85 research outputs found

    A Simulation-Based Optimization Approach for Integrated Port Resource Allocation Problem

    Get PDF
    Todays, due to the rapid increase in shipping volumes, the container terminals are faced with the challenge to cope with these increasing demands. To handle this challenge, it is crucial to use flexible and efficient optimization approach in order to decrease operating cost. In this paper, a simulation-based optimization approach is proposed to construct a near-optimal berth allocation plan integrated with a plan for tug assignment and for resolution of the quay crane re-allocation problem. The research challenges involve dealing with the uncertainty in arrival times of vessels as well as tidal variations. The effectiveness of the proposed evolutionary algorithm is tested on RAJAEE Port as a real case. According to the simulation result, it can be concluded that the objective function value is affected significantly by the arrival disruptions. The result also demonstrates the effectiveness of the proposed simulation-based optimization approach. </span

    A genetic algorithm for robust berth allocation and quay crane assignment

    Get PDF
    Scheduling problems usually obtain the optimal solutions assuming that the environment is deterministic. However, actually the environment is dynamic and uncertain. Thus, the initial data could change and the initial schedule obtained might be unfeasible. To overcome this issue, a proactive approach is presented for scheduling problems without any previous knowledge about the incidences that can occur. In this paper, we consider the berth allocation problem and the quay crane assignment problem as a representative example of scheduling problems where a typical objective is to minimize the service time. The robustness is introduced within this problem by means of buffer times that should be maximized to absorb possible incidences or breakdowns. Therefore, this problem becomes a multi-objective optimization problem with two opposite objectives: minimizing the total service time and maximizing the robustness or buffer time

    Optimization and Robustness in Planning and Scheduling Problems. Application to Container Terminals

