80 research outputs found

    Machine scheduling with deliveries to multiple customer locations

    Get PDF
    Department of Logistics, Faculty of Business2005-2006 > Academic research: refereed > Publication in refereed journalAccepted ManuscriptPublishe

    Loading and unloading operations in container terminals

    Get PDF
    Department of Logistics, Faculty of BusinessAuthor name used in this publication: George L. Vairaktarakis2003-2004 > Academic research: refereed > Publication in refereed journalAccepted ManuscriptPublishe

    Coordinating production and distribution of jobs with bundling operations

    Get PDF
    Department of Logistics2006-2007 > Academic research: refereed > Publication in refereed journalAccepted ManuscriptPublishe

    Comparative simulation study of production scheduling in the hybrid and the parallel flow

    Get PDF
    Scheduling is one of the most important decisions in production control. An approach is proposed for supporting users to solve scheduling problems, by choosing the combination of physical manufacturing system configuration and the material handling system settings. The approach considers two alternative manufacturing scheduling configurations in a two stage product oriented manufacturing system, exploring the hybrid flow shop (HFS) and the parallel flow shop (PFS) environments. For illustrating the application of the proposed approach an industrial case from the automotive components industry is studied. The main aim of this research to compare results of study of production scheduling in the hybrid and the parallel flow, taking into account the makespan minimization criterion. Thus the HFS and the PFS performance is compared and analyzed, mainly in terms of the makespan, as the transportation times vary. The study shows that the performance HFS is clearly better when the work stations' processing times are unbalanced, either in nature or as a consequence of the addition of transport times just to one of the work station processing time but loses advantage, becoming worse than the performance of the PFS configuration when the work stations' processing times are balanced, either in nature or as a consequence of the addition of transport times added on the work stations' processing times. This means that physical layout configurations along with the way transport time are including the work stations' processing times should be carefully taken into consideration due to its influence on the performance reached by both HFS and PFS configurations.This work was supported by National Funds through FCT "Fundacao para a Ciencia e a Tecnologia" under the program: PEst2015-2020, ref. UID/CEC/00319/2013.info:eu-repo/semantics/publishedVersio

    Decentralized subcontractor scheduling with divisible jobs

    Get PDF
    Subcontracting allows manufacturer agents to reduce completion times of their jobs and thus obtain savings. This paper addresses the coordination of decentralized scheduling systems with a single subcontractor and several agents having divisible jobs. Assuming complete information, we design parametric pricing schemes that strongly coordinate this decentralized system, i.e., the agents’ choices of subcontracting intervals always result in efficient schedules. The subcontractor’s revenue under the pricing schemes depends on a single parameter which can be chosen to make the revenue as close to the total savings as required. Also, we give a lower bound on the subcontractor’s revenue for any coordinating pricing scheme. Allowing private information about processing times, we prove that the pivotal mechanism is coordinating, i.e., agents are better off by reporting their true processing times, and by participating in the subcontracting. We show that the subcontractor’s maximum revenue with any coordinating mechanism under private information equals the lower bound of that with coordinating pricing schemes under complete information. Finally, we address the asymmetric case where agents obtain savings at different rates per unit reduction in completion times. We show that coordinating pricing schemes do not always exist in this case
    corecore