2,914 research outputs found

    Current issue in corporate waqf in Malaysia

    Get PDF
    Corporate waqf is still new for the contemporary Islamic studies in Malaysia. There are limited resources and guidance to explain about corporate waqf. The purposes of this study are to explore the issues, concept and development of corporate waqf. Current structure for corporate waqf also being explored as part of case studies. This paper provides several perspectives and suggestions to this issue. The methodology for this study is secondary data approach by using the data analysis from the related journal and paper. The subject for this study is Selangor Muamalat. This paper come out with the concept and development of the contemporary waqf focused on corporate waqf and there are five current issues identified in the contemporary waqf. Next, seven proposed action plans are suggested to cover the issues. Lastly, the structure of Selangor Muamalat is analyses by focusing on the management structure, financial and operational framework and the Shariah consideration towards Selangor Muamalat structure

    A particle swarm algorithm for inspection optimization in serial multi-stage processes

    Get PDF
    AbstractImplementing efficient inspection policies is much important for the organizations to reduce quality related costs. In this paper, a particle swarm optimization (PSO) algorithm is proposed to determine the optimal inspection policy in serial multi-stage processes. The policy consists of three decision parameters to be optimized; i.e. the stages in which inspection occurs, tolerance of inspection, and size of sample to inspect. Total inspection cost is adopted as the performance measure of the algorithm. A numerical example is investigated in two phases, i.e. fixed sample size and sample size as a decision parameter, to ensure the practicality and validity of the proposed PSO algorithm. It is shown that PSO gives better results in comparison with two other algorithms proposed by earlier works

    Production line: effect of different inspection station allocation under accepts reject inspection policy

    Get PDF
    Manufacturing system is one of the most important parts in any organization as it produces the output of the company which will generate the profit. It consists partly of the production line which plays the role as the centre of production to create the end product which could be half finished or the full product. It is a big problem for the company to determine which is the better arrangement and combination of the tools or machines available in this area of the organization as different combination will greatly impact the productivity of the production line together with the profit of the company. This research intend to analyze a new production line in a metal stamping company based on the complain from the company and try to explore the better layout or arrangement in the production line in reflect to the complained problem and constrain of the provided of accept the defect and repair inspection policy. The production line is first being analyzed in response to complain through computer simulation. After the problem had been identified, the researcher tried different alternatives in the attempt to seek for the better layout or arrangement in the production line. The effect of different inspection station allocation layout is then being evaluated in term of the production time. The research has resulted in the finding of the cause for the long production time in the factory which is the long inspection steps which consumed much of the production time. After a few alternatives have been explored in allocating the inspection station, it is obvious that the current approach of the production line is the better one. Even by reducing the number of inspection station, interesting enough, the production time does not seem to decrease but yet increased. This finding contradicts the normal thought of fewer stations means shorter time. This finding could be the founding basic in the future research regarding the allocation of the inspection station following certain provided policy. This is also very helpful in real life practice in company as to help them improve their production time. As for the time being, there is yet a research addressing this issue pertaining the given inspection policy

    Optimum Allocation of Inspection Stations in Multistage Manufacturing Processes by Using Max-Min Ant System

