292 research outputs found

    Un Análisis de Viabilidad del proceso de gestión de proyectos del Estándar ISO/IEC 29110: Un Estudio de Caso en una Compañía Automotora Ecuatoriana

    Get PDF
    Software process standards such as the ISO/IEC 29110 have been implemented by Very Small Entities (VSE) in order to develop quality software and achieve improvements in terms of time, budget, documentation, and other subjects. The generic profile group established in such a standard includes a set of profiles with situational factors of occurrence applicable to some VSEs. However, documented case studies of the ISO/IEC 29110 implementation in Latin America companies are limited, causing uncertainty about the viability of such a standard in VSEs established in the region. Different conditions of each environment—company type, size, country, etc.—can influence the implementation of a software project. Such a fact can affect the possibility of quality improvement by using the standard. In this paper we aim to implement the project management process included in the basic profile of the ISO/IEC 29110 in an automotive Ecuadorian company. We intend to provide VSEs a preliminary judgment in terms of time and cost overruns when developing a first-time implementation of the project management process. Besides, we summarize a set of lessons learned acquired during such an implementation. Finally, the findings of this study will allow VSEs to decide whether is convenient to implement this standard in such an environment.Estándares de procesos de software tales como ISO/ IEC 29110 se implementan en organizaciones pequeñas (en inglés, Very Small Entities, VSE) con el fin de desarrollar software de calidad y lograr mejoras en términos de tiempo, presupuesto, documentación y otros campos. El grupo de perfiles genéricos establecido en dicha norma incluye un conjunto de perfiles con factores situacionales de ocurrencia aplicables a algunas VSEs. Sin embargo, los casos de estudio documentados sobre la implementación de ISO/IEC 29110 en empresas de América Latina son limitados, generando incertidumbre sobre la viabilidad de tal estándar en VSEs establecidas en la región. Las diferentes condiciones de cada entorno (tipo de empresa, tamaño, país, etc.) pueden influir en la implementación de un proyecto de software. Este hecho puede afectar la posibilidad de mejora de la calidad mediante el uso de la norma. En este estudio se pretende implementar el proceso de gestión de proyectos incluido en el perfil básico de la norma ISO/IEC 29110 en una empresa automotriz ecuatoriana. Se procura proporcionar a las VSEs un juicio preliminar en términos de tiempo y sobrecostos al desarrollar una implementación por primera vez del proceso de gestión de proyectos. Además, se resume un conjunto de lecciones aprendidas durante dicha implementación. Finalmente, los hallazgos de este estudio permitirán a las VSEs decidir si es conveniente implementar este estándar en dicho entorno

    Un Análisis de Viabilidad del proceso de gestión de proyectos del Estándar ISO/IEC 29110: Un Estudio de Caso en una Compañía Automotora Ecuatoriana

    Get PDF
    Software process standards such as the ISO/IEC 29110 have been implemented by Very Small Entities (VSE) in order to develop quality software and achieve improvements in terms of time, budget, documentation, and other subjects. The generic profile group established in such a standard includes a set of profiles with situational factors of occurrence applicable to some VSEs. However, documented case studies of the ISO/IEC 29110 implementation in Latin America companies are limited, causing uncertainty about the viability of such a standard in VSEs established in the region. Different conditions of each environment—company type, size, country, etc.—can influence the implementation of a software project. Such a fact can affect the possibility of quality improvement by using the standard. In this paper we aim to implement the project management process included in the basic profile of the ISO/IEC 29110 in an automotive Ecuadorian company. We intend to provide VSEs a preliminary judgment in terms of time and cost overruns when developing a first-time implementation of the project management process. Besides, we summarize a set of lessons learned acquired during such an implementation. Finally, the findings of this study will allow VSEs to decide whether is convenient to implement this standard in such an environment.Estándares de procesos de software tales como ISO/ IEC 29110 se implementan en organizaciones pequeñas (en inglés, Very Small Entities, VSE) con el fin de desarrollar software de calidad y lograr mejoras en términos de tiempo, presupuesto, documentación y otros campos. El grupo de perfiles genéricos establecido en dicha norma incluye un conjunto de perfiles con factores situacionales de ocurrencia aplicables a algunas VSEs. Sin embargo, los casos de estudio documentados sobre la implementación de ISO/IEC 29110 en empresas de América Latina son limitados, generando incertidumbre sobre la viabilidad de tal estándar en VSEs establecidas en la región. Las diferentes condiciones de cada entorno (tipo de empresa, tamaño, país, etc.) pueden influir en la implementación de un proyecto de software. Este hecho puede afectar la posibilidad de mejora de la calidad mediante el uso de la norma. En este estudio se pretende implementar el proceso de gestión de proyectos incluido en el perfil básico de la norma ISO/IEC 29110 en una empresa automotriz ecuatoriana. Se procura proporcionar a las VSEs un juicio preliminar en términos de tiempo y sobrecostos al desarrollar una implementación por primera vez del proceso de gestión de proyectos. Además, se resume un conjunto de lecciones aprendidas durante dicha implementación. Finalmente, los hallazgos de este estudio permitirán a las VSEs decidir si es conveniente implementar este estándar en dicho entorno

