    BPGA-EDA for the multi-mode resource constrained project scheduling problem.

    Get PDF
    The Multi-mode Resource Constrained Project Scheduling Problem (MRCPSP) has been of research interest for over two decades. The problem is composed of two interacting sub problems: mode assignment and activity scheduling. These problems cannot be solved in isolation because of the interaction that exists between them. Many evolutionary algorithms have been applied to this problem most commonly the Genetic Algorithm (GA). It has been common practice to improve the performance of the GA with some local search techniques. The Bi-population Genetic Algorithm (BPGA) is one of the most competitive GAs for solving the MRCPSP. In this paper, we improve the BPGA by hybridising it with an Estimation of Distribution Algorithm that focuses on improving how modes are generated. We also suggest improvement to the existing experimental methodology

    The Project Scheduling Problem with Non-Deterministic Activities Duration: A Literature Review

    Get PDF
    Purpose: The goal of this article is to provide an extensive literature review of the models and solution procedures proposed by many researchers interested on the Project Scheduling Problem with nondeterministic activities duration. Design/methodology/approach: This paper presents an exhaustive literature review, identifying the existing models where the activities duration were taken as uncertain or random parameters. In order to get published articles since 1996, was employed the Scopus database. The articles were selected on the basis of reviews of abstracts, methodologies, and conclusions. The results were classified according to following characteristics: year of publication, mathematical representation of the activities duration, solution techniques applied, and type of problem solved. Findings: Genetic Algorithms (GA) was pointed out as the main solution technique employed by researchers, and the Resource-Constrained Project Scheduling Problem (RCPSP) as the most studied type of problem. On the other hand, the application of new solution techniques, and the possibility of incorporating traditional methods into new PSP variants was presented as research trends. Originality/value: This literature review contents not only a descriptive analysis of the published articles but also a statistical information section in order to examine the state of the research activity carried out in relation to the Project Scheduling Problem with non-deterministic activities duration.Peer Reviewe

    Solution and quality robust project scheduling: a methodological framework.

    Get PDF
    The vast majority of the research efforts in project scheduling over the past several years has concentrated on the development of exact and suboptimal procedures for the generation of a baseline schedule assuming complete information and a deterministic environment. During execution, however, projects may be the subject of considerable uncertainty, which may lead to numerous schedule disruptions. Predictive-reactive scheduling refers to the process where a baseline schedule is developed prior to the start of the project and updated if necessary during project execution. It is the objective of this paper to review possible procedures for the generation of proactive (robust) schedules, which are as well as possible protected against schedule disruptions, and for the deployment of reactive scheduling procedures that may be used to revise or re-optimize the baseline schedule when unexpected events occur. We also offer a methodological framework that should allow project management to identify the proper scheduling methodology for different project scheduling environments. Finally, we survey the basics of Critical Chain scheduling and indicate in which environments it is useful.Framework; Information; Management; Processes; Project management; Project scheduling; Project scheduling under uncertainty; Stability; Robust scheduling; Quality; Scheduling; Stability; Uncertainty;

    Project scheduling under undertainty – survey and research potentials.

    Get PDF
    The vast majority of the research efforts in project scheduling assume complete information about the scheduling problem to be solved and a static deterministic environment within which the pre-computed baseline schedule will be executed. However, in the real world, project activities are subject to considerable uncertainty, that is gradually resolved during project execution. In this survey we review the fundamental approaches for scheduling under uncertainty: reactive scheduling, stochastic project scheduling, stochastic GERT network scheduling, fuzzy project scheduling, robust (proactive) scheduling and sensitivity analysis. We discuss the potentials of these approaches for scheduling projects under uncertainty.Management; Project management; Robustness; Scheduling; Stability;

    Effective and efficient estimation of distribution algorithms for permutation and scheduling problems.

    Get PDF
    Estimation of Distribution Algorithm (EDA) is a branch of evolutionary computation that learn a probabilistic model of good solutions. Probabilistic models are used to represent relationships between solution variables which may give useful, human-understandable insights into real-world problems. Also, developing an effective PM has been shown to significantly reduce function evaluations needed to reach good solutions. This is also useful for real-world problems because their representations are often complex needing more computation to arrive at good solutions. In particular, many real-world problems are naturally represented as permutations and have expensive evaluation functions. EDAs can, however, be computationally expensive when models are too complex. There has therefore been much recent work on developing suitable EDAs for permutation representation. EDAs can now produce state-of-the-art performance on some permutation benchmark problems. However, models are still complex and computationally expensive making them hard to apply to real-world problems. This study investigates some limitations of EDAs in solving permutation and scheduling problems. The focus of this thesis is on addressing redundancies in the Random Key representation, preserving diversity in EDA, simplifying the complexity attributed to the use of multiple local improvement procedures and transferring knowledge from solving a benchmark project scheduling problem to a similar real-world problem. In this thesis, we achieve state-of-the-art performance on the Permutation Flowshop Scheduling Problem benchmarks as well as significantly reducing both the computational effort required to build the probabilistic model and the number of function evaluations. We also achieve competitive results on project scheduling benchmarks. Methods adapted for solving a real-world project scheduling problem presents significant improvements

