    Geometric and harmonic means based priority dispatching rules for single machine scheduling problems

    Full text link
    [EN] This work proposes two new prority dispatching rules (PDRs) for solving single machine scheduling problems. These rules are based on the geometric mean (GM) and harmonic mean (HM) of the processing time (PT) and the due date (DD) and they are referred to as GMPD and HMPD respectively. Performance of the proposed PDRs is evaluated on the basis of five measures/criteria i.e. Total Flow Time (TFT), Total Lateness (TL), Number of Late Jobs (TNL), Total Earliness (TE) and Number of Early Parts (TNE). It is found that GMPD performs better than other PDRs in achieving optimal values of multiple performance measures. Further, effect of variation in the weight assigned to PT and DD on the combined performance of TFT and TL is also examined which reveals that for deriving optimal values of TFT and TL, weighted harmonic mean (WHMPD) rule with a weight of 0.105 outperforms other PDRs. The weighted geometric mean (WGMPD) rule with a weight of 0.37 is found to be the next after WHMPD followed by the weighted PDT i.e. WPDT rule with a weight of 0.76.Ahmad, S.; Khan, ZA.; Ali, M.; Asjad, M. (2021). Geometric and harmonic means based priority dispatching rules for single machine scheduling problems. International Journal of Production Management and Engineering. 9(2):93-102. https://doi.org/10.4995/ijpme.2021.15217OJS9310292Baharom, M. Z., Nazdah, W., &Hussin, W. (2015). Scheduling Analysis for Job Sequencing in Veneer Lamination Line. Journal of Industrial and Intelligent Information, 3(3). https://doi.org/10.12720/jiii.3.3.181-185Chan, F. T. S., Chan, H. K., Lau, H. C. W., & Ip, R. W. L. (2003). Analysis of dynamic dispatching rules for a flexible manufacturing system. Journal of Materials Processing Technology, 138(1), 325-331. https://doi.org/10.1016/S0924-0136(03)00093-1Cheng, T. C. E., &Kahlbacher, H. G. (1993). Single-machine scheduling to minimize earliness and number of tardy jobs. Journal of Optimization Theory and Applications, 77(3), 563-573. https://doi.org/10.1007/BF00940450da Silva, N. C. O., Scarpin, C. T., Pécora, J. E., & Ruiz, A. (2019). Online single machine scheduling with setup times depending on the jobs sequence. Computers & Industrial Engineering, 129, 251-258. https://doi.org/10.1016/j.cie.2019.01.038Doh, H.H., Yu, J.M., Kim, J.S., Lee, D.H., & Nam, S.H. (2013). A priority scheduling approach for flexible job shops with multiple process plans. International Journal of Production Research, 51(12), 3748-3764. https://doi.org/10.1080/00207543.2013.765074Dominic, Panneer D. D., Kaliyamoorthy, S., & Kumar, M. S. (2004). Efficient dispatching rules for dynamic job shop scheduling. The International Journal of Advanced Manufacturing Technology, 24(1), 70-75.Ðurasević, M., &Jakobović, D. (2018). A survey of dispatching rules for the dynamic unrelated machines environment. Expert Systems with Applications, 113, 555-569. https://doi.org/10.1016/j.eswa.2018.06.053Forrester, P. (2006). Operations Management: An Integrated Approach. International Journal of Operations & Production Management.Geiger, C. D., &Uzsoy, R. (2008). Learning effective dispatching rules for batch processor scheduling. International Journal of Production Research, 46(6), 1431-1454. https://doi.org/10.1080/00207540600993360Hamidi, M. (2016). Two new sequencing rules for the non-preemptive single machine scheduling