    E-Learning course for the development of competencies in the formulation of public investment projects using free software tools

    Get PDF
    El principal objetivo de este trabajo de tesis es el diseño del curso e-learning para la formulación de proyectos de inversión pública siguiendo las propuestas y documentación obtenidas por el Departamento Nacional de Planeación DNP, éste trabajo parte de una encuesta inicial a 216 funcionarios públicos sobre ambientes virtuales de aprendizaje, lo cual nos otorga los siguientes resultados: más del 50% han realizado y terminado cursos virtuales, un 70% de preferencia con tiempo de duración del curso menor a 3 semanas, más del 60% prefieren cursos gratuitos, a la pregunta, si conoce sobre inversión pública llama la atención, pues está cerca del 80% no conoce sobre inversión pública, algo que para la administración municipal es considerado “grave”, más aun cuando cerca de la tercera parte son menores a 30 años. Con base en estos resultados se diseña e implementa una prueba piloto con la herramienta de software libre Moodle, generando al final del curso resultados positivos a la hora de la presentación y radicación de proyectos de inversión al Banco de Proyectos del Departamento Administrativo de Planeación quien valida su correcta estructura e información. Se evidencia mediante esta prueba piloto que las opciones de utilización e implantación de Software libre garantizan igualdad de resultados que la contraparte de Software Privativo, más aun cuando el Software libre claramente tiene opciones positivas de modificación y personalización que permiten un desarrollo a la medida de las necesidades.Universitat Oberta de Catalunya UOCRESUMEN 7 ABSTRACT 8 INTRODUCCIÓN 9 1. ANTECEDENTES 10 2. ESTADO DEL ARTE 14 2.1 VENTAJAS EN LA UTILIZACIÓN DEL SOFTWARE 23 2.2 FILOSOFÍA DEL SOFTWARE LIBRE 24 3. MARCO TEORICO 26 3.1 EL SOFTWARE 26 3.2 CICLO DE VIDA DEL SOFTWARE 27 3.2 1 Modelo en Cascada. 29 3.2.2 Modelo en V. 29 3.2.3 Modelo iterativo. 29 3.2.4 Modelo incremental. 30 3.3 SOFTWARE EN LA EDUCACIÓN 31 3.4 PROYECTO 35 3.4.1 Proyectos de inversión. 36 3.4.2 Ciclo de un proyecto de inversión. 37 3.4.3 Matriz de marco lógico. 40 3.5 TEORÍA DE APRENDIZAJE 41 4. PLANTEAMIENTO DEL PROBLEMA Y JUSTIFICACION 47 5. OBJETIVOS 49 5.1 OBJETIVO GENERAL 49 5.2 OBJETIVOS ESPECÍFICOS 49 6. RESULTADOS 50 6.1 RESULTADOS ESPERADOS 50 6.2 RESULTADOS OBTENIDOS 50 7. APORTES DEL PROYECTO 54 8. MARCO METODOLOGÍCO 55 9. POBLACIÓN 56 10. DESCRIPCIÓN TÉCNICAS DE RECOLECCIÓN DE DATOS Y VARIABLES 57 11. ANALISIS DE RESULTADOS 60 12. ACTIVIDADES 65 13. CRONOGRAMA DE ACTIVIDADES 71 14. PRESUPUESTO 72 14.1 RECURSOS NECESARIOS 72 15. CONCLUSIONES 73 REFERENCIAS Y BIBLIOGRAFIA 74MaestríaThe main objective of this thesis work is the design of the e-learning course for the formulation of public investment projects following the proposals and documentation obtained by the DNP National Planning Department, this work is part of an initial survey of 216 public officials on virtual learning environments, which gives us the following results: more than 50% have taken and finished virtual courses, 70% preferably with a duration of less than 3 weeks, more than 60% prefer free courses, to the He asks, if he knows about public investment, it draws attention, since he is close to 80% does not know about public investment, something that for the municipal administration is considered "serious", even more so when about a third are under 30 years of age. Based on these results, a pilot test is designed and implemented with the free software tool Moodle, generating positive results at the end of the course when presenting and submitting investment projects to the Project Bank of the Administrative Planning Department, who validates its correct structure and information. It is evidenced by this pilot test that the options for the use and implementation of Free Software guarantee the same results as the counterpart of Private Software, even more so when Free Software clearly has positive options for modification and customization that allow a development tailored to the needs. needs