    The Resource Leveling Problem with multiple resources using an adaptive genetic algorithm

    Full text link
    Resource management ensures that a project is completed on time and at cost, and that its quality is as previously defined; nevertheless, resources are scarce and their use in the activities of the project leads to conflicts in the schedule. Resource Leveling Problems consider how to make the resource consumption as efficient as possible. This paper presents a new Adaptive Genetic Algorithm for the Resource Leveling Problem with multiple resources, and its novelty lies in using the Weibull distribution to establish an estimation of the global optimum as a termination condition. The extension of the project deadline with a penalty is allowed, avoiding the increase in the project criticality punishing the shift of activities. The algorithmis tested with the standard Project Scheduling Problem Library PSPLIB, and a complete analysis and benchmarking test instances are presented. The proposed algorithm is implemented using VBA for Excel 2010 in order to provide a flexible and powerful decision support system that enables practitioners to choose between different feasible solutions to a problem, and in addition it is easily adjustable to the constraints and particular needs of each project in realistic environments.This study was partially funded by the Spanish Ministry of Science and Innovation (research project BIA2011-23602).Ponz Tienda, JL.; Yepes Piqueras, V.; Pellicer Armiñana, E.; Moreno Flores, J. (2013). The Resource Leveling Problem with multiple resources using an adaptive genetic algorithm. Automation in Construction. 29(1):161-172. doi:10.1016/j.autcon.2012.10.003S16117229

    Reactive scheduling to treat disruptive events in the MRCPSP

    Get PDF
    Esta tesis se centra en diseñar y desarrollar una metodología para abordar el MRCPSP con diversas funciones objetivo y diferentes tipos de interrupciones. En esta tesis se exploran el MRCPSP con dos funciones objetivo, a saber: (1) minimizar la duración del proyecto y (2) maximizar el valor presente neto del proyecto. Luego, se tiene en cuenta dos tipos diferentes de interrupciones, (a) interrupción de duración, e (b) interrupción de recurso renovable. Para resolver el MRCPSP, en esta tesis se proponen tres estrategias metaheurísticas: (1) algoritmo memético para minimizar la duración del proyecto, (2) algoritmo adaptativo de forrajeo bacteriano para maximizar el valor presente neto del proyecto y (3) algoritmo de optimización multiobjetivo de forrajeo bacteriano (MBFO) para resolver el MRCPSP con eventos de interrupción. Para juzgar el rendimiento del algoritmo memético y de forrajeo bacteriano propuestos, se ha llevado a cabo un extenso análisis basado en diseño factorial y diseño Taguchi para controlar y optimizar los parámetros del algoritmo. Además se han puesto a prueba resolviendo las instancias de los conjuntos más importantes en la literatura: PSPLIB (10,12,14,16,18,20 y 30 actividades) y MMLIB (50 y 100 actividades). También se ha demostrado la superioridad de los algoritmos metaheurísticos propuestos sobre otros enfoques heurísticos y metaheurísticos del estado del arte. A partir de los estudios experimentales se ha ajustado la MBFO, utilizando un caso de estudio.DoctoradoDoctor en Ingeniería Industria

    Fuzzy-multi-mode Resource-constrained Discrete Time-cost-resource Optimization in Project Scheduling Using ENSCBO

    Get PDF
    Construction companies are required to employ effective methods of project planning and scheduling in today's competitive environment. Time and cost are critical factors in project success, and they can vary based on the type and amount of resources used for activities, such as labor, tools, and materials. In addition, resource leveling strategies that are used to limit fluctuations in a project's resource consumption also affect project time and cost. The multi-mode resource-constrained discrete-time–cost-resource optimization (MRC-DTCRO) is an optimization tool that is developed for scheduling of a set of activities involving multiple execution modes with the aim of minimizing time, cost, and resource moment. Moreover, uncertainty in cost should be accounted for in project planning because activities are exposed to risks that can cause delays and budget overruns. This paper presents a fuzzy-multi-mode resource-constrained discrete-time–cost-resource optimization (F-MRC-DTCRO) model for the time-cost-resource moment tradeoff in a fuzzy environment while satisfying all the project constraints. In the proposed model, fuzzy numbers are used to characterize the uncertainty of direct cost of activities. Using this model, different risk acceptance levels of the decision maker can be addressed in the optimization process. A newly developed multi-objective optimization algorithm called ENSCBO is used to search non-dominated solutions to the fuzzy multi-objective model. Finally, the developed model is applied to solve a benchmark test problem. The results indicate that incorporating the fuzzy structure of uncertainty in costs to previously developed MRC-DTCRO models facilitates the decision-making process and provides more realistic solutions