    Full text link
    Tesis por compendioDespite the continuous evolution in computers and information technology, real-world combinatorial optimization problems are NP-problems, in particular in the domain of planning and scheduling. Thus, although exact techniques from the Operations Research (OR) field, such as Linear Programming, could be applied to solve optimization problems, they are difficult to apply in real-world scenarios since they usually require too much computational time, i.e: an optimized solution is required at an affordable computational time. Furthermore, decision makers often face different and typically opposing goals, then resulting multi-objective optimization problems. Therefore, approximate techniques from the Artificial Intelligence (AI) field are commonly used to solve the real world problems. The AI techniques provide richer and more flexible representations of real-world (Gomes 2000), and they are widely used to solve these type of problems. AI heuristic techniques do not guarantee the optimal solution, but they provide near-optimal solutions in a reasonable time. These techniques are divided into two broad classes of algorithms: constructive and local search methods (Aarts and Lenstra 2003). They can guide their search processes by means of heuristics or metaheuristics depending on how they escape from local optima (Blum and Roli 2003). Regarding multi-objective optimization problems, the use of AI techniques becomes paramount due to their complexity (Coello Coello 2006). Nowadays, the point of view for planning and scheduling tasks has changed. Due to the fact that real world is uncertain, imprecise and non-deterministic, there might be unknown information, breakdowns, incidences or changes, which become the initial plans or schedules invalid. Thus, there is a new trend to cope these aspects in the optimization techniques, and to seek robust solutions (schedules) (Lambrechts, Demeulemeester, and Herroelen 2008). In this way, these optimization problems become harder since a new objective function (robustness measure) must be taken into account during the solution search. Therefore, the robustness concept is being studied and a general robustness measure has been developed for any scheduling problem (such as Job Shop Problem, Open Shop Problem, Railway Scheduling or Vehicle Routing Problem). To this end, in this thesis, some techniques have been developed to improve the search of optimized and robust solutions in planning and scheduling problems. These techniques offer assistance to decision makers to help in planning and scheduling tasks, determine the consequences of changes, provide support in the resolution of incidents, provide alternative plans, etc. As a case study to evaluate the behaviour of the techniques developed, this thesis focuses on problems related to container terminals. Container terminals generally serve as a transshipment zone between ships and land vehicles (trains or trucks). In (Henesey 2006a), it is shown how this transshipment market has grown rapidly. Container terminals are open systems with three distinguishable areas: the berth area, the storage yard, and the terminal receipt and delivery gate area. Each one presents different planning and scheduling problems to be optimized (Stahlbock and Voß 2008). For example, berth allocation, quay crane assignment, stowage planning, and quay crane scheduling must be managed in the berthing area; the container stacking problem, yard crane scheduling, and horizontal transport operations must be carried out in the yard area; and the hinterland operations must be solved in the landside area. Furthermore, dynamism is also present in container terminals. The tasks of the container terminals take place in an environment susceptible of breakdowns or incidences. For instance, a Quay Crane engine stopped working and needs to be revised, delaying this task one or two hours. Thereby, the robustness concept can be included in the scheduling techniques to take into consideration some incidences and return a set of robust schedules. In this thesis, we have developed a new domain-dependent planner to obtain more effi- cient solutions in the generic problem of reshuffles of containers. Planning heuristics and optimization criteria developed have been evaluated on realistic problems and they are applicable to the general problem of reshuffling in blocks world scenarios. Additionally, we have developed a scheduling model, using constructive metaheuristic techniques on a complex problem that combines sequences of scenarios with different types of resources (Berth Allocation, Quay Crane Assignment, and Container Stacking problems). These problems are usually solved separately and their integration allows more optimized solutions. Moreover, in order to address the impact and changes that arise in dynamic real-world environments, a robustness model has been developed for scheduling tasks. This model has been applied to metaheuristic schemes, which are based on genetic algorithms. The extension of such schemes, incorporating the robustness model developed, allows us to evaluate and obtain more robust solutions. This approach, combined with the classical optimality criterion in scheduling problems, allows us to obtain, in an efficient in way, optimized solution able to withstand a greater degree of incidents that occur in dynamic scenarios. Thus, a proactive approach is applied to the problem that arises with the presence of incidences and changes that occur in typical scheduling problems of a dynamic real world.Rodríguez Molins, M. (2015). Optimization and Robustness in Planning and Scheduling Problems. Application to Container Terminals [Tesis doctoral no publicada]. Universitat Politècnica de València. https://doi.org/10.4995/Thesis/10251/48545TESISCompendi

    Bi-objective Recoverable Berth Allocation and Quay Crane Assignment Planning under Environmental Uncertainty

    Get PDF
    This study discusses the development of tactical-level integrated planning at seaport container terminals in an uncertain environment. The suggested approach seeks to strike a balance between the cost-effectiveness of a robust baseline schedule and recovery plan and the required quality of customer service in order to enhance the competitive edge of container ports. Integrated planning for a tactical level at the container terminal synchronizes the decisions of berth allocation and quay crane assignment planning by taking into account the unpredictability of the vessel's arrival time and handling time caused by a variety of unforeseen factors such as unfavorable weather conditions, instability in the productivity rate of the quay cranes, the uncertainty of the quantity of loading and discharging containers, and other unpredictable events. The proposed optimization model produces a robust and proactive baseline schedule with a recoverable reactive plan for each scenario that occurs by utilizing buffer times and quay cranes that anticipate fluctuations in uncertain parameters. The proposed bi-objective recoverable robustness optimization model is solved by applying a hybrid method, namely the Rolling Horizon-based Optimization Algorithm (RHOA) and the Preemptive Goal Programming approach, using Gurobi-Python Optimization. The proposed bi-objective recoverable robust optimization model demonstrates superior solution quality in terms of service level and total costs, as well as a more efficient computational time when compared to an optimization model that minimizes total costs for tactical level planning decisions in seaside container terminals