    Thermochemical equilibrium model of synthetic natural gas production from coal gasification using aspen plus

    Get PDF
    ABSTRACT: The production of synthetic or substitute natural gas (SNG) from coal is a process of interest in Colombia where the reserves-to-production ratio (R/P) for natural gas is expected to be between 7 and 10 years, while the R/P for coal is forecasted to be around 90 years. In this work, the process to produce SNG by means of coal-entrained flow gasifiers is modeled under thermochemical equilibrium with the Gibbs free energy approach. The model was developed using a complete and comprehensive Aspen Plus model. Two typical technologies used in entrained flow gasifiers such as coal dry and coal slurry are modeled and simulated. Emphasis is put on interactions between the fuel feeding technology and selected energy output parameters of coal-SNG process, that is, energy efficiencies, power, and SNG quality. It was found that coal rank does not significantly affect energy indicators such as cold gas, process, and global efficiencies. However, feeding technology clearly has an effect on the process due to the gasifying agent. Simulations results are compared against available technical data with good accuracy. Thus, the proposed model is considered as a versatile and useful computational tool to study and optimize the coal to SNG process

    Refinamiento del diagrama de clases uml a oracle®9i en atom3

    Get PDF
    El OMG define el refinamiento como el proceso de transformación desde un modelo independiente de la plataforma de implementación hacia un modelo específico de la plataforma de implementación. Las herramientas CASE convencionales han experimentado problemas con este tipo de transformación, debido a la definición estática de los modelos incluidos en ellas, a las dificultades para la definición de reglas de transformación y al pobre rendimiento mostrado por ellas en la obtención de código. Las herramientas MetaCASE han surgido con nuevas capacidades para mejorar el refinamiento en el contexto de la transformación entre modelos. En este artículo se presenta una implementación en AToM3 para refinamiento que transforma un diagrama de clases UML independiente de la plataforma de implementación a un diagrama de clases UML dependiente de la plataforma de implementación Oracle® 9i. Además, se muestra el uso de esta clase de refinamiento con un caso de estudio

    Unc-method: un método de desarrollo de software basado en problemas

    Get PDF
    Los ingenieros de software emplean los métodos de desarrollo para garantizar la entrega puntual, el cumplimiento de los presu-puestos y la calidad de las aplicaciones de software. Existen dos tipos de métodos de desarrollo: los dirigidos por planes, y los á-giles. Ambos, aún presentan problemas: se refieren a la solución en lugar de pensar en el problema, usan artefactos formales o semiformales y dejan el manejo de la consistencia en manos de los analistas. En este artículo se define UNC-Method, un méto-do de desarrollo de software basado en problemas, que se viene desarrollando en la Universidad Nacional de Colombia y que se usa en la Escuela de Sistemas como parte del entrenamiento en desarrollo metodológico de software a los estudiantes de di-cha universidad durante los últimos cinco años. UNC-Method combina artefactos tradicionales del desarrollo de software (como los diagramas de UML y las interfaces gráficas de usuario) con enfoques no tradicionales en dicha disciplina (como los diagra-mas causa-efecto, los diagramas de objetivos de KAOS y los esquemas preconceptuales) en un esfuerzo por resolver los proble-mas antes mencionados. Además, se ejemplifica el método con un caso de estudio.Software engineers use development methods to guarantee on-time delivery, keeping to budget and quality in their software applications. There are two kinds of development methods: plan-driven and agile methods. Both of them still have problems; these refer to resolving problems instead of thinking about them, they use informal or semi-formal artefacts and they leave consis-tency management to the analysts. The UNC-method (a problem-based software development method) is defined in this paper. The UNC-method is currently being developed in the Universidad Nacional de Colombia; it has been used by students from the School of Systems as part of their training in methodological software development during the last five years. The UNC-method is a mixture of well-known artefacts (i.e. UML diagrams and graphical user interfaces) and non-traditional approaches (e.g. cause-and-effect diagram, KAOS goal diagrams and pre-conceptual schemas) used in trying to overcome the aforementioned pro-blems. A case study is also used for exemplification purposes

    Los modelos verbales en lenguaje natural y su utilización en la elaboración de esquemas conceptuales para el desarrollo de software: una revisión crítica

