad de prohibir o no el uso de determinadas
máquinas de la etapa de producción.
Se han desarrollado modelos matemáticos para resolver algunas de las
variantes anteriores. Estos modelos se han resuelto mediante los programas
CPLEX y GUROBI en aquellos casos que ha sido posible. Para las instancias
en los que el modelo matemático no ofrecía una solución al problema se han
desarrollado heurísticas y metaheurísticas para ello.
Todos los procedimientos anteriores han sido estudiados para determinar
el rendimiento de los diferentes algoritmos planteados. Para ello se ha realizado
un exhaustivo estudio computacional en el que se han aplicado técnicas
ANOVA.
Los resultados obtenidos en la tesis permiten avanzar en la comprensión
del comportamiento de los sistemas productivos distribuidos con ensamblajes,
definiendo algoritmos que permiten obtener buenas soluciones a este tipo de
problemas tan complejos que aparecen tantas veces en la realidad industrial.[CA] Els sistemes de producció s'enfronten a reptes globals en què el concepte de
fabricació col.laborativa és crucial per a poder tindre èxit en l'entorn canviant
i complex en què ens trobem. Una característica dels sistemes productius
que pot ajudar a aconseguir este objectiu consistix a disposar d'una xarxa de
fabricació distribuïda en la que els productes es fabriquen en localitzacions
diferents i es vagen acoblant per a obtindre el producte final. En estos casos,
disposar de models i ferramentes per a millorar el rendiment de sistemes de
producció distribuïts amb acoblaments és una manera d'assegurar l'eficiència
dels mateixos.
En esta tesi doctoral s'estudien els sistemes de fabricació distribuïts amb
operacions d'acoblament. Els sistemes distribuïts i els sistemes amb operacions
d'acoblament han sigut estudiats per separat en la literatura però, en allò
que es coneix, no s'han trobat estudis de sistemes amb ambdós característiques
conjuntament. Donada la complexitat de considerar conjuntament ambdós
tipus de sistemes a l'hora de realitzar la programació de la producció en els
mateixos, s'ha abordat el seu estudi considerant un model bietàpic en la que
en la primera etapa es consideren les operacions de producció i en la segona es
plantegen les operacions d'acoblament.
Depenent de la configuració de la primera etapa s'han estudiat dos variants.
En la primera variant s'assumix que l'etapa de producció està composta per
sengles sistemes tipus flowshop en els que es fabriquen els components que
s'acoblen en la segona etapa (Distributed Assembly Permutation Flowshop
Scheduling Problem o DAPFSP). En la segona variant es considera un sistema
de màquines en paral.lel no relacionades (Distributed Parallel Machine and
Assembly Scheduling Problem o DPMASP). En ambdós variants s'optimitza
la data de finalització de l'últim treball seqüenciat (Cmax) i es contempla la
possibilitat que existisquen temps de canvi (setup) dependents de la seqüència
de treballs fabricada. També, en el cas DPMASP s'estudia la possibilitat de
prohibir o no l'ús de determinades màquines de l'etapa de producció.
S'han desenvolupat models matemàtics per a resoldre algunes de les variants
anteriors. Estos models s'han resolt per mitjà dels programes CPLEX
i GUROBI en aquells casos que ha sigut possible. Per a les instàncies en
què el model matemàtic no oferia una solució al problema s'han desenrotllat
heurístiques i metaheurísticas per a això. Tots els procediments anteriors han
sigut estudiats per a determinar el rendiment dels diferents algoritmes plantejats.
Per a això s'ha realitzat un exhaustiu estudi computacional en què s'han
aplicat tècniques ANOVA.
Els resultats obtinguts en la tesi permeten avançar en la comprensió del
comportament dels sistemes productius distribuïts amb acoblaments, definint
algoritmes que permeten obtindre bones solucions a este tipus de problemes
tan complexos que apareixen tantes vegades en la realitat industrial.Hatami, S. (2016). The Distributed and Assembly Scheduling Problem [Tesis doctoral no publicada]. Universitat Politècnica de València. https://doi.org/10.4995/Thesis/10251/64072TESISCompendi
A Hybrid Estimation of Distribution Algorithm for Simulation-Based Scheduling in a Stochastic Permutation Flowshop
The permutation flowshop scheduling problem (PFSP) is NP-complete and tends to be more complicated when considering stochastic uncertainties in the real-world manufacturing environments. In this paper, a two-stage simulation-based hybrid estimation of distribution algorithm (TSSB-HEDA) is presented to schedule the permutation flowshop under stochastic processing times. To deal with processing time uncertainty, TSSB-HEDA evaluates candidate solutions using a novel two-stage simulation model (TSSM). This model first adopts the regression-based meta-modelling technique to determine a number of promising candidate solutions with less computation cost, and then uses a more accurate but time-consuming simulator to evaluate the performance of these selected ones. In addition, to avoid getting trapped into premature convergence, TSSB-HEDA employs both the probabilistic model of EDA and genetic operators of genetic algorithm (GA) to generate the offspring individuals. Enlightened by the weight training process of neural networks, a self-adaptive learning mechanism (SALM) is employed to dynamically adjust the ratio of offspring individuals generated by the probabilistic model. Computational experiments on Taillard’s benchmarks show that TSSB-HEDA is competitive in terms of both solution quality and computational performance
Algorithms and Methods for Designing and Scheduling Smart Manufacturing Systems
This book, as a Special Issue, is a collection of some of the latest advancements in designing and scheduling smart manufacturing systems. The smart manufacturing concept is undoubtedly considered a paradigm shift in manufacturing technology. This conception is part of the Industry 4.0 strategy, or equivalent national policies, and brings new challenges and opportunities for the companies that are facing tough global competition. Industry 4.0 should not only be perceived as one of many possible strategies for manufacturing companies, but also as an important practice within organizations. The main focus of Industry 4.0 implementation is to combine production, information technology, and the internet. The presented Special Issue consists of ten research papers presenting the latest works in the field. The papers include various topics, which can be divided into three categories—(i) designing and scheduling manufacturing systems (seven articles), (ii) machining process optimization (two articles), (iii) digital insurance platforms (one article). Most of the mentioned research problems are solved in these articles by using genetic algorithms, the harmony search algorithm, the hybrid bat algorithm, the combined whale optimization algorithm, and other optimization and decision-making methods. The above-mentioned groups of articles are briefly described in this order in this book
- …