problem. The Journal of Business Inquiry, 15(2), 116-127.Holthaus, O., & Rajendran, C. (1997). New dispatching rules for scheduling in a job shop-An experimental study. The International Journal of Advanced Manufacturing Technology, 13(2), 148-153. https://doi.org/10.1007/BF01225761Hussain, M. S., & Ali, M. (2019). A Multi-agent Based Dynamic Scheduling of Flexible Manufacturing Systems. Global Journal of Flexible Systems Management, 20(3), 267-290. https://doi.org/10.1007/s40171-019-00214-9Jayamohan, M. S., & Rajendran, C. (2000). New dispatching rules for shop scheduling: A step forward. International Journal of Production Research, 38(3), 563-586. https://doi.org/10.1080/002075400189301Kadipasaoglu, S. N., Xiang, W., &Khumawala, B. M. (1997). A comparison of sequencing rules in static and dynamic hybrid flow systems. International Journal of Production Research, 35(5), 1359-1384. https://doi.org/10.1080/002075497195371Kanet, J. J., & Li, X. (2004). A Weighted Modified Due Date Rule for Sequencing to Minimize Weighted Tardiness. Journal of Scheduling, 7(4), 261-276. https://doi.org/10.1023/B:JOSH.0000031421.64487.95Lee, D.K., Shin, J.H., & Lee, D.H. (2020). Operations scheduling for an advanced flexible manufacturing system with multi-fixturing pallets. Computers & Industrial Engineering, 144, 106496. https://doi.org/10.1016/j.cie.2020.106496Lu, C.C., Lin, S.W., & Ying, K.C. (2012). Robust scheduling on a single machine to minimize total flow time. Computers & Operations Research, 39(7), 1682-1691. https://doi.org/10.1016/j.cor.2011.10.003Krishnan, M., Chinnusamy, T. R., & Karthikeyan, T. (2012). Performance Study of Flexible Manufacturing System Scheduling Using Dispatching Rules in Dynamic Environment. Procedia Engineering, 38, 2793-2798. https://doi.org/10.1016/j.proeng.2012.06.327Munir, E. U., Li, J., Shi, S., Zou, Z., & Yang, D. (2008). MaxStd: A task scheduling heuristic for heterogeneous computing environment. Information Technology Journal, 7(4), 679-683. https://doi.org/10.3923/itj.2008.679.683Oyetunji, E. O. (2009). Some common performance measures in scheduling problems. Research Journal of Applied Sciences, Engineering and Technology, 1(2), 6-9.Pinedo, M. L. (2009). Planning and Scheduling in Manufacturing and Services (2nd ed.). Springer-Verlag. https://doi.org/10.1007/978-1-4419-0910-7Prakash, A., Chan, F. T. S., & Deshmukh, S. G. (2011). FMS scheduling with knowledge based genetic algorithm approach. Expert Systems with Applications, 38(4), 3161-3171. https://doi.org/10.1016/j.eswa.2010.09.002Rafsanjani, M. K., &Bardsiri, A. K. (2012). A New Heuristic Approach for Scheduling Independent Tasks on Heterogeneous Computing Systems. International Journal of Machine Learning and Computing, 371-376. https://doi.org/10.7763/IJMLC.2012.V2.147Tyagi, N., Tripathi, R. P., &Chandramouli, A. B. (2016). Single Machine Scheduling Model with Total Tardiness Problem. Indian Journal of Science and Technology, 9(37). https://doi.org/10.17485/ijst/2016/v9i37/97527Vinod, V., & Sridharan, R. (2008). Dynamic job-shop scheduling with sequence-dependent setup times: Simulation modeling and analysis. The International Journal of Advanced Manufacturing Technology, 36(3), 355-372. https://doi.org/10.1007/s00170-006-0836-4Waikar, A. M., Sarker, B. R., & Lal, A. M. (1995). A comparative study of some priority dispatching rules under different shop loads. Production Planning & Control, 6(4), 301-310. https://doi.org/10.1080/0953728950893028