    Robust scheduling for Berth Allocation and Quay Crane Assignment Problem

    Full text link
    [EN] Decision makers must face the dynamism and uncertainty of real-world environments when they need to solve the scheduling problems. Different incidences or breakdowns, for example, initial data could change or some resources could become unavailable, may eventually cause the infeasibility of the obtained schedule. To overcome this issue, a robust model and a proactive approach are presented for scheduling problems without any previous knowledge about incidences. This paper is based on proportionally distributing operational buffers among the tasks. In this paper, we consider the berth allocation problem and the quay crane assignment problem as a representative example of scheduling problems. The dynamism and uncertainty are managed by assessing the robustness of the schedules. The robustness is introduced by means of operational buffer times to absorb those unknown incidences or breakdowns. Therefore, this problem becomes a multiobjective combinatorial optimization problem that aims to minimize the total service time, to maximize the buffer times, and to minimize the standard deviation of the buffer times. To this end, a mathematical model and a new hybrid multiobjective metaheuristic is presented and compared with two well-known multiobjective genetic algorithms: NSGAII and SPEA2+.This work has been partially supported by by the Spanish Government under research project MINECO TIN2013-46511-C2-1-P, the project PIRSES-GA-2011-294931 (FP7-PEOPLE-2011-IRSES), and the predoctoral FPU fellowship (AP2010-4405).Rodríguez Molins, M.; Salido Gregorio, MA.; Barber Sanchís, F. (2014). Robust scheduling for Berth Allocation and Quay Crane Assignment Problem. Mathematical Problems in Engineering. 2014(1):1-17. https://doi.org/10.1155/2014/834927S11720141Imai, A., Chen, H. C., Nishimura, E., & Papadimitriou, S. (2008). The simultaneous berth and quay crane allocation problem. Transportation Research Part E: Logistics and Transportation Review, 44(5), 900-920. doi:10.1016/j.tre.2007.03.003Hu, Q.-M., Hu, Z.-H., & Du, Y. (2014). Berth and quay-crane allocation problem considering fuel consumption and emissions from vessels. Computers & Industrial Engineering, 70, 1-10. doi:10.1016/j.cie.2014.01.003Salido, M. A., Rodriguez-Molins, M., & Barber, F. (2011). Integrated intelligent techniques for remarshaling and berthing in maritime terminals. Advanced Engineering Informatics, 25(3), 435-451. doi:10.1016/j.aei.2010.10.001Rodriguez-Molins, M., Salido, M. A., & Barber, F. (2013). A GRASP-based metaheuristic for the Berth Allocation Problem and the Quay Crane Assignment Problem by managing vessel cargo holds. Applied Intelligence, 40(2), 273-290. doi:10.1007/s10489-013-0462-4Stahlbock, R., & Voß, S. (2007). Operations research at container terminals: a literature update. OR Spectrum, 30(1), 1-52. doi:10.1007/s00291-007-0100-9Lim, A. (1998). The berth planning problem. Operations Research Letters, 22(2-3), 105-110. doi:10.1016/s0167-6377(98)00010-8Bierwirth, C., & Meisel, F. (2010). A survey of berth allocation and quay crane scheduling problems in container terminals. European Journal of Operational Research, 202(3), 615-627. doi:10.1016/j.ejor.2009.05.031Kim, K. H., & Moon, K. C. (2003). Berth scheduling by simulated annealing. Transportation Research Part B: Methodological, 37(6), 541-560. doi:10.1016/s0191-2615(02)00027-9Giallombardo, G., Moccia, L., Salani, M., & Vacca, I. (2010). Modeling and solving the Tactical Berth Allocation Problem. Transportation Research Part B: Methodological, 44(2), 232-245. doi:10.1016/j.trb.2009.07.003Liang, C., Guo, J., & Yang, Y. (2009). Multi-objective hybrid genetic algorithm for quay crane dynamic assignment in berth allocation planning. Journal of Intelligent Manufacturing, 22(3), 471-479. doi:10.1007/s10845-009-0304-8Diabat, A., & Theodorou, E. (2014). An Integrated Quay Crane Assignment and Scheduling Problem. Computers & Industrial Engineering, 73, 115-123. doi:10.1016/j.cie.2013.12.012Park, Y.