    Get PDF
    In multistage manufacturing processes it is common to locate inspection stations after some or all of the processing workstations. The purpose of the inspection is to reduce the total manufacturing cost, resulted from unidentified defective items being processed unnecessarily through subsequent manufacturing operations. This total cost is the sum of the costs of production, inspection and failures (during production and after shipment). Introducing inspection stations into a serial multistage manufacturing process, although constituting an additional cost, is expected to be a profitable course of action. Specifically, at some positions the associated inspection costs will be recovered from the benefits realised through the detection of defective items, before wasting additional cost by continuing to process them. In this research, a novel general cost modelling for allocating a limited number of inspection stations in serial multistage manufacturing processes is formulated. In allocation of inspection station (AOIS) problem, as the number of workstations increases, the number of inspection station allocation possibilities increases exponentially. To identify the appropriate approach for the AOIS problem, different optimisation methods are investigated. The MAX-MIN Ant System (MMAS) algorithm is proposed as a novel approach to explore AOIS in serial multistage manufacturing processes. MMAS is an ant colony optimisation algorithm that was designed originally to begin an explorative search phase and, subsequently, to make a slow transition to the intensive exploitation of the best solutions found during the search, by allowing only one ant to update the pheromone trails. Two novel heuristics information for the MMAS algorithm are created. The heuristic information for the MMAS algorithm is exploited as a novel means to guide ants to build reasonably good solutions from the very beginning of the search. To improve the performance of the MMAS algorithm, six local search methods which are well-known and suitable for the AOIS problem are used. Selecting relevant parameter values for the MMAS algorithm can have a great impact on the algorithm’s performance. As a result, a method for tuning the most influential parameter values for the MMAS algorithm is developed. The contribution of this research is, for the first time, a methodology using MMAS to solve the AOIS problem in serial multistage manufacturing processes has been developed. The methodology takes into account the constraints on inspection resources, in terms of a limited number of inspection stations. As a result, the total manufacturing cost of a product can be reduced, while maintaining the quality of the product. Four numerical experiments are conducted to assess the MMAS algorithm for the AOIS problem. The performance of the MMAS algorithm is compared with a number of other methods this includes the complete enumeration method (CEM), rule of thumb, a pure random search algorithm, particle swarm optimisation, simulated annealing and genetic algorithm. The experimental results show that the effectiveness of the MMAS algorithm lies in its considerably shorter execution time and robustness. Further, in certain conditions results obtained by the MMAS algorithm are identical to the CEM. In addition, the results show that applying local search to the MMAS algorithm has significantly improved the performance of the algorithm. Also the results demonstrate that it is essential to use heuristic information with the MMAS algorithm for the AOIS problem, in order to obtain a high quality solution. It was found that the main parameters of MMAS include the pheromone trail intensity, heuristic information and evaporation of pheromone are less sensitive within the specified range as the number of workstations is significantly increased

    A review on equipment protection and system protection relay in power system

    Get PDF
    Power system equipment is configured and connected together with multiple voltage levels in existing electrical power system. There are varieties of electrical equipment obtainable in the power system predominantly from generation side up to the distribution side. Consequently, appropriate protections must be apt to prevent inessential disturbances that lead to voltage instability, voltage collapse and sooner a total blackout took place in the power system. The understanding of each component on the system protection is critical. This is due to any abnormal condition and failure can be analyzed and solved effectively due to the rapid changing and development on the power system network. Therefore, the enhancement of power quality can be achieved by sheltering the equipment with protection relay in power system. Moreover, the design of a systematic network is crucial for the system protection itself. Several types of protective equipment and protection techniques are taken into consideration in this paper. Hence, the existing accessible types and methods of system protection in the power system network are reviewed

    A review on equipment protection and system protection relay in power system

    Get PDF
    Power system equipment is configured and connected together with multiple voltage levels in existing electrical power system. There are varieties of electrical equipment obtainable in the power system predominantly from generation side up to the distribution side. Consequently, appropriate protections must be apt to prevent inessential disturbances that lead to voltage instability, voltage collapse and sooner a total blackout took place in the power system. The understanding of each component on the system protection is critical. This is due to any abnormal condition and failure can be analyzed and solved effectively due to the rapid changing and development on the power system network. Therefore, the enhancement of power quality can be achieved by sheltering the equipment with protection relay in power system. Moreover, the design of a systematic network is crucial for the system protection itself. Several types of protective equipment and protection techniques are taken into consideration in this paper. Hence, the existing accessible types and methods of system protection in the power system network are reviewed

    Optimal Configuration of Inspection and Rework Stations in a Multistage Flexible Flowline

