    Design management: changing roles of the professions

    Get PDF
    This paper sets out to explore how recent changes in procurement in construction have affected the roles that professions play in the design process. It discusses how professions that traditionally took the role of design manager now find themselves participating within previously unforeseen contexts, working in multidisciplinary teams led by contractors and with changed responsibilities at the design stage. Supply chain members who were not previously involved during the early project phases are being engaged at the earliest phases of the project life cycle and even taking leadership roles while designers sometimes work as supply chain partners. A study of design in construction and other sectors shows that in dealing with design management issues it is critical to deepen appreciation for the unique characteristics of design and the design process. The paper argues that contractors and designers taking on design management roles in a dynamic industry seeking to explore best practice and innovative approaches to procurement and in the delivery of projects need to acquire new skills, management education and develop the necessary qualities

    A review of critical project management techniques to enhance construction SMEs project performance

    Get PDF
    Abstract: Performance is linked with implementation of project management techniques. Literature suggests that problems such as inefficiency, poor budgetary issues, improper planning, scheduling and control in projects execution are associated with inadequate implementation of the essential techniques for meeting project deliverables. These shortcomings are prevalent among Small and Medium Enterprises (SMEs) in the developing countries including South Africa. Hence, the primary objective of this paper is to review the critical project management techniques for the improvement of construction project performance especially among SMEs in South Africa. The study is based on previous literature on construction SMEs project performance as well as project management techniques implementation. The literature review centered on both international and South African context. The study revealed that critical path method, work breakdown structure, and earned value management analysis were the most occurring project management techniques from the sampled literature. Findings from this study are envisaged to be beneficial to construction stakeholders in developing relevant project management techniques to improve the performance of SMEs

    Impacts of 4D BIM on Construction Project Performance

    Get PDF
    A significant proportion of construction projects are failing to achieve their deadline finish dates. This advocate for solutions that could address the root causes of time impacting risks, leading to the use of 4D BIM for project planning. This study investigates the impacts of 4D BIM on construction projects. An exploratory sequential mixed method research was conducted to initially explore the topic via interviews and literature review, and, subsequently, the themes derived were put into questionnaires to elicit expert knowledge on a wider industry scale. The data were analysed using thematic analysis, reliability analysis, Kruskal-Wallis test and factor analysis. Across the objectives around the impacts of 4D BIM on project reliability, monitoring and diagnosis, the findings presented eight key ways the 4D BIM support project performance. Examples of component factors that were raised was planning efficiency to enhance planner output, assessment and directive with a better comparison of planned and actual progress, and thorough/comprehensive risk reflection to cover wide ranges of issues. Upon further reflection, the finding highlighted the issues of the lack of shared responsibility outside of the planner and BIM coordinator, severe lack of understanding and training regarding 4D BIM and complexity of carrying out the process effectively

    Exploring earned value management in the Spanish construction industry as a pathway to competitive advantage

