176,963 research outputs found

    Determination of flow resistance coefficient for vegetation in open channel: laboratory study

    Get PDF
    This study focused on determination of flow resistances coefficient for grass in an open channel. Laboratory works were conducted to examine the effects of varying of roughness elements on the flume to determine flow resistance coefficient and also to determine the optimum flow resistance with five different flow rate, Q. Laboratory study with two type of vegetation which are Cow Grass and Pearl Grass were implementing to the bed of a flume. The roughness coefficient, n value is determine using Manning’s equation while Soil Conservation Services (SCS) method was used to determine the surface resistance. From the experiment, the flow resistance coefficient for Cow Grass in range 0.0008 - 0.0039 while Pearl Grass value for the flow resistance coefficient are in between 0.0013 - 0.0054. As a conclusion the vegetation roughness value in open channel are depends on density, distribution type of vegetation used and physical characteristic of the vegetation itsel

    Surfacing ERP exploitation risks through a risk ontology

    Get PDF
    Purpose – The purpose of this paper is to develop a risk identification checklist for facilitating user companies to surface, organise and manage potential risks associated with the post-adoption of Enterprise Resource Planning (ERP) systems. Design/methodology/approach – A desktop study, based on the process of a critical literature review, was conducted by the researchers. The critical review focused on IS and business research papers, books, case studies and theoretical articles, etc. Findings – By systematically and critically analysing and synthesising the literature reviewed, the researchers identified and proposed a total of 40 ERP post-implementation risks related to diverse operational, analytical, organisation-wide and technical aspects. A risk ontology was subsequently established to highlight these ERP risks, as well as to present their potential causal relationships. Research limitations/implications – For researchers, the established ERP risk ontology represents a starting point for further research, and provides early insights into a research field that will become increasingly important as more and more companies progress from implementation to exploitation of ERPs. Practical implications – For practitioners, the risk ontology is an important tool and checklist to support risk identification, prevention, management and control, as well as to facilitate strategic planning and decision making. Originality/value – There is a scarcity of studies focusing on ERP post-implementation in contrast with an over abundance of studies focusing on system implementation and project management aspects. This paper aims to fill this significant research gap by presenting a risk ontology of ERP post-adoption. It represents a first attempt in producing a comprehensive model in its area. No other such models could be found from the literature reviewed

    Stress concentration analysis of plate with circular hole : elasticity theory and finite element comparison

    Get PDF
    Stress concentration factor for a plate with circular free stress hole subjected to a uniform far field tension in single was investigated in this study. The stress concentration level along X and Y axis was determined by the elasticity theoritical method. Finite element analysis using LISA free source software was validate by the elasticity theoritical results. It was found that finite element analysis stress concentration factor results shows similar pattern as theoretical but higher near of the hole. Plain strain analysis with Quad 8 element type showed better results compared to plain stress with Quad 4 element type and plain strain with Quad 4 element type

    Integration of Cost andWork Breakdown Structures in the Management of Construction Projects

    Get PDF
    Scope management allows project managers to react when a project underperforms regarding schedule, budget, and/or quality at the execution stage. Scope management can also minimize project changes and budget omissions, as well as improve the accuracy of project cost estimates and risk responses. For scope management to be effective, though, it needs to rely on a robust work breakdown structure (WBS). A robust WBS hierarchically and faithfully reflects all project tasks and work packages so that projects are easier to manage. If done properly, the WBS also allows meeting the project objectives while delivering the project on time, on budget, and with the required quality. This paper analyzes whether the integration of a cost breakdown structure (CBS) can lead to the generation of more robust WBSs in construction projects. Over the last years, some international organizations have standardized and harmonized different cost classification systems (e.g., ISO 12006-2, ISO 81346-12, OmniClass, CoClass, UniClass). These cost databases have also been introduced into building information modeling (BIM) frameworks. We hypothesize that in BIM environments, if these CBSs are used to generate the project WBS, several advantages are gained such as sharper project definition. This enhanced project definition reduces project contradictions at both planning and execution stages, anticipates potential schedule and budget deviations, improves resource allocation, and overall it allows a better response to potential project risks. The hypothesis that the use of CBSs can generate more robust WBSs is tested by the response analysis of a questionnaire survey distributed among construction practitioners and project managers. By means of structural equation modeling (SEM), the correlation (agreement) and perception differences between two 250-respondent subsamples (technical project staff vs. project management staff) are also discussed. Results of this research support the use of CBSs by construction professionals as a basis to generate WBSs for enhanced project management (PM)

    Global Innovations in Measurement and Evaluation

    Get PDF
    We researched the latest developments in theory and practice in measurement and evaluation. And we found that new thinking, techniques, and technology are influencing and improving practice. This report highlights 8 developments that we think have the greatest potential to improve evaluation and programme design, and the careful collection and use of data. In it, we seek to inform and inspire—to celebrate what is possible, and encourage wider application of these ideas

    Project pathogens: The anatomy of omission errors in construction and resource engineering project

    Get PDF
    Construction and engineering projects are typically complex in nature and are prone to cost and schedule overruns. A significant factor that often contributes to these overruns is rework. Omissions errors, in particular, have been found to account for as much as 38% of the total rework costs experienced. To date, there has been limited research that has sought to determine the underlying factors that contribute to omission errors in construction and engineering projects. Using data derived from59 in-depth interviews undertaken with various project participants, a generic systemic causal model of the key factors that contributed to omission errors is presented. The developed causal model can improve understanding of the archetypal nature and underlying dynamics of omission errors. Error management strategies that can be considered for implementation in projects are also discussed
    corecore