1,166 research outputs found

    A Rapid Heuristic for Scheduling Non-Preemptive Dependent Periodic Tasks onto Multiprocessor

    Get PDF
    International audienceWe address distributed real-time applications represented by systems of non-preemptive dependent periodic tasks. This system is described by an acyclic directed graph. Because the distribution and the scheduling of these tasks onto a multiprocessor is an NP-hard problem we propose a greedy heuristic to solve it. Our heuristic sequences three algorithms: assignment, unrolling, and scheduling. The tasks of the same, or multiple, periods are assigned to the same processor according to a mixed sort. Then, the initial graph of tasks is unrolled, i.e. each task is repeated according to the ratio between its period and the least common multiple of all periods of tasks. Finally, the tasks of the unrolled graph are distributed and scheduled onto the processors where they have been assigned. Then, we give the complexity of this heuristic, and we illustrate it with an example. A performance analysis comparing our heuristic with an optimal Branch and Cut algorithm concludes that our heuristic is effective in terms of scheduling success ratio and speed

    Scheduling Techniques for Operating Systems for Medical and IoT Devices: A Review

    Get PDF
    Software and Hardware synthesis are the major subtasks in the implementation of hardware/software systems. Increasing trend is to build SoCs/NoC/Embedded System for Implantable Medical Devices (IMD) and Internet of Things (IoT) devices, which includes multiple Microprocessors and Signal Processors, allowing designing complex hardware and software systems, yet flexible with respect to the delivered performance and executed application. An important technique, which affect the macroscopic system implementation characteristics is the scheduling of hardware operations, program instructions and software processes. This paper presents a survey of the various scheduling strategies in process scheduling. Process Scheduling has to take into account the real-time constraints. Processes are characterized by their timing constraints, periodicity, precedence and data dependency, pre-emptivity, priority etc. The affect of these characteristics on scheduling decisions has been described in this paper

    Schedulability, Response Time Analysis and New Models of P-FRP Systems

    Get PDF
    Functional Reactive Programming (FRP) is a declarative approach for modeling and building reactive systems. FRP has been shown to be an expressive formalism for building applications of computer graphics, computer vision, robotics, etc. Priority-based FRP (P-FRP) is a formalism that allows preemption of executing programs and guarantees real-time response. Since functional programs cannot maintain state and mutable data, changes made by programs that are preempted have to be rolled back. Hence in P-FRP, a higher priority task can preempt the execution of a lower priority task, but the preempted lower priority task will have to restart after the higher priority task has completed execution. This execution paradigm is called Abort-and-Restart (AR). Current real-time research is focused on preemptive of non-preemptive models of execution and several state-of-the-art methods have been developed to analyze the real-time guarantees of these models. Unfortunately, due to its transactional nature where preempted tasks are aborted and have to restart, the execution semantics of P-FRP does not fit into the standard definitions of preemptive or non-preemptive execution, and the research on the standard preemptive and non-preemptive may not applicable for the P-FRP AR model. Out of many research areas that P-FRP may demands, we focus on task scheduling which includes task and system modeling, priority assignment, schedulability analysis, response time analysis, improved P-FRP AR models, algorithms and corresponding software. In this work, we review existing results on P-FRP task scheduling and then present our research contributions: (1) a tighter feasibility test interval regarding the task release offsets as well as a linked list based algorithm and implementation for scheduling simulation; (2) P-FRP with software transactional memory-lazy conflict detection (STM-LCD); (3) a non-work-conserving scheduling model called Deferred Start; (4) a multi-mode P-FRP task model; (5) SimSo-PFRP, the P-FRP extension of SimSo - a SimPy-based, highly extensible and user friendly task generator and task scheduling simulator.Computer Science, Department o