-M., & Kim, K. H. (2003). A scheduling method for Berth and Quay cranes. OR Spectrum, 25(1), 1-23. doi:10.1007/s00291-002-0109-zZhang, C., Zheng, L., Zhang, Z., Shi, L., & Armstrong, A. J. (2010). The allocation of berths and quay cranes by using a sub-gradient optimization technique. Computers & Industrial Engineering, 58(1), 40-50. doi:10.1016/j.cie.2009.08.002Lambrechts, O., Demeulemeester, E., & Herroelen, W. (2007). Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities. Journal of Scheduling, 11(2), 121-136. doi:10.1007/s10951-007-0021-0Hendriks, M., Laumanns, M., Lefeber, E., & Udding, J. T. (2010). Robust cyclic berth planning of container vessels. OR Spectrum, 32(3), 501-517. doi:10.1007/s00291-010-0198-zHan, X., Lu, Z., & Xi, L. (2010). A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic arrival and handling time. European Journal of Operational Research, 207(3), 1327-1340. doi:10.1016/j.ejor.2010.07.018Xu, Y., Chen, Q., & Quan, X. (2011). Robust berth scheduling with uncertain vessel delay and handling time. Annals of Operations Research, 192(1), 123-140. doi:10.1007/s10479-010-0820-0Zhen, L., & Chang, D.-F. (2012). A bi-objective model for robust berth allocation scheduling. Computers & Industrial Engineering, 63(1), 262-273. doi:10.1016/j.cie.2012.03.003Blum, C., Puchinger, J., Raidl, G. R., & Roli, A. (2011). Hybrid metaheuristics in combinatorial optimization: A survey. Applied Soft Computing, 11(6), 4135-4151. doi:10.1016/j.asoc.2011.02.032Ehrgott, M., & Gandibleux, X. (2008). Hybrid Metaheuristics for Multi-objective Combinatorial Optimization. Studies in Computational Intelligence, 221-259. doi:10.1007/978-3-540-78295-7_8Hanafi, R., & Kozan, E. (2014). A hybrid constructive heuristic and simulated annealing for railway crew scheduling. Computers & Industrial Engineering, 70, 11-19. doi:10.1016/j.cie.2014.01.002Deb, K., Pratap, A., Agarwal, S., & Meyarivan, T. (2002). A fast and elitist multiobjective genetic algorithm: NSGA-II. IEEE Transactions on Evolutionary Computation, 6(2), 182-197. doi:10.1109/4235.996017Kim, M., Hiroyasu, T., Miki, M., & Watanabe, S. (2004). SPEA2+: Improving the Performance of the Strength Pareto Evolutionary Algorithm 2. Parallel Problem Solving from Nature - PPSN VIII, 742-751. doi:10.1007/978-3-540-30217-9_75Rodriguez-Molins, M., Ingolotti, L., Barber, F., Salido, M. A., Sierra, M. R., & Puente, J. (2014). A genetic algorithm for robust berth allocation and quay crane assignment. Progress in Artificial Intelligence, 2(4), 177-192. doi:10.1007/s13748-014-0056-3Zhou, A., Qu, B.-Y., Li, H., Zhao, S.-Z., Suganthan, P. N., & Zhang, Q. (2011). Multiobjective evolutionary algorithms: A survey of the state of the art. Swarm and Evolutionary Computation, 1(1), 32-49. doi:10.1016/j.swevo.2011.03.001Bandyopadhyay, S., Saha, S., Maulik, U., & Deb, K. (2008). A Simulated Annealing-Based Multiobjective Optimization Algorithm: AMOSA. IEEE Transactions on Evolutionary Computation, 12(3), 269-283. doi:10.1109/tevc.2007.900837While, L., Bradstreet, L., & Barone, L. (2012). A Fast Way of Calculating Exact Hypervolumes. IEEE Transactions on Evolutionary Computation, 16(1), 86-95. doi:10.1109/tevc.2010.207729

