6,187 research outputs found

    Evolutionary Algorithms for Community Detection in Continental-Scale High-Voltage Transmission Grids

    Get PDF
    Symmetry is a key concept in the study of power systems, not only because the admittance and Jacobian matrices used in power flow analysis are symmetrical, but because some previous studies have shown that in some real-world power grids there are complex symmetries. In order to investigate the topological characteristics of power grids, this paper proposes the use of evolutionary algorithms for community detection using modularity density measures on networks representing supergrids in order to discover densely connected structures. Two evolutionary approaches (generational genetic algorithm, GGA+, and modularity and improved genetic algorithm, MIGA) were applied. The results obtained in two large networks representing supergrids (European grid and North American grid) provide insights on both the structure of the supergrid and the topological differences between different regions. Numerical and graphical results show how these evolutionary approaches clearly outperform to the well-known Louvain modularity method. In particular, the average value of modularity obtained by GGA+ in the European grid was 0.815, while an average of 0.827 was reached in the North American grid. These results outperform those obtained by MIGA and Louvain methods (0.801 and 0.766 in the European grid and 0.813 and 0.798 in the North American grid, respectively)

    Practical applications of multi-agent systems in electric power systems

    Get PDF
    The transformation of energy networks from passive to active systems requires the embedding of intelligence within the network. One suitable approach to integrating distributed intelligent systems is multi-agent systems technology, where components of functionality run as autonomous agents capable of interaction through messaging. This provides loose coupling between components that can benefit the complex systems envisioned for the smart grid. This paper reviews the key milestones of demonstrated agent systems in the power industry and considers which aspects of agent design must still be addressed for widespread application of agent technology to occur

    Frequency restoration reserves : provision and activation using a multi-agent demand control system

    Get PDF
    In this work a control system for restoration reserve providers is proposed in which optimal biddings of restoration reserve capacity are made based on the predicted flexibility of the reserve resources within the portfolio of the reserve provider. I t is assumed that the gate closure time for submitting reserve capacit y bids is 1 hour before activation time. The reserve capacity bids need to be formed so that activation of the capacity is always feasible, irrespective of the consumption of the portfolio before an activation request. The determination of the optimal reserve capacity bids is only based on aggregated flexibility constraint information received by the individual flexible resources within the portfolio of the reserve provider. No further resource-spe cific information is used to determine the optimal reserve capacity bid. The activation and dispatch of the required power consumption at real time is done through a market-based multi-agent control system. A simulation example, in which the reserve capacity of a portfolio of batteries is simulated, proves the feasibility of the proposed approach and shows that a high precision of the portfolio response can be obtained

    Critical Review of Different Methods for Siting and Sizing Distributed-generators

    Get PDF
    Due to several benefits attached to distributed generators such as reduction in line losses, improved voltage profile, reliable system etc., the study on how to optimally site and size distributed generators has been on the increase for more than two decades. This has propelled several researchers to explore various scientific and engineering powerful simulation tools, valid and reliable scientific methods like analytical, meta-heuristic and hybrid methods to optimally place and size distributed generator(s) for optimal benefits. This study gives a critical review of different methods used in siting and sizing distributed generators alongside their results, test systems and gaps in literature

    Distribution network optimisation for an active network management system

    No full text
    The connection of Distributed Generators (DGs) to a distribution network causes technical concerns for Distribution Network Operators (DNOs) which include power flow management, loss increase and voltage management problems. An Active Network Management System can provide monitoring and control of the distribution network as well as providing the infrastructure and technology for full integration of DGs into the distribution network. The Optimal Power Flow (OPF) method is a valuable tool in providing optimal control solutions for active network management system applications. The research presented here has concentrated on the development of a multi-objective OPF to provide power flow management, voltage control solutions and network optimisation strategies. The OPF has been shown to provide accurate solutions for variety of network topologies. It is possible to apply time-series of load and generation data to the OPF in a loop, generating optimal network solutions to maintain the network within thermal and voltage limits. The OPF incorporates not only the DG real power output maximisation, but also network loss minimisation as well as minimising the dispatch of DG reactive power. This investigation uses a direct Interior Point (IP) method as the solution methodology which is speed efficient and converges in polynomial time. Each objective function has been assigned a weighting factor, making it possible to favour one objective function and ignore the others. Contributions to enhance the performance of the IP OPF algorithm include a new generic barrier parameter formulation and a new swing bus formulation to model energy export/import in the main optimisation routine. A Terminal Voltage Regulator Mode (TVRM) and Power Factor Regulation Mode (PFRM) for DG were incorporated in the main optimisation routine. The main motivation is to compare these two decentralised DG control methods in terms of the achieving the maximum DG real power generation. The DG operation methods of TVRM and PFRM are compared with the optimisation results obtained from centralised dispatch in terms of the DG capacity achieved as it produces the optimum overall network solution. A suitable value of the droop and local voltage regulator dead-bands were determined for particular DGs. Furthermore, the effect of these decentralised DG control methods on distribution network losses are considered in a measure to assess the financial implications from a DNO's perspective

    Criticality analysis for improving maintenance, felling and pruning cycles in power lines

    Get PDF
    16th IFAC Symposium on Information Control Problems in Manufacturing INCOM 2018 Bergamo, Italy, 11–13 June 2018. Edited by Marco Macchi, László Monostori, Roberto PintoThis paper deals with the process of criticality analysis in overhead power lines, as a tool to improve maintenance, felling & pruning programs. Felling & pruning activities are tasks that utility companies must accomplish to respect the servitudes of the overhead lines, concerned with distances to vegetation, buildings, infrastructures and other networks crossings. Conceptually, these power lines servitudes can be considered as failure modes of the maintainable items under our analysis (power line spans), and the criticality analysis methodology developed, will therefore help to optimize actions to avoid these as other failure modes of the line maintainable items. The approach is interesting, but another relevant contribution of the paper is the process followed for the automation of the analysis. Automation is possible by utilizing existing companies IT systems and databases. The paper explains how to use data located in Enterprise Assets Management Systems, GIS and Dispatching systems for a fast, reliable, objective and dynamic criticality analysis. Promising results are included and also discussions about how this technique may result in important implications for this type of businesse

    Energy management of distributed resources in power systems operations

    Get PDF

    Restoration of an active MV distribution grid with a battery ESS: A real case study

    Get PDF
    In order to improve power system operation, Battery Energy Storage Systems (BESSs) have been installed in high voltage/medium voltage stations by Distribution System Operators (DSOs) around the world. Support for restoration of MV distribution networks after a blackout or HV interruption is among the possible new functionalities of BESSs. With the aim to improve quality of service, the present paper investigates whether a BESS, installed in the HV/MV substation, can improve the restoration process indicators of a distribution grid. As a case study, an actual active distribution network of e-distribuzione, the main Italian DSO, has been explored. The existing network is located in central Italy. It supplies two municipalities of approximately 10,000 inhabitants and includes renewable generation plants. Several configurations are considered, based on: the state of the grid at blackout time; the BESS state of charge; and the involvement of Dispersed Generation (DG) in the restoration process. Three restoration plans (RPs) have been defined, involving the BESS alone, or in coordination with DG. A MATLAB®/Simulink® program has been designed to simulate the restoration process in each configuration and restoration plan. The results show that the BESS improves restoration process quality indicators in different simulated configurations, allowing the operation in controlled island mode of parts of distribution grids, during interruptions or blackout conditions. The defined restoration plans set the priority and the sequence of controlled island operations of parts of the grid to ensure a safe and better restoration. In conclusion, the results demonstrate that a BESS can be a valuable element towards an improved restoration procedure