1,366 research outputs found

    Modelling train delays with q-exponential functions

    Get PDF
    We demonstrate that the distribution of train delays on the British railway network is accurately described by q-exponential functions. We explain this by constructing an underlying superstatistical model.Comment: 12 pages, 5 figure

    Anti-Icing Formulas Prevent Train Delays

    Get PDF
    In the winter of 2009, Washington, DC, workers faced the prospect of a difficult commute due to record-setting snowfalls. But thousands of the city's Metrorail riders found the public transportation system fully functional, thanks in part to a NASA technology invented years before. Just like trains, an airplane must be snow- and ice-free to ensure safe travel. Traditionally, fluids containing a compound called ethylene glycol have been used to inhibit ice on planes. In 1992, however, the US Air Force banned its purchase of this ingredient due to toxicity concerns. According to the Centers for Disease Control, exposure to large amounts of ethylene glycol through air or water can damage the kidneys, nervous system, lungs, and heart. Urine samples from airport deicing workers have contained traces of the substance. At the time of the Air Force s ban, Robert Lockyer was working at NASA s Ames Research Center in the Advanced Composites Model Development Branch, where he says "we decided to pick up the gauntlet and began researching existing fluid compositions and the processes used in deicing aircraft." Along with Lockyer, in 1997 Ames researchers Leonard Haslim and John Zuk devised a nontoxic, biodegradable, and cost effective substitute for ethylene glycol. When applied to a dry surface before a snow or ice event, the solution prevented ice from forming a bond with the surface. This made it easy to wipe away any accumulation

    Freight Train Scheduling using Integer Linear Programming: A case study of cement distribution

    Get PDF
    Transportation process is responsible for providing efficiency of moving products considering time, cost, and vehicle utilities through inbound and outbound logistics. Transportation disruptions such as congestion, delays, or cancellations can have a detrimental impact on the company. PT X uses trains to transport unpackaged cement in bulk from factory to port. PT X has not met the daily train delivery target due to train delays, inconsistency delivery frequency and ineffective schedule. Therefore, the quantity of shipment does not meet the expected target. In this study, optimization of train rescheduling was carried out to minimize total train delays. This optimization is expected to be able to create a new train schedule that meets the daily delivery target. The proposed model is formulated as and solved as Integer Linear Programming (ILP) problem by considering single-track railway constraints. Results show the optimal train schedules give a total delay of 26 minutes. Compared to the existing condition, train delays are reduced by 69.7% and provide a more effective schedule with consistent delivery frequency

    Optimization of timetable supplement from a passenger based socio-economic point of view

    Get PDF
    This article discusses how to optimize the timetable supplement in timetables. The focus of this article will be on railways, but the principle will in theory apply to all transportation modes within the area of public transportation. When constructing timetables it is important to plan the right amount of timetable supplement. Too little timetable supplement will result in many delays, while too high timetable supplement will result in a (too) high planned travel time which will affect every departure whether or not the train is delayed. At present timetable supplement is chosen based on experience or estimates. Through an optimization process it is possible to find the optimal timetable supplement. A way to do so is by using the passenger delay model in a socio-economic analysis as done by (Thorhauge & Piester, 2010). In this process the train delays (or a simulation of the train delays) are needed. The overall process is (if the train delays are not already known): Simulation of train delays → modeling passenger delays → estimation of the socio-economic effects A case study of an upgrade of Sydbanen between Ringsted and Rþdby has been conducted using the passenger delay model and the methods are described in this article. The case study has shown that the optimum timetable supplement is between 6-9 % depending on the scenario. By optimizing the timetable supplement it is possible to achieve a surplus of 250-500 mio. DKK during the evaluation period compared to the proposed timetable by the Danish Transport Authority (Trafikstyrelsen, 2008). Note however that none of the investigated scenarios are socio-economic viable even though the timetable and timetable supplement is optimized. Note that this paper is regarded as a sequel to the article “The usability of passenger delay models in socio-economic analysis” (Thorhauge, 2010). This article is based on the results of (Thorhauge & Piester, 2010)