    Full text link
    [EN] As a well established discipline and profession, project management has its distinctive tools and techniques. One of them that has been considered the embodiment of the core principles of project management is the Earned Value Management (EVM). In managing construction projects, the EVM has been considered as a suitable tool and hence, has been implemented in various construction industry but absent in some others. Taking into account the dynamic environment where construction companies have to operate, particularly in turbulence environments as the direct result of recent global economic downturn, this paper explores the potential implementation of EVM in one of the construction industry, the Spanish construction industry. The outcomes confirm the needs for and feasibility of implementing EVM as a structured approach in the industry to reposition the Spanish construction industry with the long term view to increase its project management maturity level as a pathway to gaining competitive advantage.Universitat Politecnica de Valencia [grant number 19701344]Sutrisna, M.; Pellicer, E.; Torres-Machí, C.; Picornell, M. (2018). Exploring earned value management in the Spanish construction industry as a pathway to competitive advantage. International Journal of Construction Management. 20(1):1-12. https://doi.org/10.1080/15623599.2018.1459155S112201Anbari, F. T. (2004). Earned value project management method and extensions. IEEE Engineering Management Review, 32(3), 97-97. doi:10.1109/emr.2004.25113Aram, J. D., & Walochik, K. (1996). Improvisation and the Spanish Manager. International Studies of Management & Organization, 26(4), 73-89. doi:10.1080/00208825.1996.11656695Brandon, D. M. (1998). Implementing Earned Value Easily and Effectively. Project Management Journal, 29(2), 11-18. doi:10.1177/875697289802900204Brown, A., & Adams, J. (2000). Measuring the effect of project management on construction outputs: a new approach. International Journal of Project Management, 18(5), 327-335. doi:10.1016/s0263-7863(99)00026-5Bryde, D. J. (2003). Modelling project management performance. International Journal of Quality & Reliability Management, 20(2), 229-254. doi:10.1108/02656710310456635Chen, H. L., Chen, W. T., & Lin, Y. L. (2016). Earned value project management: Improving the predictive power of planned value. International Journal of Project Management, 34(1), 22-29. doi:10.1016/j.ijproman.2015.09.008De la Cruz, M. P., del Caño, A., & de la Cruz, E. (2006). Downside Risks in Construction Projects Developed by the Civil Service: The Case of Spain. Journal of Construction Engineering and Management, 132(8), 844-852. doi:10.1061/(asce)0733-9364(2006)132:8(844)Din, S., Abd-Hamid, Z., & Bryde, D. J. (2011). ISO 9000 certification and construction project performance: The Malaysian experience. International Journal of Project Management, 29(8), 1044-1056. doi:10.1016/j.ijproman.2010.11.001Eldin, N. N. (1989). Measurement of Work Progress: Quantitative Technique. Journal of Construction Engineering and Management, 115(3), 462-474. doi:10.1061/(asce)0733-9364(1989)115:3(462)Gidado, K. I. (1996). Project complexity: The focal point of construction production planning. Construction Management and Economics, 14(3), 213-225. doi:10.1080/014461996373476Hastak, M., Halpin, D. W., & Vanegas, J. (1996). COMPASS—New Paradigm for Project Cost Control Strategy and Planning. Journal of Construction Engineering and Management, 122(3), 254-264. doi:10.1061/(asce)0733-9364(1996)122:3(254)D. Holt, G., & S. Goulding, J. (2014). Conceptualisation of ambiguous-mixed-methods within building and construction research. Journal of Engineering, Design and Technology, 12(2), 244-262. doi:10.1108/jedt-02-2013-0020Ibbs, C. W., & Kwak, Y. H. (2000). Assessing Project Management Maturity. Project Management Journal, 31(1), 32-43. doi:10.1177/875697280003100106Jugdev, K., & Thomas, J. (2002). 2002 Student Paper Award Winner: Project Management Maturity Models: The Silver Bullets of Competitive Advantage? Project Management Journal, 33(4), 4-14. doi:10.1177/875697280203300402Kim, E., Wells, W. G., & Duffey, M. R. (2003). A model for effective implementation of Earned Value Management methodology. International Journal of Project Management, 21(5), 375-382. doi:10.1016/s0263-7863(02)00049-2Kim, T., Kim, Y.-W., & Cho, H. (2016). Customer Earned Value: Performance Indicator from Flow and Value Generation View. Journal of Management in Engineering, 32(1), 04015017. doi:10.1061/(asce)me.1943-5479.0000377Laufer, A., & Tucker, R. L. (1987). Is construction project planning really doing its job? A critical examination of focus, role and process. Construction Management and Economics, 5(3), 243-266. doi:10.1080/01446198700000023Liberatore, M. J., Pollack-Johnson, B., & Smith, C. A. (2001). Project Management in Construction: Software Use and Research Directions. Journal of Construction Engineering and Management, 127(2), 101-107. doi:10.1061/(asce)0733-9364(2001)127:2(101)Mir, F. A., & Pinnington, A. H. (2014). Exploring the value of project management: Linking Project Management Performance and Project Success. International Journal of Project Management, 32(2), 202-217. doi:10.1016/j.ijproman.2013.05.012Navon, R., & Haskaya, I. (2006). Is detailed progress monitoring possible without designated manual data collection? Construction Management and Economics, 24(12), 1225-1229. doi:10.1080/01446190600999097Onwuegbuzie, A. J., & Leech, N. L. (2005). Taking the «Q» Out of Research: Teaching Research Methodology Courses Without the Divide Between Quantitative and Qualitative Paradigms. Quality & Quantity, 39(3), 267-295. doi:10.1007/s11135-004-1670-0Oviedo-Haito, R. J., Jiménez, J., Cardoso, F. F., & Pellicer, E. (2014). Survival Factors for Subcontractors in Economic Downturns. Journal of Construction Engineering and Management, 140(3), 04013056. doi:10.1061/(asce)co.1943-7862.0000811Pellicer, E., Sanz, M. A., Esmaeili, B., & Molenaar, K. R. (2016). Exploration of Team Integration in Spanish Multifamily Residential Building Construction. Journal of Management in Engineering, 32(5), 05016012. doi:10.1061/(asce)me.1943-5479.0000438Potts, K., & Ankrah, N. (2008). Construction Cost Management. doi:10.4324/9780203933015Vanhoucke, M. (2012). Project Management with Dynamic Scheduling. doi:10.1007/978-3-642-25175-7Yazici, H. J. (2009). The Role of Project Management Maturity and Organizational Culture in Perceived Performance. Project Management Journal, 40(3), 14-33. doi:10.1002/pmj.20121Yu, A. G., Flett, P. D., & Bowers, J. A. (2005). Developing a value-centred proposal for assessing project success. International Journal of Project Management, 23(6), 428-436. doi:10.1016/j.ijproman.2005.01.00

    A strategic approach to mitigating operational failure across transitions

    Get PDF
    It is recognized that projects continue to deliver operational assets that are partially defective. This article proposes this because the causes of operational failures have not been extensively analyzed. This study explores how an infrastructure client made quality a strategic and project delivery necessity by undertaking research to analyze operational failure. A mixed-method approach consisting of three phases was used: (1) to understand the operational failure elements; (2) to explore the causes of operational failure; and (3) to develop a new strategic framework to address failure mitigation. The study showed the need for transferring, applying, and recognizing capabilities across strategic business, project delivery, and operational use transitions