14 research outputs found

    Factors of affecting business opportunities in developing ecotourism

    Get PDF
    This tourism science study aims to identify what factors affect business opportunities to develop the creative economy of the tourism sector in the Lumbang Julu Regency. With this identification, the tourism development sector will be able to play its role, improving the economy of the local community. For this reason, it is necessary to have an effort such as a study to identify what factors need to be prioritized in developing tourism in a tourist destination. To realize the development of tourism, especially the potential and factors that affect business. A series of searches and data collection through field observations, a survey of 175 visitors, and a study of related literature were carried out. The way to collect data is to ask what the tourists' goals are, what situation they like, and previous tourist experiences in other places. After the data has been collected, it is then continued with analysis using a descriptive qualitative and quantitative combined method approach with an emphasis on 5 indicators that will influence entrepreneurial success in Lumbang District

    Time and space multi-manned assembly line balancing problem using genetic algorithm

    Get PDF
    Purpose: Time and Space assembly line balancing problem (TSALBP) is the problem of balancing the line taking the area required by the task and to store the tools into consideration. This area is important to be considered to minimize unplanned traveling distance by the workers and consequently unplanned time waste. Although TSALBP is a realistic problem that express the real-life situation, and it became more practical to consider multi-manned assembly line to get better space utilization, few literatures addressed the problem of time and space in simple assembly line and only one in multi-manned assembly line. In this paper the problem of balancing bi-objective time and space multi-manned assembly line is proposed Design/methodology/approach: Hybrid genetic algorithm under time and space constraints besides assembly line conventional constraints is used to model this problem. The initial population is generated based on conventional assembly line heuristic added to random generations. The objective of this model is to minimize number of workers and number of stations. Findings: The results showed the effectiveness of the proposed model in solving multi-manned time and space assembly line problem. The proposed method gets better results in solving real-life Nissan problem compared to the literature. It is also found that there is a relationship between the variability of task time, maximum task time and cycle time on the solution of the problem. In some problem features it is more appropriate to solve the problem as simple assembly line than multi-manned assembly line. Originality/value: It is the first article to solve the problem of balancing multi-manned assembly line under time and area constraint using genetic algorithm. A relationship between the problem features and the solution is found according to it, the solution method (one sided or multi-manned) is definedPeer Reviewe

    Optimization of two sided assembly line balancing with resource constraint

    Get PDF
    Two-sided assembly line balancing (2S-ALB) problems are practically useful in improving the production of large-sized high-volume products. Many research has proposed various approaches to study and balance this well-known ALB problem. Although much attention has been given to solve and optimize 2S-ALB, the majority of the research assumed the workstation has similar capabilities. This research has been conducted in an automotive assembly line, where most of the equipment used in assembly is different from one workstation to another. The assumption that all workstation has similar capabilities lead to inefficient resource utilization in assembly line design. This research aims to model and optimize 2S-ALB with resource constraints. Besides optimizing the line balancing, the proposed model also will minimize the number of resources in the two-sided assembly line. The research begins with problem formulation by establishing four optimization objectives. The considered optimization objectives were to minimize the number of workstations, number of mated-workstation, total idle time, and number of resources. For optimization purpose, Particle Swarm Optimization is modified to find the best solution besides reducing the dependencies on a single best solution. This is conducted by replacing the best solution with the top three solutions in the reproduction process. A set of benchmark problems for 2S-ALB were used to test the proposed Modified Particle Swarm Optimization (MPSO) in the computational experiment. Later, the proposed 2S-ALB with resource constraint model and algorithm was validated using a case study problem. The computational experiment result using benchmark test problems indicated that the proposed MPSO was able to search for better solution in 91.6% of the benchmark problems. The good performance of MPSO is attributed to its ability to maintain particle diversity over the iteration. Meanwhile, the case study result indicated that the proposed 2S-ALB with resource constraint model and MPSO algorithm are able to be utilized for the real problem. In the future, the multiobjective optimization problem will be considered to be optimized for other types of general assembly lines

    MILP model for integrated line balancing and model sequencing problems for Mixed-Model Two-Sided Assembly Line

    Get PDF
    This research explores two interrelated problems in Mixed-Model Two-Sided Assembly Line (MMTSAL), which are line balancing and model sequencing. These two problems are solved simultaneously using Mixed Integer Linear Programming (MILP) with the objectives of minimizing total utility work and idle time by considering various practical constraints. The problem is analyzed using small-size to large-sized test cases using General Algebraic Modelling System (GAMS) with the solver CPLEX. Experimental results indicate that integrating the problems help to minimize the proposed objective function. Also, it is found that the feasible solution for model sequence with the assignment of tasks to assembly line is optimal

    An analysis of task assignment and cycle times when robots are added to human-operated assembly lines, using mathematical programming models

    Get PDF
    Abstract Adding robots to a human-operated assembly line influences both the short- and long-term operation of the line. However, the effects of robots on assembly line capacity and on cycle time can only be studied if appropriate task assignment models are available. This paper shows how traditional assembly line balancing models can be changed in order to determine the optimal number of workstations and cycle time when robots with different technological capabilities are able to perform a predetermined set of tasks. The mathematical programming models for the following three cases are presented and analysed: i) only workers are assigned to the workstations; ii) either a worker or a robot is assigned to a workstation; iii) a robot and a worker are also assigned to specific workstations. The data of an assembly line producing power inverters is used to illustrate the proposed calculations. Both the assignment of tasks and the changes of cycle time are analysed within the AIMMS modelling environment. The computational characteristics of the proposed mathematical programming models are also examined and tested using benchmark problems. The models presented in this paper can assist operations management in making decisions relating to assembly line configuration