    Detecting Train Delays using Railway Network Topology in Twitter

    Get PDF
    This paper presents a novel train delay detection method based on topic propagation analysis of geo-tagged tweets between railway stations. Our goal is to detect traffic accidents and to predict train delays in railway network topology by tracing how relevant tweets propagate in real space and cyberspace. In our method, we utilize railway network as the topology of real space, and extract the topology of social network that is mapped on the railway network. This permits observing the influence of delays on stations with a few tweets, or predicting related tweets of affected stations even if the tweets contain indirect topics about delays

    Rail Track Maintenance Planning: An Assessment Model

    Get PDF
    In Australia, railway track maintenance costs comprise between 25-35 percent of total freight train operating costs. Track maintenance planning models have been shown to reduce maintenance costs by 5 to 10 percent though improved planning. This paper describes a model which has been developed to deal with the track maintenance planning function at the medium to long-term levels. This model simulates the impacts of degrading railway track conditions and related maintenance work, in contrast to tradition models that mainly use expert systems. The model simulates the degrading track condition using an existing track degradation model. Track condition data from that model is used to determine if safety related speed restrictions are needed and what immediate maintenance work may be required for safe train operations. The model outputs the net present value of the benefits of undertaking a given maintenance strategy, when compared with a base-case scenario. The model approach has advantages over current models in investigating what if scenarios. The track engineer can assess the possible benefits in reduced operating costs from upgrading track infrastructure or from the use of improved maintenance equipment. After describing the model inputs and the assumptions used, the paper deals with the simulation of track maintenance and of train operating costs over time. The results of applying the model to a test track section using a number of different maintenance strategies are also given

    The conflict resolution in connected railway junctions

    Get PDF
    Purpose of study: Traffic conflicts occur when trains on different routes approach a converging junction in a railway network at the same time. To prevent collisions, a right-of-way assignment is needed to control the order in which the trains should pass the junction. Such control action inevitably requires the braking and/or stopping of trains, which lengthens their travelling times and leads to delays. Train delays cause a loss of punctuality and hence directly affect the quality of service. It is therefore important to minimise the delays by devising a suitable right-of-way assignment. One of the major difficulties in attaining the optimal right-of-way assignment is that the number of feasible assignments increases dramatically with the number of trains. Connected-junctions further complicate the problem. Exhaustive search for the optimal solution is time-consuming and infeasible for area control (multi-junction). Even with the more intelligent deterministic optimisation method revealed in [1], the computation demand is still considerable, which hinders real-time control. In practice, as suggested in [2], the optimality may be traded off by shorter computation time, and heuristic searches provide alternatives for this optimisation problem

    Multi-objective model for optimizing railway infrastructure asset renewal

    Get PDF
    Trabalho inspirado num problema real da empresa Infraestruturas de Portugal, EP.A multi-objective model for managing railway infrastructure asset renewal is presented. The model aims to optimize three objectives, while respecting operational constraints: levelling investment throughout multiple years, minimizing total cost and minimizing work start postponements. Its output is an optimized intervention schedule. The model is based on a case study from a Portuguese infrastructure management company, which specified the objectives and constraints, and reflects management practice on railway infrastructure. The results show that investment levelling greatly influences the other objectives and that total cost fluctuations may range from insignificant to important, depending on the condition of the infrastructure. The results structure is argued to be general and suggests a practical methodology for analysing trade-offs and selecting a solution for implementation.info:eu-repo/semantics/publishedVersio

    Optimal Scheduling of Trains on a Single Line Track

    Get PDF
    This paper describes the development and use of a model designed to optimise train schedules on single line rail corridors. The model has been developed with two major applications in mind, namely: as a decision support tool for train dispatchers to schedule trains in real time in an optimal way; and as a planning tool to evaluate the impact of timetable changes, as well as railroad infrastructure changes. The mathematical programming model described here schedules trains over a single line track. The priority of each train in a conflict depends on an estimate of the remaining crossing and overtaking delay, as well as the current delay. This priority is used in a branch and bound procedure to allow and optimal solution to reasonable size train scheduling problems to be determined efficiently. The use of the model in an application to a 'real life' problem is discussed. The impacts of changing demand by increasing the number of trains, and reducing the number of sidings for a 150 kilometre section of single line track are discussed. It is concluded that the model is able to produce useful results in terms of optimal schedules in a reasonable time for the test applications shown here
    • 