    Get PDF
    Software development begins with a series of interviews to potential users with the purpose of determining the software requirements; as a result of the interviews yield verbal models in natural language. Based on the verbal models, conceptual frameworks can be designed. These are diagrams that allow graphic data and functions related to the problem to develop software. This article covers worldwide work carried out in this field, with an analysis of the possible research topics based on the unsolved problems.El desarrollo de software inicia con una serie de entrevistas realizadas a los usuarios potenciales con el fin de determinar los requisitos del software; como resultado de las entrevistas se obtienen modelos verbales en lenguaje natural. A partir de los modelos verbales es posible construir esquemas conceptuales, que son diagramas que permiten representar gráficamente los datos y funciones asociados con el problema para realizar el desarrollo del software. En este artículo se compendian los trabajos que en esta materia se han adelantado a nivel mundial, realizando un análisis de los posibles tópicos de investigación a partir de los problemas no resueltos

    Los modelos verbales en lenguaje natural y su utilización en la elaboración de esquemas conceptuales para el desarrollo de software: una revisión crítica

    Get PDF
    El desarrollo de software inicia con una serie de entrevistas realizadas a los usuarios potenciales con el fin de determinar los requisitos del software; como resultado de las entrevistas se obtienen modelos verbales en lenguaje natural. A partir de los modelos verbales es posible construir esquemas conceptuales, que son diagramas que permiten representar gráficamente los datos y funciones asociados con el problema para realizar el desarrollo del software. En este artículo se compendian los trabajos que en esta materia se han adelantado a nivel mundial, realizando un análisis de los posibles tópicos de investigación a partir de los problemas no resueltos

    Efecto del rango de carbones colombianos y su tecnología de alimentación en la producción de gas natural sustituto, mediante gasificación en lecho arrastrado

    Get PDF
    RESUMEN: Presenta los resultados de un estudio del efecto del rango del carbón usado (desde subbituminoso hasta semiantracita) y de la tecnología de alimentación (seca o húmeda) sobre el proceso de producción de gas natural sustituto (GNS) en gasificadores de flujo arrastrado. Se analizaron diez carbones provenientes de importantes minas de Colombia. El proceso de producción de GNS a partir de gasificación de carbón se modeló bajo equilibrio termoquímico en Aspen Plus. El rendimiento del proceso se evaluó en términos de parámetros de salida, que incluyen el poder calórico del GNS, el índice de Wobbe, la eficiencia de conversión de carbón, la eficiencia en frío, la eficiencia del proceso, la eficiencia global y la tasa de producción de GNS, entre otros. En orden descendente, el proceso carbón-GNS mejora energéticamente con el uso de carbones con alta relación material volátil/carbón fijo, bajo contenido de ceniza, alta relación C+H/O y alto valor calórico del carbón. La eficiencia energética global para la producción de GNS vía gasificación es 17% mayor para la tecnología de alimentación en húmedo con respecto a la tecnología de alimentación en seco; esto posiblemente se da por la mayor concentración de CH4 en el syngas (alrededor del 7% vol.) cuando se usa alimentación en húmedo. El GNS simulado cumple los estándares de calidad de gas natural (GN) en Colombia; por lo tanto, el combustible gaseoso sustituto podría transportarse directamente por gasoductos. Por lo anterior, es técnicamente viable considerar el proceso carbón-GNS como una alternativa no convencional para la producción de GN.ABSTRACT: The effect of coal rank (from sub-bituminous to semi-anthracite) and type of fuel feeding technology (slurry and dry) on the production of substitute natural gas (SNG) in entrained flow gasifiers is studied. Ten coals from important Colombian mines were selected. The process is modeled under thermochemical equilibrium using Aspen Plus, and its performance is evaluated in function of output parameters that include SNG heating value, Wobbe index, coal conversion efficiency, cold gas efficiency, process efficiency, global efficiency, and SNG production rate, among others. In descending order, the coal-to-SNG process improves energetically with the use of coals with: higher volatile-matter to fixed-carbon ratio, lower ash content, higher C+H/O ratio, and higher coal heating value. The overall energy efficiency of the slurry-feed technology (S-FT) to produce SNG by gasification is 17% higher than the dry-feed technology (D-FT), possibly as a consequence of the higher CH4 concentration in the syngas (around 7 vol. %) when the coal is fed as aqueous slurry. As the simulated SNG meets the natural gas (NG) quality standards in Colombia, the substitute gaseous fuel could be directly transported through pipelines. Therefore, the coal-to-SNG process is a technically feasible and unconventional alternative for NG production
    corecore