Implementing 5D BIM on construction projects: Contractor perspectives from the UK construction sector
This is an accepted manuscript of an article published by Emerald in Journal of Engineering, Design and Technology on 09/05/2020: https://doi.org/10.1108/JEDT-01-2020-0007
The accepted version of the publication may differ from the final published version.Purpose
The purpose of this paper is to report on primary research findings that sought to investigate and analyse salient issues on the implementation of 5D building information modelling (BIM) from the UK contractors’ perspective. Previous research and efforts have predominantly focussed on the use of technologies for cost estimation and quantity takeoff within a more traditional-led procurement, with a paucity of research focussing on how 5D BIM could facilitate costing within contractor-led procurement. This study fills this current knowledge gap and enhances the understanding of the specific costing challenges faced by contractors in contractor-led projects, leading to the development of 5D framework for use in future projects.
Design/methodology/approach
To develop a fully detailed understanding of the challenges and issues being faced in this regard, a phenomenological, qualitative-based study was undertaken through interviews involving 21 participants from UK-wide construction organisations. A thematic data analytical process was applied to the data to derive key issues, and this was then used to inform the development of a 5D-BIM costing framework.
Findings
Multi-disciplinary findings reveal a range of issues faced by contractors when implementing 5D BIM. These exist at strategic, operational and technological levels which require addressing successful implementation of 5D BIM on contractor-led projects adhering to Level 2 BIM standards. These findings cut across the range of stakeholders on contractor-led projects. Ultimately, the findings suggest strong commitment and leadership from organisational management are required to facilitate cost savings and generate accurate cost information.
Practical implications
This study highlights key issues for any party seeking to effectively deploy 5D BIM on a contractor-led construction project. A considerable cultural shift towards automating and digitising cost functions virtually, stronger collaborative working relationship relative to costing in design development, construction practice, maintenance and operation is required.
Originality/value
By analysing findings from primary research data, the work concludes with the development of a 5D BIM costing framework to support contractor-led projects which can be implemented to ensure that 5D BIM is successfully implemented
Artificial neural network analysis of teachers��� performance against thermal comfort
This is an accepted manuscript of an article published by Emerald in International Journal of Building Pathology and Adaptation on 17/04/2020, available online at: https://doi.org/10.1108/IJBPA-11-2019-0098
The accepted manuscript may differ from the final published version.Purpose: The impact of thermal comfort in educational buildings continues to be
of major importance in both the design and construction phases. Given this, it is
also equally important to understand and appreciate the impact of design decisions
on post-occupancy performance, particularly on staff and students. This study aims
to present the effect of IEQ on teachers��� performance. This study would provide
thermal environment requirements to BIM-led school refurbishment projects.
Design: This paper presents a detailed investigation into the direct impact of
thermal parameters (temperature, relative humidity and ventilation rates) on
teacher performance. In doing so, the research methodological approach combines
explicit mixed-methods using questionnaire surveys and physical measurements of
thermal parameters to identify correlation and inference. It was conducted through
a single case study using a technical college based in Saudi Arabia. Findings:
Findings from this work were used to develop a model using an Artificial Neural
Network to establish causal relationships. Research findings indicate an optimal
temperature range between 23��C and 25��C, with a 65% relative humidity and
0.4m/s ventilation rate. This ratio delivered optimum results for both comfort and
performance
Recommended from our members
Model-based groupware solution for distributed real-time collaborative 4D planning via teamwork
Construction planning plays a fundamental role in construction project management that requires team working among planners from a diverse range of disciplines and in geographically dispersed working situations. Model-based four-dimensional (4D) computer-aided design (CAD) groupware, though considered a possible approach to supporting collaborative planning, is still short of effective collaborative mechanisms for teamwork due to methodological, technological and social challenges. Targeting this problem, this paper proposes a model-based groupware solution to enable a group of multidisciplinary planners to perform real-time collaborative 4D planning across the Internet. In the light of the interactive definition method, and its computer-supported collaborative work (CSCW) design analysis, the paper discusses the realization of interactive collaborative mechanisms from software architecture, application mode, and data exchange protocol. These mechanisms have been integrated into a groupware solution, which was validated by a planning team in a truly geographically dispersed condition. Analysis of the validation results revealed that the proposed solution is feasible for real-time collaborative 4D planning to gain a robust construction plan through collaborative teamwork. The realization of this solution triggers further considerations about its enhancement for wider
groupware applications
Building Information Management (BIM) Education in the Dominican Republic: An Empirical Study
