    Probabilistic Balancing of Fault Coverage and Test Cost in Combined Built-In Self-Test/Automated Test Equipment Testing Environment

    Get PDF
    As design and test complexities of SoCs ever intensify, the balanced utilization of combined built-in self-test (BIST) and automated test equipment (ATE) testing becomes desirable to meet the required minimum-fault-coverage while maintaining an acceptable cost overhead. The cost associated with combined BIST/ATE testing of such systems mainly consists of 1) the cost induced by the BIST area overhead and 2) the cost induced by the overall testing time. In general, BIST is significantly faster than ATE, while it can provide only limited fault-coverage, and driving higher fault-coverage from BIST means additional area cost overhead. On the other hand, higher fault-coverage can be easily achieved from ATE, but excessive use of ATE results in additional test time. This paper proposes a novel probabilistic method to balance the fault-coverage and the test overhead costs in a combined BIST/ATE test environment. The proposed technique is then applied to two BIST/ATE test scenarios to find the optimal fault-coverage/cost combinations

    High Speed Test Interface Module Using MEMS Technology

    Get PDF
    With the transient frequency of available CMOS technologies exceeding hundreds of gigahertz and the increasing complexity of Integrated Circuit (IC) designs, it is now apparent that the architecture of current testers needs to be greatly improved to keep up with the formidable challenges ahead. Test requirements for modern integrated circuits are becoming more stringent, complex and costly. These requirements include an increasing number of test channels, higher test-speeds and enhanced measurement accuracy and resolution. In a conventional test configuration, the signal path from Automatic Test Equipment (ATE) to the Device-Under-Test (DUT) includes long traces of wires. At frequencies above a few gigahertz, testing integrated circuits becomes a challenging task. The effects on transmission lines become critical requiring impedance matching to minimize signal reflection. AC resistance due to the skin effect and electromagnetic coupling caused by radiation can also become important factors affecting the test results. In the design of a Device Interface Board (DIB), the greater the physical separation of the DUT and the ATE pin electronics, the greater the distortion and signal degradation. In this work, a new Test Interface Module (TIM) based on MEMS technology is proposed to reduce the distance between the tester and device-under-test by orders of magnitude. The proposed solution increases the bandwidth of test channels and reduces the undesired effects of transmission lines on the test results. The MEMS test interface includes a fixed socket and a removable socket. The removable socket incorporates MEMS contact springs to provide temporary with the DUT pads and the fixed socket contains a bed of micro-pins to establish electrical connections with the ATE pin electronics. The MEMS based contact springs have been modified to implement a high-density wafer level test probes for Through Silicon Vias (TSVs) in three dimensional integrated circuits (3D-IC). Prototypes have been fabricated using Silicon On Insulator SOI wafer. Experimental results indicate that the proposed architectures can operate up to 50 GHz without much loss or distortion. The MEMS probes can also maintain a good elastic performance without any damage or deformation in the test phase

    Cost modelling and concurrent engineering for testable design

    Get PDF
    This thesis was submitted for the degree of Doctor of Philosophy and awarded by Brunel University.As integrated circuits and printed circuit boards increase in complexity, testing becomes a major cost factor of the design and production of the complex devices. Testability has to be considered during the design of complex electronic systems, and automatic test systems have to be used in order to facilitate the test. This fact is now widely accepted in industry. Both design for testability and the usage of automatic test systems aim at reducing the cost of production testing or, sometimes, making it possible at all. Many design for testability methods and test systems are available which can be configured into a production test strategy, in order to achieve high quality of the final product. The designer has to select from the various options for creating a test strategy, by maximising the quality and minimising the total cost for the electronic system. This thesis presents a methodology for test strategy generation which is based on consideration of the economics during the life cycle of the electronic system. This methodology is a concurrent engineering approach which takes into account all effects of a test strategy on the electronic system during its life cycle by evaluating its related cost. This objective methodology is used in an original test strategy planning advisory system, which allows for test strategy planning for VLSI circuits as well as for digital electronic systems. The cost models which are used for evaluating the economics of test strategies are described in detail and the test strategy planning system is presented. A methodology for making decisions which are based on estimated costing data is presented. Results of using the cost models and the test strategy planning system for evaluating the economics of test strategies for selected industrial designs are presented

