33 research outputs found

    Designing an Alternate Mission Operations Control Room

    Get PDF
    The Huntsville Operations Support Center (HOSC) is a multi-project facility that is responsible for 24x7 real-time International Space Station (ISS) payload operations management, integration, and control and has the capability to support small satellite projects and will provide real-time support for SLS launches. The HOSC is a serviceoriented/ highly available operations center for ISS payloads-directly supporting science teams across the world responsible for the payloads. The HOSC is required to endure an annual 2-day power outage event for facility preventive maintenance and safety inspection of the core electro-mechanical systems. While complete system shut-downs are against the grain of a highly available sub-system, the entire facility must be powered down for a weekend for environmental and safety purposes. The consequence of this ground system outage is far reaching: any science performed on ISS during this outage weekend is lost. Engineering efforts were focused to maximize the ISS investment by engineering a suitable solution capable of continuing HOSC services while supporting safety requirements. The HOSC Power Outage Contingency (HPOC) System is a physically diversified compliment of systems capable of providing identified real-time services for the duration of a planned power outage condition from an alternate control room. HPOC was designed to maintain ISS payload operations for approximately three continuous days during planned HOSC power outages and support a local Payload Operations Team, International Partners, as well as remote users from the alternate control room located in another building. This paper presents the HPOC architecture and lessons learned during testing and the planned maiden operational commissioning. Additionally, this paper documents the necessity of an HPOC capability given the unplanned HOSC Facility power outage on April 27th, 2011, as a result of the tornado outbreak that damaged the electrical grid to such a degree that significantly inhibited the Tennessee Valley Authority's ability to transmit electricity throughout the North Alabama region

    Cost Analysis in a Multi-Mission Operations Environment

    Get PDF
    Spacecraft control centers have evolved from dedicated, single-mission or single mission-type support to multi-mission, service-oriented support for operating a variety of mission types. At the same time, available money for projects is shrinking and competition for new missions is increasing. These factors drive the need for an accurate and flexible model to support estimating service costs for new or extended missions; the cost model in turn drives the need for an accurate and efficient approach to service cost analysis. The National Aeronautics and Space Administration (NASA) Huntsville Operations Support Center (HOSC) at Marshall Space Flight Center (MSFC) provides operations services to a variety of customers around the world. HOSC customers range from launch vehicle test flights; to International Space Station (ISS) payloads; to small, short duration missions; and has included long duration flagship missions. The HOSC recently completed a detailed analysis of service costs as part of the development of a complete service cost model. The cost analysis process required the team to address a number of issues. One of the primary issues involves the difficulty of reverse engineering individual mission costs in a highly efficient multi-mission environment, along with a related issue of the value of detailed metrics or data to the cost model versus the cost of obtaining accurate data. Another concern is the difficulty of balancing costs between missions of different types and size and extrapolating costs to different mission types. The cost analysis also had to address issues relating to providing shared, cloud-like services in a government environment, and then assigning an uncertainty or risk factor to cost estimates that are based on current technology, but will be executed using future technology. Finally the cost analysis needed to consider how to validate the resulting cost models taking into account the non-homogeneous nature of the available cost data and the decreasing flight rate. This paper presents the issues encountered during the HOSC cost analysis process, and the associated lessons learned. These lessons can be used when planning for a new multi-mission operations center or in the transformation from a dedicated control center to multi-center operations, as an aid in defining processes that support future cost analysis and estimation. The lessons can also be used by mature service-oriented, multi-mission control centers to streamline or refine their cost analysis process

    Defining the effect and mediators of two knowledge translation strategies designed to alter knowledge, intent and clinical utilization of rehabilitation outcome measures: a study protocol [NCT00298727]

    Get PDF
    BACKGROUND: A substantial number of valid outcome measures have been developed to measure health in adult musculoskeletal and childhood disability. Regrettably, national initiatives have merely resulted in changes in attitude, while utilization remains unacceptably low. This study will compare the effectiveness and mediators of two different knowledge transfer (KT) interventions in terms of their impact on changing knowledge and behavior (utilization and clinical reasoning) related to health outcome measures. METHOD/DESIGN: Physical and occupational therapists (n = 144) will be recruited in partnership with the national professional associations to evaluate two different KT interventions with the same curriculum: 1) Stakeholder-Hosted Interactive Problem-Based Seminar (SHIPS), and 2) Online Problem-Based course (e-PBL). SHIPS will consist of face-to-face problem-based learning (PBL) for 2 1/2 days with outcome measure developers as facilitators, using six problems generated in consultation with participants. The e-PBL will consist of a 6-week web-based course with six generic problems developed by content experts. SHIPS will be conducted in three urban centers in Canada. Participants will be block-allocated by a minimization procedure to either of the two interventions to minimize any prognostic differences. Trained evaluators at each site will conduct chart audits and chart-stimulated recall. Trained interviewers will conduct semi-structured interviews focused on identifying critical elements in KT and implementing practice changes. Interviews will be transcribed verbatim. Baseline predictors including demographics, knowledge, attitudes/barriers regarding outcome measures, and Readiness to Change will be assessed by self-report. Immediately post-intervention and 6 months later, these will be re-administered. Primary qualitative and quantitative evaluations will be conducted 6-months post-intervention to assess the relative effectiveness of KT interventions and to identify elements that contribute to changing clinical behavior. Chart audits will determine the utilization of outcome measures (counts). Incorporation of outcome measures into clinical reasoning will be assessed using an innovative technique: chart-stimulated recall. DISCUSSION: A strategy for optimal transfer of health outcome measures into practice will be developed and shared with multiple disciplines involved in primary and specialty management of musculoskeletal and childhood disability

    Finishing the euchromatic sequence of the human genome

    Get PDF
    The sequence of the human genome encodes the genetic instructions for human physiology, as well as rich information about human evolution. In 2001, the International Human Genome Sequencing Consortium reported a draft sequence of the euchromatic portion of the human genome. Since then, the international collaboration has worked to convert this draft into a genome sequence with high accuracy and nearly complete coverage. Here, we report the result of this finishing process. The current genome sequence (Build 35) contains 2.85 billion nucleotides interrupted by only 341 gaps. It covers ∼99% of the euchromatic genome and is accurate to an error rate of ∼1 event per 100,000 bases. Many of the remaining euchromatic gaps are associated with segmental duplications and will require focused work with new methods. The near-complete sequence, the first for a vertebrate, greatly improves the precision of biological analyses of the human genome including studies of gene number, birth and death. Notably, the human enome seems to encode only 20,000-25,000 protein-coding genes. The genome sequence reported here should serve as a firm foundation for biomedical research in the decades ahead

    Toxoplasma gondii infections are associated with costly boldness toward felids in a wild host

    Get PDF
    Toxoplasma gondii is hypothesized to manipulate the behavior of warm-blooded hosts to promote trophic transmission into the parasite’s definitive feline hosts. A key prediction of this hypothesis is that T. gondii infections of non-feline hosts are associated with costly behavior toward T. gondii’s definitive hosts; however, this effect has not been documented in any of the parasite’s diverse wild hosts during naturally occurring interactions with felines. Here, three decades of field observations reveal that T. gondii-infected hyena cubs approach lions more closely than uninfected peers and have higher rates of lion mortality. We discuss these results in light of 1) the possibility that hyena boldness represents an extended phenotype of the parasite, and 2) alternative scenarios in which T. gondii has not undergone selection to manipulate behavior in host hyenas. Both cases remain plausible and have important ramifications for T. gondii’s impacts on host behavior and fitness in the wild.publishe
    corecore