    An investigation into minimising total energy consumption and total completion time in a flexible job shop for recycling carbon fiber reinforced polymer

    Get PDF
    The increased use of carbon fiber reinforced polymer (CFRP) in industry coupled with European Union restrictions on landfill disposal has resulted in a need to develop relevant recycling technologies. Several methods, such as mechanical grinding, thermolysis and solvolysis, have been tried to recover the carbon fibers. Optimisation techniques for reducing energy consumed by above processes have also been developed. However, the energy efficiency of recycling CFRP at the workshop level has never been considered before. An approach to incorporate energy reduction into consideration while making the scheduling plans for a CFRP recycling workshop is presented in this paper. This research sets in a flexible job shop circumstance, model for the bi-objective problem that minimise total processing energy consumption and makespan is developed. A modified Genetic Algorithm for solving the raw material lot splitting problem is developed. A case study of the lot sizing problem in the flexible job shop for recycling CFRP is presented to show how scheduling plans affect energy consumption, and to prove the feasibility of the model and the developed algorithm

    High-Level Object Oriented Genetic Programming in Logistic Warehouse Optimization

    Get PDF
    Disertační práce je zaměřena na optimalizaci průběhu pracovních operací v logistických skladech a distribučních centrech. Hlavním cílem je optimalizovat procesy plánování, rozvrhování a odbavování. Jelikož jde o problém patřící do třídy složitosti NP-težký, je výpočetně velmi náročné nalézt optimální řešení. Motivací pro řešení této práce je vyplnění pomyslné mezery mezi metodami zkoumanými na vědecké a akademické půdě a metodami používanými v produkčních komerčních prostředích. Jádro optimalizačního algoritmu je založeno na základě genetického programování řízeného bezkontextovou gramatikou. Hlavním přínosem této práce je a) navrhnout nový optimalizační algoritmus, který respektuje následující optimalizační podmínky: celkový čas zpracování, využití zdrojů, a zahlcení skladových uliček, které může nastat během zpracování úkolů, b) analyzovat historická data z provozu skladu a vyvinout sadu testovacích příkladů, které mohou sloužit jako referenční výsledky pro další výzkum, a dále c) pokusit se předčit stanovené referenční výsledky dosažené kvalifikovaným a trénovaným operačním manažerem jednoho z největších skladů ve střední Evropě.This work is focused on the work-flow optimization in logistic warehouses and distribution centers. The main aim is to optimize process planning, scheduling, and dispatching. The problem is quite accented in recent years. The problem is of NP hard class of problems and where is very computationally demanding to find an optimal solution. The main motivation for solving this problem is to fill the gap between the new optimization methods developed by researchers in academic world and the methods used in business world. The core of the optimization algorithm is built on the genetic programming driven by the context-free grammar. The main contribution of the thesis is a) to propose a new optimization algorithm which respects the makespan, the utilization, and the congestions of aisles which may occur, b) to analyze historical operational data from warehouse and to develop the set of benchmarks which could serve as the reference baseline results for further research, and c) to try outperform the baseline results set by the skilled and trained operational manager of the one of the biggest warehouses in the middle Europe.

    Evaluation of Material Shortage Effect on Assembly Systems Considering Flexibility Levels

    Get PDF
    The global pandemic caused delays in global supply chains, and numerous manufacturing companies are experiencing a lack of materials and components. This material shortage affects assembly systems at various levels: process level (decreasing of the resource efficiency), system level (blocking or s tarvation of production entities), and company level (breaking the deadlines for the supplying of the products to customers or retailers). Flexible assembly systems allow dynamic reactions in such uncertain environments. However, online scheduling algorithms of current research are not considering reactions to material shortages. In the present research, we aim to evaluate the influence of material shortage on the assembly system performance. The paper presents a discrete event simulation of an assembly system. The system architecture, its behavior, the resources, their capacities, and product specific operations are included. The material shortage effect on the assembly system is compensated utilizing different system flexibility levels, characterized by operational and routing flexibility. An online control algorithm determines optimal production operation under material shortage uncertain conditions. With industrial data, different simulation scenarios evaluate the benefits of assembly systems with varying flexibility levels. Consideration of flexibility levels might facilitate exploration of the optimal flexibility level with the lowest production makespan that influence further supply chain, as makespan minimization cause reducing of delays for following supply chain entities

    From supply chains to demand networks. Agents in retailing: the electrical bazaar

    Get PDF
    A paradigm shift is taking place in logistics. The focus is changing from operational effectiveness to adaptation. Supply Chains will develop into networks that will adapt to consumer demand in almost real time. Time to market, capacity of adaptation and enrichment of customer experience seem to be the key elements of this new paradigm. In this environment emerging technologies like RFID (Radio Frequency ID), Intelligent Products and the Internet, are triggering a reconsideration of methods, procedures and goals. We present a Multiagent System framework specialized in retail that addresses these changes with the use of rational agents and takes advantages of the new market opportunities. Like in an old bazaar, agents able to learn, cooperate, take advantage of gossip and distinguish between collaborators and competitors, have the ability to adapt, learn and react to a changing environment better than any other structure. Keywords: Supply Chains, Distributed Artificial Intelligence, Multiagent System.Postprint (published version

    Scheduling Algorithms: Challenges Towards Smart Manufacturing

    Get PDF
    Collecting, processing, analyzing, and driving knowledge from large-scale real-time data is now realized with the emergence of Artificial Intelligence (AI) and Deep Learning (DL). The breakthrough of Industry 4.0 lays a foundation for intelligent manufacturing. However, implementation challenges of scheduling algorithms in the context of smart manufacturing are not yet comprehensively studied. The purpose of this study is to show the scheduling No.s that need to be considered in the smart manufacturing paradigm. To attain this objective, the literature review is conducted in five stages using publish or perish tools from different sources such as Scopus, Pubmed, Crossref, and Google Scholar. As a result, the first contribution of this study is a critical analysis of existing production scheduling algorithms\u27 characteristics and limitations from the viewpoint of smart manufacturing. The other contribution is to suggest the best strategies for selecting scheduling algorithms in a real-world scenario
    • …