    A mathematical model and genetic algorithm-based approach for parallel two-sided assembly line balancing problem

    Get PDF
    Copyright © 2015 Taylor & Francis. This is an Accepted Manuscript of an article published by Taylor & Francis in Production Planning & Control on 27 April 2015, available online: http://dx.doi.org/10.1080/09537287.2014.994685Assembly lines are usually constructed as the last stage of the entire production system and efficiency of an assembly line is one of the most important factors which affect the performance of a complex production system. The main purpose of this paper is to mathematically formulate and to provide an insight for modelling the parallel two-sided assembly line balancing problem, where two or more two-sided assembly lines are constructed in parallel to each other. We also propose a new genetic algorithm (GA)-based approach in alternatively to the existing only solution approach in the literature, which is a tabu search algorithm. To the best of our knowledge, this is the first formal presentation of the problem as well as the proposed algorithm is the first attempt to solve the problem with a GA-based approach in the literature. The proposed approach is illustrated with an example to explain the procedures of the algorithm. Test problems are solved and promising results are obtained. Statistical tests are designed to analyse the advantage of line parallelisation in two-sided assembly lines through obtained test results. The response of the overall system to the changes in the cycle times of the parallel lines is also analysed through test problems for the first time in the literature

    Simultaneous balancing and sequencing of mixed-model parallel two-sided assembly lines

    Get PDF
    Copyright © 2014 Taylor & Francis. This is an Accepted Manuscript of an article published by Taylor & Francis in International Journal of Production Research on 31 January 2014, available online: http://www.tandfonline.com/10.1080/00207543.2013.879618Growing interests from customers in customised products and increasing competitions among peers necessitate companies to configure their manufacturing systems more effectively than ever before. We propose a new assembly line system configuration for companies that need intelligent solutions to satisfy customised demands on time with existing resources. A mixed-model parallel two-sided assembly line system is introduced based on the parallel two-sided assembly line system previously proposed by Ozcan et al. (Balancing parallel two-sided assembly lines, International Journal of Production Research, 48 (16), 4767-4784, 2010). The mixed-model parallel two-sided assembly line balancing problem is illustrated with examples from the perspective of simultaneous balancing and sequencing. An agent based ant colony optimisation algorithm is proposed to solve the problem. This algorithm is the first attempt in the literature to solve an assembly line balancing problem with an agent based ant colony optimisation approach. The algorithm is illustrated with an example and its operational procedures and principles explained and discussed

    Type-E Parallel Two-Sided Assembly Line Balancing Problem: Mathematical Model and Ant Colony Optimisation based Approach with Optimised Parameters

    Get PDF
    Copyright © 2015 Elsevier. This is a PDF file of an unedited manuscript that has been accepted for publication in Computers and Industrial Engineering (doi:10.1016/j.cie.2014.12.037). The manuscript will undergo copyediting, typesetting, and review of the resulting proof before it is published in its final form. Please note that during the production process errors may be discovered which could affect the content, and all legal disclaimers that apply to the journal pertain.There are many factors which affect the performance of a complex production system. Efficiency of an assembly line is one of the most important of these factors since assembly lines are generally constructed as the last stage of an entire production system. Parallel two-sided assembly line system is a new research domain in academia though these lines have been utilised to produce large sized products such as automobiles, trucks, and buses in industry for many years. Parallel two-sided assembly lines carry practical advantages of both parallel assembly lines and two-sided assembly lines. The main purpose of this paper is to introduce type-E parallel two-sided assembly line balancing problem for the first time in the literature and to propose a new ant colony optimisation based approach for solving the problem. Different from the existing studies on parallel assembly line balancing problems in the literature, this paper aims to minimise two conflicting objectives, namely cycle time and number of workstations at the same time and proposes a mathematical model for the formal description of the problem. To the best of our knowledge, this is the first study which addresses both conflicting objectives on a parallel two-sided assembly line configuration. The developed ant colony optimisation algorithm is illustrated with an example to explain its procedures. An experimental design is also conducted to calibrate the parameters of the proposed algorithm using response surface methodology. Results obtained from the performed computational study indicate that minimising cycle time as well as number of workstations help increase system efficiency. It is also observed that the proposed algorithm finds promising results for the studied cases of type-E parallel two-sided assembly line balancing problem when the results are compared with those obtained from other three well-known heuristics

    Mixed-model parallel two-sided assembly line balancing problem: A flexible agent-based ant colony optimization approach

    Get PDF
    This is the author accepted manuscript. The final version is available from the publisher via the DOI in this record.Assembly lines are frequently used as a production method to assemble complex products. Two-sided assembly lines are utilized to assemble large-sized products (e.g., cars, buses, trucks). Locating two lines in parallel helps improve line efficiency by enabling collaboration between the line workers. This paper proposes a mixed-model parallel two-sided assembly line system that can be utilized to produce large-sized items in an inter-mixed sequence. The mixed-model parallel two-sided line balancing problem is defined and the advantages of utilizing multi-line stations across the lines are discussed. A flexible agent-based ant colony optimization algorithm is developed to solve the problem and a numerical example is given to explain the method systematically. The proposed algorithm builds flexible balancing solutions suitable for any model sequence launched. The dynamically changing workloads of workstations (based on specific product models during the production process) are also explored. A comprehensive experimental study is conducted and the results are statistically analyzed using the well-known paired sample t-test. The test results indicate that the mixed-model parallel two-sided assembly line system reduces the workforce need in comparison with separately balanced mixed-model two-sided lines. It is also shown that the proposed algorithm outperforms the tabu search algorithm and six heuristics often used in the assembly line balancing domain
    corecore