209 research outputs found

    Solving no-wait two-stage flexible flow shop scheduling problem with unrelated parallel machines and rework time by the adjusted discrete Multi Objective Invasive Weed Optimization and fuzzy dominance approach

    Get PDF
    Purpose: Adjusted discrete Multi-Objective Invasive Weed Optimization (DMOIWO) algorithm, which uses fuzzy dominant approach for ordering, has been proposed to solve No-wait two-stage flexible flow shop scheduling problem. Design/methodology/approach: No-wait two-stage flexible flow shop scheduling problem by considering sequence-dependent setup times and probable rework in both stations, different ready times for all jobs and rework times for both stations as well as unrelated parallel machines with regards to the simultaneous minimization of maximum job completion time and average latency functions have been investigated in a multi-objective manner. In this study, the parameter setting has been carried out using Taguchi Method based on the quality indicator for beater performance of the algorithm. Findings: The results of this algorithm have been compared with those of conventional, multi-objective algorithms to show the better performance of the proposed algorithm. The results clearly indicated the greater performance of the proposed algorithm. Originality/value: This study provides an efficient method for solving multi objective no-wait two-stage flexible flow shop scheduling problem by considering sequence-dependent setup times, probable rework in both stations, different ready times for all jobs, rework times for both stations and unrelated parallel machines which are the real constraints.Peer Reviewe

    A survey of scheduling problems with setup times or costs

    Get PDF
    Author name used in this publication: C. T. NgAuthor name used in this publication: T. C. E. Cheng2007-2008 > Academic research: refereed > Publication in refereed journalAccepted ManuscriptPublishe

    Integrated Batching and Lot Streaming with Variable Sublots and Sequence-Dependent Setups in a Two-Stage Hybrid Flow Shop

    Get PDF
    Consider a paint manufacturing firm whose customers typically place orders for two or more products simultaneously: liquid primer, top coat paint, and/or undercoat paint. Each product belongs to an associated product family that can be batched together during the manufacturing process. Meanwhile, each product can be split into several sublots so that overlapping production is possible in a two-stage hybrid flow shop. Various numbers of identical capacitated machines operate in parallel at each stage. We present a mixed-integer programming (MIP) to analyze this novel integrated batching and lot streaming problem with variable sublots, incompatible job families, and sequence-dependent setup times. The model determines the number of sublots for each product, the size of each sublot, and the production sequencing for each sublot such that the sum of weighted completion time is minimized. Several numerical example problems are presented to validate the proposed formulation and to compare results with similar problems in the literature. Furthermore, an experimental design based on real industrial data is used to evaluate the performance of proposed model. Results indicate that the computational cost of solving the model is high

    An Integrated Solution Approach for Flow Shop Scheduling

    Get PDF
    This study seeks to integrate Random Key Genetic Algorithm (RKGA) and Technique for Order Preference by Similarity to an Ideal Solution (TOPSIS) to compute makespan and solve the Flow Shop Scheduling Problem (FSSP). FSSP is considered as a Multi Criteria Decision Making Problem (MCDM) by setting machines as criteria and jobs as alternatives. RKGA is employed to determine the best weights for the criteria that directly affect the robustness of the solution. The proposed methodology is presented with illustrative example and applied to benchmark problems. The solutions are compared to well-known construction heuristics. The proposed methodology provides the best or reasonable solutions in acceptable computational times

    Comparative simulation study of production scheduling in the hybrid and the parallel flow

    Get PDF
    Scheduling is one of the most important decisions in production control. An approach is proposed for supporting users to solve scheduling problems, by choosing the combination of physical manufacturing system configuration and the material handling system settings. The approach considers two alternative manufacturing scheduling configurations in a two stage product oriented manufacturing system, exploring the hybrid flow shop (HFS) and the parallel flow shop (PFS) environments. For illustrating the application of the proposed approach an industrial case from the automotive components industry is studied. The main aim of this research to compare results of study of production scheduling in the hybrid and the parallel flow, taking into account the makespan minimization criterion. Thus the HFS and the PFS performance is compared and analyzed, mainly in terms of the makespan, as the transportation times vary. The study shows that the performance HFS is clearly better when the work stations' processing times are unbalanced, either in nature or as a consequence of the addition of transport times just to one of the work station processing time but loses advantage, becoming worse than the performance of the PFS configuration when the work stations' processing times are balanced, either in nature or as a consequence of the addition of transport times added on the work stations' processing times. This means that physical layout configurations along with the way transport time are including the work stations' processing times should be carefully taken into consideration due to its influence on the performance reached by both HFS and PFS configurations.This work was supported by National Funds through FCT "Fundacao para a Ciencia e a Tecnologia" under the program: PEst2015-2020, ref. UID/CEC/00319/2013.info:eu-repo/semantics/publishedVersio

    Serial-batch scheduling – the special case of laser-cutting machines

    Get PDF
    The dissertation deals with a problem in the field of short-term production planning, namely the scheduling of laser-cutting machines. The object of decision is the grouping of production orders (batching) and the sequencing of these order groups on one or more machines (scheduling). This problem is also known in the literature as "batch scheduling problem" and belongs to the class of combinatorial optimization problems due to the interdependencies between the batching and the scheduling decisions. The concepts and methods used are mainly from production planning, operations research and machine learning

    A Linear Programming Model for Renewable Energy Aware Discrete Production Planning and Control

    Get PDF
    Industrial production in the EU, like other sectors of the economy, is obliged to stop producing greenhouse gas emissions by 2050. With its Green Deal, the European Union has already set the corresponding framework in 2019. To achieve Net Zero in the remaining time, while not endangering one's own competitiveness on a globalized market, a transformation of industrial value creation has to be started already today. In terms of energy supply, this means a comprehensive electrification of processes and a switch to fully renewable power generation. However, due to a growing share of renewable energy sources, increasing volatility can be observed in the European electricity market already. For companies, there are mainly two ways to deal with the accompanying increase in average electricity prices. The first is to reduce consumption by increasing efficiency, which naturally has its physical limits. Secondly, an increasing volatile electricity price makes it possible to take advantage of periods of relatively low prices. To do this, companies must identify their energy-intensive processes and design them in such a way as to enable these activities to be shifted in time. This article explains the necessary differentiation between labor-intensive and energy intensive processes. A general mathematical model for the holistic optimization of discrete industrial production is presented. With the help of this MILP model, it is simulated that a flexibilization of energy intensive processes with volatile energy prices can help to reduce costs and thus secure competitiveness while getting it in line with European climate goals. On the basis of real electricity market data, different production scenarios are compared, and it is investigated under which conditions the flexibilization of specific processes is worthwhile
    corecore