Building Information Management (BIM) education is par excellence the best solution to overcome the lack of BIM knowledge and BIM skilled professionals that affect the implementation of BIM in the Architecture, Engineering, and Construction (AEC) industry. Moreover, BIM education is vital to drive the implementation and evolution of BIM in the AEC industry. However, its provision can be a difficult task, more for BIM infant countries such as the Dominican Republic (DR). By adopting a qualitative approach, using semi‐structured interviews with nine professionals involved in BIM education, this study aims to explore the presence of BIM education in the DR. The data gathered was analysed with the method of content analysis. The findings mainly indicated: a shortage of BIM experts; lack of BIM education, as there is currently provided only BIM training based on software; and the dissemination of BIM knowledge through educational activities and BIM communities. However, the provision of BIM education is likely to expand. Most of the current training providers are eager to continue with their work and get into further areas, and there is also evidence of the first plan of inserting BIM in a university curriculum. These results infer that, for an infant country, BIM education seems to be heading in the right direction in the DR. The implementation of BIM is likely to increase, along with the provision and demand of BIM education in the country. This research may be beneficial to professional and policy makers interested in BIM education in BIM infant countries
BIM education framework for clients and professionals of the construction industry
Lack of qualified BIM professionals is a key BIM challenge that affects specific organisations and on a more macro scale, individual countries. A salient solution to this problem is the provision of better BIM education. This article represents the initial work into the implementation of BIM in the Dominican Republic, a country affected by different challenges in regard to BIM implementation, with a key issue surrounding the lack of BIM education. The aim of the article is the development of a conceptual BIM education framework which suggests strategies to be implemented in Academia and the industry for the delivery of BIM education to all the construction parties involved in a project, including the client. A literature review about BIM education and training and the revision of BIM education frameworks worldwide helped in its development. The framework is beneficial to this country as it is intended to be part of a toolkit, the final outcome of a PhD research on this country. However, it can be consulted by any country or organisation interested in developing BIM education strategies
Phosphorylation of eIF4GII and 4E-BP1 in response to nocodazole treatment: a reappraisal of translation initiation during mitosis
Translation mechanisms at different stages of the cell cycle have been studied for many years, resulting in the dogma that translation rates are slowed during mitosis, with cap-independent translation mechanisms favored to give expression of key regulatory proteins. However, such cell culture studies involve synchronization using harsh methods, which may in themselves stress cells and affect protein synthesis rates. One such commonly used chemical is the microtubule de-polymerization agent, nocodazole, which arrests cells in mitosis and has been used to demonstrate that translation rates are strongly reduced (down to 30% of that of asynchronous cells). Using synchronized HeLa cells released from a double thymidine block (G 1/S boundary) or the Cdk1 inhibitor, RO3306 (G 2/M boundary), we have systematically re-addressed this dogma. Using FACS analysis and pulse labeling of proteins with labeled methionine, we now show that translation rates do not slow as cells enter mitosis. This study is complemented by studies employing confocal microscopy, which show enrichment of translation initiation factors at the microtubule organizing centers, mitotic spindle, and midbody structure during the final steps of cytokinesis, suggesting that translation is maintained during mitosis. Furthermore, we show that inhibition of translation in response to extended times of exposure to nocodazole reflects increased eIF2α phosphorylation, disaggregation of polysomes, and hyperphosphorylation of selected initiation factors, including novel Cdk1-dependent N-terminal phosphorylation of eIF4GII. Our work suggests that effects on translation in nocodazole-arrested cells might be related to those of the treatment used to synchronize cells rather than cell cycle status
Identification of Epstein-Barr virus replication proteins in Burkitt’s lymphoma cells
The working model to describe the mechanisms used to replicate the cancer-associated virus Epstein-Barr virus (EBV) is partly derived from comparisons with other members of the Herpes virus family. Many genes within the EBV genome are homologous across the herpes virus family. Published transcriptome data for the EBV genome during its lytic replication cycle show extensive transcription, but the identification of the proteins is limited. We have taken a global proteomics approach to identify viral proteins that are expressed during the EBV lytic replication cycle. We combined an enrichment method to isolate cells undergoing EBV lytic replication with SILAC-labeling coupled to mass-spectrometry and identified viral and host proteins expressed during the OPEN ACCESS Pathogens 2015, 4 740 EBV lytic replication cycle. Amongst the most frequently identified viral proteins are two components of the DNA replication machinery, the single strand DNA binding protein BALF2, DNA polymerase accessory protein BMRF1 and both subunits of the viral ribonucleoside-diphosphate reductase enzyme (BORF2 and BaRF1). An additional 42 EBV lytic cycle proteins were also detected. This provides proteomic identification for many EBV lytic replication cycle proteins and also identifies post-translational modifications
- …