    Optimizing Test Pattern Generation Using Top-Off ATPG Methodology for Stuck–AT, Transition and Small Delay Defect Faults

    Get PDF
    The ever increasing complexity and size of digital circuits complemented by Deep Sub Micron (DSM) technology trends today pose challenges to the efficient Design For Test (DFT) methodologies. Innovation is required not only in designing the digital circuits, but also in automatic test pattern generation (ATPG) to ensure that the pattern set screens all the targeted faults while still complying with the Automatic Test Equipment (ATE) memory constraints. DSM technology trends push the requirements of ATPG to not only include the conventional static defects but also to include test patterns for dynamic defects. The current industry practices consider test pattern generation for transition faults to screen dynamic defects. It has been observed that just screening for transition faults alone is not sufficient in light of the continuing DSM technology trends. Shrinking technology nodes have pushed DFT engineers to include Small Delay Defect (SDD) test patterns in the production flow. The current industry standard ATPG tools are evolving and SDD ATPG is not the most economical option in terms of both test generation CPU time and pattern volume. New techniques must be explored in order to ensure that a quality test pattern set can be generated which includes patterns for stuck-at, transition and SDD faults, all the while ensuring that the pattern volume remains economical. This thesis explores the use of a “Top-Off” ATPG methodology to generate an optimal test pattern set which can effectively screen the required fault models while containing the pattern volume within a reasonable limit

    Agent Based Test and Repair of Distributed Systems

    Get PDF
    This article demonstrates how to use intelligent agents for testing and repairing a distributed system, whose elements may or may not have embedded BIST (Built-In Self-Test) and BISR (Built-In Self-Repair) facilities. Agents are software modules that perform monitoring, diagnosis and repair of the faults. They form together a society whose members communicate, set goals and solve tasks. An experimental solution is presented, and future developments of the proposed approach are explore

    Orbit transfer rocket engine integrated control and health monitoring system technology readiness assessment

    Get PDF
    The objectives of this task were to: (1) estimate the technology readiness of an integrated control and health monitoring (ICHM) system for the Aerojet 7500 lbF Orbit Transfer Vehicle engine preliminary design assuming space based operations; and (2) estimate the remaining cost to advance this technology to a NASA defined 'readiness level 6' by 1996 wherein the technology has been demonstrated with a system validation model in a simulated environment. The work was accomplished through the conduct of four subtasks. In subtask 1 the minimally required functions for the control and monitoring system was specified. The elements required to perform these functions were specified in Subtask 2. In Subtask 3, the technology readiness level of each element was assessed. Finally, in Subtask 4, the development cost and schedule requirements were estimated for bringing each element to 'readiness level 6'

    Design of On-Chip Self-Testing Signature Register

    Get PDF
    Over the last few years, scan test has turn out to be too expensive to implement for industry standard designs due to increasing test data volume and test time. The test cost of a chip is mainly governed by the resource utilization of Automatic Test Equipment (ATE). Also, it directly depends upon test time that includes time required to load test program, to apply test vectors and to analyze generated test response of the chip. An issue of test time and data volume is increasingly appealing designers to use on-chip test data compactors, either on input side or output side or both. Such techniques significantly address the former issues but have little hold over increasing number of input-outputs under test mode. Further, test pins on DUT are increasing over the generations. Thus, scan channels on test floor are falling short in number for placement of such ICs. To address issues discussed above, we introduce an on-chip self-testing signature register. It comprises a response compactor and a comparator. The compactor compacts large chunk of response data to a small test signature whereas the comparator compares this test signature with desired one. The overall test result for the design is generated on single output pin. Being no storage of test response is demanded, the considerable reduction in ATE memory can be observed. Also, with only single pin to be monitored for test result, the number of tester channels and compare edges on ATE side significantly reduce at the end of the test. This cuts down maintenance and usage cost of test floor and increases its life time. Furthermore reduction in test pins gives scope for DFT engineers to increase number of scan chains so as to further reduce test time