95 research outputs found

    Approximating k-Forest with Resource Augmentation: A Primal-Dual Approach

    Full text link
    In this paper, we study the kk-forest problem in the model of resource augmentation. In the kk-forest problem, given an edge-weighted graph G(V,E)G(V,E), a parameter kk, and a set of mm demand pairs V×V\subseteq V \times V, the objective is to construct a minimum-cost subgraph that connects at least kk demands. The problem is hard to approximate---the best-known approximation ratio is O(min{n,k})O(\min\{\sqrt{n}, \sqrt{k}\}). Furthermore, kk-forest is as hard to approximate as the notoriously-hard densest kk-subgraph problem. While the kk-forest problem is hard to approximate in the worst-case, we show that with the use of resource augmentation, we can efficiently approximate it up to a constant factor. First, we restate the problem in terms of the number of demands that are {\em not} connected. In particular, the objective of the kk-forest problem can be viewed as to remove at most mkm-k demands and find a minimum-cost subgraph that connects the remaining demands. We use this perspective of the problem to explain the performance of our algorithm (in terms of the augmentation) in a more intuitive way. Specifically, we present a polynomial-time algorithm for the kk-forest problem that, for every ϵ>0\epsilon>0, removes at most mkm-k demands and has cost no more than O(1/ϵ2)O(1/\epsilon^{2}) times the cost of an optimal algorithm that removes at most (1ϵ)(mk)(1-\epsilon)(m-k) demands

    An approximation algorithm to the k-Steiner Forest problem

    Get PDF
    AbstractGiven a graph G, an integer k, and a demand set D={(s1,t1),…,(sl,tl)}, the k-Steiner Forest problem finds a forest in graph G to connect at least k demands in D such that the cost of the forest is minimized. This problem was proposed by Hajiaghayi and Jain in SODA’06. Thereafter, using a Lagrangian relaxation technique, Segev et al. gave the first approximation algorithm to this problem in ESA’06, with performance ratio O(n2/3logl). We give a simpler and faster approximation algorithm to this problem with performance ratio O(n2/3logk) via greedy approach, improving the previously best known ratio in the literature

    Dial a Ride from k-forest

    Full text link
    The k-forest problem is a common generalization of both the k-MST and the dense-kk-subgraph problems. Formally, given a metric space on nn vertices VV, with mm demand pairs V×V\subseteq V \times V and a ``target'' kmk\le m, the goal is to find a minimum cost subgraph that connects at least kk demand pairs. In this paper, we give an O(min{n,k})O(\min\{\sqrt{n},\sqrt{k}\})-approximation algorithm for kk-forest, improving on the previous best ratio of O(n2/3logn)O(n^{2/3}\log n) by Segev & Segev. We then apply our algorithm for k-forest to obtain approximation algorithms for several Dial-a-Ride problems. The basic Dial-a-Ride problem is the following: given an nn point metric space with mm objects each with its own source and destination, and a vehicle capable of carrying at most kk objects at any time, find the minimum length tour that uses this vehicle to move each object from its source to destination. We prove that an α\alpha-approximation algorithm for the kk-forest problem implies an O(αlog2n)O(\alpha\cdot\log^2n)-approximation algorithm for Dial-a-Ride. Using our results for kk-forest, we get an O(min{n,k}log2n)O(\min\{\sqrt{n},\sqrt{k}\}\cdot\log^2 n)- approximation algorithm for Dial-a-Ride. The only previous result known for Dial-a-Ride was an O(klogn)O(\sqrt{k}\log n)-approximation by Charikar & Raghavachari; our results give a different proof of a similar approximation guarantee--in fact, when the vehicle capacity kk is large, we give a slight improvement on their results.Comment: Preliminary version in Proc. European Symposium on Algorithms, 200

    New approaches to multi-objective optimization

    Get PDF
    A natural way to deal with multiple, partially conflicting objectives is turning all the objectives but one into budget constraints. Many classical optimization problems, such as maximum spanning tree and forest, shortest path, maximum weight (perfect) matching, maximum weight independent set (basis) in a matroid or in the intersection of two matroids, become NP-hard even with one budget constraint. Still, for most of these problems efficient deterministic and randomized approximation schemes are known. Not much is known however about the case of two or more budgets: filling this gap, at least partially, is the main goal of this paper. In more detail, we obtain the following main results: Using iterative rounding for the first time in multi-objective optimization, we obtain multi-criteria PTASs (which slightly violate the budget constraints) for spanning tree, matroid basis, and bipartite matching with k=O(1)k=O(1) k = O ( 1 ) budget constraints. We present a simple mechanism to transform multi-criteria approximation schemes into pure approximation schemes for problems whose feasible solutions define an independence system. This gives improved algorithms for several problems. In particular, this mechanism can be applied to the above bipartite matching algorithm, hence obtaining a pure PTAS. We show that points in low-dimensional faces of any matroid polytope are almost integral, an interesting result on its own. This gives a deterministic approximation scheme for kk k -budgeted matroid independent set. We present a deterministic approximation scheme for kk k -budgeted matching (in general graphs), where k=O(1)k=O(1) k = O ( 1 ) . Interestingly, to show that our procedure works, we rely on a non-constructive result by Stromquist and Woodall, which is based on the Ham Sandwich Theorem

    Algorithmic Approaches to the Steiner Problem in Networks

    Full text link
    Das Steinerproblem in Netzwerken ist das Problem, in einem gewichteten Graphen eine gegebene Menge von Knoten kostenminimal zu verbinden. Es ist ein klassisches NP-schweres Problem und ein fundamentales Problem bei der Netzwerkoptimierung mit vielen praktischen Anwendungen. Wir nehmen dieses Problem mit verschiedenen Mitteln in Angriff: Relaxationen, die die Zulässigkeitsbedingungen lockern, um eine optimale Lösung annähern zu können; Heuristiken, um gute, aber nicht garantiert optimale Lösungen zu finden; und Reduktionen, um die Probleminstanzen zu vereinfachen, ohne eine optimale Lösung zu zerstören. In allen Fällen untersuchen und verbessern wir bestehende Methoden, stellen neue vor und evaluieren sie experimentell. Wir integrieren diese Bausteine in einen exakten Algorithmus, der den Stand der Algorithmik für die optimale Lösung dieses Problems darstellt. Viele der vorgestellten Methoden können auch für verwandte Probleme von Nutzen sein

    15th Scandinavian Symposium and Workshops on Algorithm Theory: SWAT 2016, June 22-24, 2016, Reykjavik, Iceland

    Get PDF

    LIPIcs, Volume 244, ESA 2022, Complete Volume

    Get PDF
    LIPIcs, Volume 244, ESA 2022, Complete Volum

    The Optimum Communication Spanning Tree Problem : properties, models and algorithms

    Get PDF
    For a given cost matrix and a given communication requirement matrix, the OCSTP is defined as finding a spanning tree that minimizes the operational cost of the network. OCST can be used to design of more efficient communication and transportation networks, but appear also, as a subproblem, in hub location and sequence alignment problems. This thesis studies several mixed integer linear optimization formulations of the OCSTP and proposes a new one. Then, an efficient Branch & Cut algorithm derived from the Benders decomposition of one of such formulations is used to successfully solve medium-sized instances of the OCSTP. Additionally, two new combinatorial lower bounds, two new heuristic algorithms and a new family of spanning tree neighborhoods based on the Dandelion Code are presented and tested.Postprint (published version

    Multicommodity Facility Location under Group Steiner Access Cost

    Full text link
    corecore