274 research outputs found

    Burden-shifting of water quantity and quality stress from mega-city Shanghai

    Get PDF
    Much attention has been paid to burden-shifting of CO2 emissions from developed regions to developing regions through trade. However, less discussed is that trade also acts as a mechanism enabling wealthy consumers to shift water quantity and quality stress to their trading partners. In this study we investigate how Shanghai, the largest mega-city in China, draws water resources from all over China and outsources its pollution through virtual quantity and quality water flows associated with trade. The results show that Shanghai’s consumption of goods and services in 2007 led to 11.6 billion m3 of freshwater consumption, 796 thousand tons of COD, and 16.2 thousand tons of NH3-N in discharged wastewater. Of this, 79% of freshwater consumption, 82.9% of COD and 82.5% of NH3-N occurred in other Chinese Provinces which provide goods and services to Shanghai. Thirteen Provinces with severe and extreme water quantity stress accounted for 60% of net virtual water import to Shanghai, while 19 Provinces experiencing water quality stress endured 79% of net COD outsourcing and 75.5% of net NH3-N outsourcing from Shanghai. In accordance with the three ‘redlines’ recently put forward by the Chinese central government to control water pollution and cap total water use in all provinces, we suggest that Shanghai should share its responsibility for reducing water quantity and quality stress in its trading partners through taking measures at provincial, industrial and consumer levels. In the meantime, Shanghai needs to enhance demand side management by promoting low water intensity consumption

    Quantification of effects of climate variations and human activities on runoff by a monthly water balance model: A case study of the Chaobai River basin in northern China

    Get PDF
    The Chaobai River basin in northern China consists of two major tributaries, the Chao River and Bai River. Monthly observations of precipitation, streamfiow, and panevaporation data are available for 35 years (1961-1966 and 1973-2001). Using the annual time series of the observed streamfiow, one break point at 1979 is detected and is adopted to divide the data set into two study periods, the "before" and "after" periods marking the onset of significant anthropogenic alteration of the flow (reservoirs and silt retention dams, five times increase in population) and significant changes in land use (conversion to terraced fields versus sloping fields). The distributed time-variant gain model (DTVGM) was used to evaluate the water resources of the area. Furthermore, the Bayesian method used by Engeland et al. (2005) was used in this paper to evaluate two uncertainty sources (i.e., the model parameter and model structure) and for assessing the DTVGM's performance over the Chaobai River basin. Comparing the annual precipitation means over 13 years (1961-1966 and 1973-1979), the means of the second period (1980-2001) decreased by 5.4% and 4.9% in the Chao River and Bai River basins, respectively. However, the related annual runoff decreased by 40.3% and 52.8%, respectively, a much greater decline than exhibited by precipitation. Through the monthly model simulation and the fixing-changing method, it is determined that decreases in runoff between the two periods can be attributed to 35% (31%) from climate variations and 68% (70%) from human activities in the Chao River (Bai River). Thus, human impact exerts a dominant influence upon runoff decline in the Chaobai River basin compared to climate. This study enhances our understanding of the relative roles of climate variations and human activities on runoff. © 2009 by the American Geophysical Union.published_or_final_versio

    Environmental impact assessments of the Three Gorges Project in China: issues and interventions

    Get PDF
    The paper takes China's authoritative Environmental Impact Statement for the Yangzi (Yangtze) Three Gorges Project (TGP) in 1992 as a benchmark against which to evaluate emerging major environmental outcomes since the initial impoundment of the Three Gorges reservoir in 2003. The paper particularly examines five crucial environmental aspects and associated causal factors. The five domains include human resettlement and the carrying capacity of local environments (especially land), water quality, reservoir sedimentation and downstream riverbed erosion, soil erosion, and seismic activity and geological hazards. Lessons from the environmental impact assessments of the TGP are: (1) hydro project planning needs to take place at a broader scale, and a strategic environmental assessment at a broader scale is necessary in advance of individual environmental impact assessments; (2) national policy and planning adjustments need to react quickly to the impact changes of large projects; (3) long-term environmental monitoring systems and joint operations with other large projects in the upstream areas of a river basin should be established, and the cross-impacts of climate change on projects and possible impacts of projects on regional or local climate considered. © 2013 Elsevier B.V.Xibao Xu, Yan Tan, Guishan Yan

    Construction and progress of Chinese terrestrial ecosystem carbon, nitrogen and water fluxes coordinated observation

    Full text link
    • …
    corecore