    Schedulability Analysis for Certification-friendly Multicore Systems

    Get PDF
    This paper presents a new schedulability test for safety-critical software undergoing a transition from single-core to multicore systems - a challenge faced by multiple industries today. Our migration model, consisting of a schedulability test and execution model, is distinguished by three aspects consistent with reducing transition cost. First, it assumes externally-driven scheduling parameters, such as periods and deadlines, remain fixed (and thus known), whereas exact computation times are not. Second, it adopts a globally synchronized conflict-free I/O model that leads to a decoupling between cores, simplifying the schedulability analysis. Third, it employs global priority assignment across all tasks on each core, irrespective of application, where budget constraints on each application ensure isolation. These properties enable us to obtain a utilization bound that places an allowable limit on total task execution times. Evaluation results demonstrate the advantages of our scheduling model over competing resource partitioning approaches, such as Periodic Server and TDMA.Ope

    Scheduling of real time embedded systems for resource and energy minimization by voltage scaling

    Full text link
    The aspects of real-time embedded computing are explored with the focus on novel real-time scheduling policies, which would be appropriate for low-power devices. To consider real-time deadlines with pre-emptive scheduling policies will require the investigation of intelligent scheduling heuristics. These aspects for various other RTES models like Multiple processor system, Dynamic Voltage Scaling and Dynamic scheduling are the focus of this thesis. Deadline based scheduling of task graphs representative of real time systems is performed on a multiprocessor system; A set of aperiodic, dependent tasks in the form of a task graph are taken as the input and all the required task parameters are calculated. All the tasks are then partitioned into two or more clusters allowing them to be run at different voltages. Each cluster, thus voltage scaled results in the overall minimization of the power utilized by the system. With the mapping of each task to a particular voltage done, the tasks are scheduled on a multiprocessor system consisting of processors that can run at different voltages and frequencies, in such a way that all the timing constraints are satisfied

    Scheduling Self-Suspending Tasks: New and Old Results

    Get PDF
    In computing systems, a job may suspend itself (before it finishes its execution) when it has to wait for certain results from other (usually external) activities. For real-time systems, such self-suspension behavior has been shown to induce performance degradation. Hence, the researchers in the real-time systems community have devoted themselves to the design and analysis of scheduling algorithms that can alleviate the performance penalty due to self-suspension behavior. As self-suspension and delegation of parts of a job to non-bottleneck resources is pretty natural in many applications, researchers in the operations research (OR) community have also explored scheduling algorithms for systems with such suspension behavior, called the master-slave problem in the OR community. This paper first reviews the results for the master-slave problem in the OR literature and explains their impact on several long-standing problems for scheduling self-suspending real-time tasks. For frame-based periodic real-time tasks, in which the periods of all tasks are identical and all jobs related to one frame are released synchronously, we explore different approximation metrics with respect to resource augmentation factors under different scenarios for both uniprocessor and multiprocessor systems, and demonstrate that different approximation metrics can create different levels of difficulty for the approximation. Our experimental results show that such more carefully designed schedules can significantly outperform the state-of-the-art

    Real-Time Wireless Sensor-Actuator Networks for Cyber-Physical Systems

    Get PDF
    A cyber-physical system (CPS) employs tight integration of, and coordination between computational, networking, and physical elements. Wireless sensor-actuator networks provide a new communication technology for a broad range of CPS applications such as process control, smart manufacturing, and data center management. Sensing and control in these systems need to meet stringent real-time performance requirements on communication latency in challenging environments. There have been limited results on real-time scheduling theory for wireless sensor-actuator networks. Real-time transmission scheduling and analysis for wireless sensor-actuator networks requires new methodologies to deal with unique characteristics of wireless communication. Furthermore, the performance of a wireless control involves intricate interactions between real-time communication and control. This thesis research tackles these challenges and make a series of contributions to the theory and system for wireless CPS. (1) We establish a new real-time scheduling theory for wireless sensor-actuator networks. (2) We develop a scheduling-control co-design approach for holistic optimization of control performance in a wireless control system. (3) We design and implement a wireless sensor-actuator network for CPS in data center power management. (4) We expand our research to develop scheduling algorithms and analyses for real-time parallel computing to support computation-intensive CPS
    • …
    corecore