    The synergistic effect of operational research and big data analytics in greening container terminal operations: a review and future directions

    Get PDF
    Container Terminals (CTs) are continuously presented with highly interrelated, complex, and uncertain planning tasks. The ever-increasing intensity of operations at CTs in recent years has also resulted in increasing environmental concerns, and they are experiencing an unprecedented pressure to lower their emissions. Operational Research (OR), as a key player in the optimisation of the complex decision problems that arise from the quay and land side operations at CTs, has been therefore presented with new challenges and opportunities to incorporate environmental considerations into decision making and better utilise the ‘big data’ that is continuously generated from the never-stopping operations at CTs. The state-of-the-art literature on OR's incorporation of environmental considerations and its interplay with Big Data Analytics (BDA) is, however, still very much underdeveloped, fragmented, and divergent, and a guiding framework is completely missing. This paper presents a review of the most relevant developments in the field and sheds light on promising research opportunities for the better exploitation of the synergistic effect of the two disciplines in addressing CT operational problems, while incorporating uncertainty and environmental concerns efficiently. The paper finds that while OR has thus far contributed to improving the environmental performance of CTs (rather implicitly), this can be much further stepped up with more explicit incorporation of environmental considerations and better exploitation of BDA predictive modelling capabilities. New interdisciplinary research at the intersection of conventional CT optimisation problems, energy management and sizing, and net-zero technology and energy vectors adoption is also presented as a prominent line of future research

    Real Time Recovery in Berth Allocation Problem in Bulk Ports

    Get PDF
    El actor español Cosme Pérez constituye un caso único en la historia del teatro. Tras crear el personaje de Juan Rana, a comienzos de la década de los años treinta del siglo xvii (única auténtica máscara, equiparable a las de la commedia dell'arte italiana, del teatro español), actor y personaje llegaron a fundirse de tal manera que el público ya no pudo concebir la posibilidad de que otro actor "se atreviera" a interpretarlo. Tras la muerte de Cosme, la extraordinaria fama alcanzada por Rana durante casi cuarenta años sobre las tablas motivó a algunos dramaturgos a intentar resucitarlo escénicamente, para perpetuar su éxito. En este articulo se estudian esos intentos, la suerte que corrieron y las consecuencias que el paso del tiempo tuvo en él, convirtiéndolo en un personaje diverso al primigenio

    HADES: A multi-agent platform to reduce congestion anchoring based on temporal coordination of vessel arrivals—application to the multi-client liquid bulk terminal in the Port of Cartagena (Spain)

    Get PDF
    Ports are key factors in international trade, and new port terminals are quite costly and time consuming to build. Therefore, it is necessary to optimize existing infrastructure to achieve sustainability in logistics. This problem is more complex in multi-client port terminals, where quay infrastructure is shared among terminal operators who often have conflicting interests. Moreover, the berth allocation problem in liquid bulk terminals implies demanding restrictions due to the reduced flexibility in berth allocation for these types of goods. In this context, this paper presents HADES, a multi-agent platform, and the experience of its pilot use in the Port of Cartagena. HADES is a software platform where agents involved in vessel arrivals share meaningful but limited information. This is done to alleviate potential congestion in multi-client liquid bulk terminals, promoting a consensus where overall congestion anchoring is reduced. A study is presented using a mixed integer linear program (MILP) optimization model to analyze the maximum theoretical reduction in congestion anchoring, depending on the flexibility of vessel arrival time changes. Results show that 6 h of flexibility is enough to reduce congestion anchoring by half, and 24 h reduces it to negligible values. This confirms the utility of HADES, which is also briefly described.The authors would like to thank Port Authority of Cartagena for data supplied, and terminal operators of docks E010 and E011 for their suggestions

    Exact and Heuristic Methods for Integrated Container Terminal Problems

    Get PDF