    Get PDF
    Inspection and rework are two important issues of quality control. In this research, an N-stage flowline is considered to make decisions on these two issues. When defective items are detected at the inspection station the items are either scrapped or reworked. A reworkable item may be repaired at the regular defect-creating workstation or at a dedicated off-line rework station. Two problems (end-of-line and multistage inspections) are considered here to deal with this situation. The end-of-line inspection (ELI) problem considers an inspection station located at the end of the line while the multistage inspection (MSI) problem deals with multiple in-line inspection stations that partition the flowline into multiple flexible lines. Models for unit cost of production are developed for both problems. The ELI problem is formulated for determining the best decision among alternative policies for dealing with defective items. For an MSI problem a unit cost function is developed for determining the number and locations of in-line inspection stations along with the alternative decisions on each type of defects. Both of the problems are formulated as fractional mixed-integer nonlinear programming (f-MINLP) to minimize the unit cost of production. After several transformations the f-MINLP becomes a mixed-integer linear programming (MILP) problem. A construction heuristic, coined as Inspection Station Assignment (ISA) heuristic is developed to determine a sub-optimal location of inspection and rework stations in order to achieve minimum unit cost of production. A hybrid of Ant-Colony Optimization-based metaheuristic (ACOR) and ISA is devised to efficiently solve large instances of MSI problems. Numerical examples are presented to show the solution procedure of ELI problems with branch and bound (B&B) method. Empirical studies on a production line with large number of workstations are presented to show the quality and efficiency of the solution processes involved in both ELI and MSI problems. Computational results present that the hybrid heuristic ISA+ACOR shows better performance in terms of solution quality and efficiency. These approaches are applicable to many discrete product manufacturing systems including garments industry

    A Robust Multi Response Surface Approach for Optimization of Multistage Processes

    Get PDF
    Purpose: In a multistage process, the final quality in the last stage not only depends on the quality of the task performed in that stage but also is dependent on the quality of the products and services in intermediate stages as well as the design parameters in each stage. One of the most efficient statistical approaches used to model the multistage problems is the response surface method (RSM). However, it is necessary to optimize each response in all stages so to achieve the best solution for the whole problem. Robust optimization can produce very accurate solutions in this case. Design/methodology/approach: In order to model a multistage problem, the RSM is often used by the researchers. A classical approach to estimate response surfaces is the ordinary least squares (OLS) method. However, this method is very sensitive to outliers. To overcome this drawback, some robust estimation methods have been presented in the literature. In optimization phase, the global criterion (GC) method is used to optimize the response surfaces estimated by the robust approach in a multistage problem. Findings: The results of a numerical study show that our proposed robust optimization approach, considering both the sum of square error (SSE) index in model estimation and also global criterion (GC) index in optimization phase, will perform better than the classical full information maximum likelihood (FIML) estimation method. Originality/value: To the best of the authors’ knowledge, there are few papers focusing on quality oriented designs in the multistage problem by means of RSM. Development of robust approaches for the response surface estimation and also optimization of the estimated response surfaces are the main novelties in this study. The proposed approach will produce more robust and accurate solutions for multistage problems rather than classical approaches

    Probabilistic structural mechanics research for parallel processing computers

    Get PDF
    Aerospace structures and spacecraft are a complex assemblage of structural components that are subjected to a variety of complex, cyclic, and transient loading conditions. Significant modeling uncertainties are present in these structures, in addition to the inherent randomness of material properties and loads. To properly account for these uncertainties in evaluating and assessing the reliability of these components and structures, probabilistic structural mechanics (PSM) procedures must be used. Much research has focused on basic theory development and the development of approximate analytic solution methods in random vibrations and structural reliability. Practical application of PSM methods was hampered by their computationally intense nature. Solution of PSM problems requires repeated analyses of structures that are often large, and exhibit nonlinear and/or dynamic response behavior. These methods are all inherently parallel and ideally suited to implementation on parallel processing computers. New hardware architectures and innovative control software and solution methodologies are needed to make solution of large scale PSM problems practical
    • …
    corecore