3,271 research outputs found

    Thanks, but no thanks: women's avoidance of help-seeking in the context of a dependency-related stereotype

    Get PDF
    The stereotype that women are dependent on men is a commonly verbalized, potentially damaging aspect of benevolent sexism. We investigated how women may use behavioral disconfirmation of the personal applicability of the stereotype to negotiate such sexism. In an experiment (N = 86), we manipulated female college students’ awareness that women may be stereotyped by men as dependent. We then placed participants in a situation where they needed help. Women made aware of the dependency stereotype (compared to controls who were not) were less willing to seek help. They also displayed a stronger negative correlation between help-seeking and post help-seeking affect - such that the more help they sought, the worse they felt. We discuss the relevance of these findings for research concerning women’s help-seeking and their management of sexist stereotyping in everyday interaction. We also consider the implications of our results for those working in domains such as healthcare, teaching and counseling, where interaction with individuals in need and requiring help is common

    The impact of construction commencement intervals on residential production building

    Get PDF
    One model of operation that production builders can use is continuous construction. They build typical house models and generally work with the same subcontractors. In this continuous operation, an order from the sales department triggers the process, which only commences construction when the first required crew becomes available. In this system the decision to commence construction relies on the readiness of the first activity. However the effects of this decision on the whole construction process are often ignored. This research aims to shed light on the importance of construction commencement decisions by highlighting the consequences of this decision on the whole production system

    Framework for improving workflow stability: deployment of optimized capacity buffers in a synchronized construction production

    Get PDF
    Construction sites are dynamic environments due to the influence of variables such as changes in design and processes, unsteady demand, and unavailability of trades. These variables adversely affect productivity and can cause an unstable workflow in the network of trade contractors. Previous research on workflow stability in the construction and manufacturing domains has shown the effectiveness of 'pull' production or 'rate driven' construction. Pull systems authorize the start of construction when a job is completed and leaves the trade contractor network. However, the problem with pull systems is that completion dates are not explicitly considered and therefore additional mechanisms are required to ensure the due date integrity. On this basis, the aim of this investigation is to improve the coordination between output and demand using optimal-sized capacity buffers. Towards this aim, production data of two Australian construction companies were collected and analyzed. Capacity and cost optimizations were conducted to find the optimum buffer that strikes the balance between late completion costs and lost revenue opportunity. Following this, simulation experiments were designed and run to analyze different 'what-if' production scenarios. The findings show that capacity buffers enable builders to ensure a desired service level. Size of the capacity buffer is more sensitive to the level of variability in contractor processes than other production variables. This work contributes to the body-of-knowledge by improving production control in constructionanddeploymentof capacity buffers to achieve a stableworkflow.In addition, constructioncompaniescanuse the easy-to-use framework tested in this study to compute the optimal size for capacity buffers that maximizes profit and prevents late completions

    A new approach for modelling variability in residential construction projects

    Get PDF
    The construction industry is plagued by long cycle times caused by variability in the supply chain. Variations or undesirable situations are the result of factors such as non-standard practices, work site accidents, inclement weather conditions and faults in design. This paper uses a new approach for modelling variability in construction by linking relative variability indicators to processes. Mass homebuilding sector was chosen as the scope of the analysis because data is readily available. Numerous simulation experiments were designed by varying size of capacity buffers in front of trade contractors, availability of trade contractors, and level of variability in homebuilding processes. The measurements were shown to lead to an accurate determination of relationships between these factors and production parameters. The variability indicator was found to dramatically affect the tangible performance measures such as home completion rates. This study provides for future analysis of the production homebuilding sector, which may lead to improvements in performance and a faster product delivery to homebuyers

    Analysis of disruptions caused by construction field rework on productivity in residential projects

    Get PDF
    Operational performance in residential construction production systems is assessed based on measures such as average house-completion time, number of houses under construction, lead time, and customer service. These systems, however, are prone to nonuniformity and interruptions caused by a wide range of variables such as inclement weather conditions, accidents at worksites, fluctuations in demand for houses, and rework. The availability and capacity of resources therefore are not the sole measures for evaluating construction production systems capacity, especially when rework is involved. The writers’ aim is to investigate the effects of rework timeframe and frequency/length on tangible performance measures. Different call-back timeframes for rework and their impact on house-completion times are modeled and analyzed. Volume home-building was chosen as the industry sector studied in the research reported in this paper because it is a data-rich environment. The writers designed several experiments to model on time, late, and early call-back timeframes in the presence of rework with different length and frequency. Both mathematical modeling and discrete-event simulation were then used to compare and contrast outputs. The measurements showed that the average completion time is shorter in systems interrupted by frequent but short rework. In other words, a smaller downstream buffer between processes is required to avoid work starvation than those systems affected by infrequent but long interruptions. Early call-backs for rework can significantly increase the number of house completions over the long run. This indicates that there is an opportunity for the mass house-building sector to improve work practice and project delivery by effectively managing rework and its related variables. The research reported in this paper builds on the current body-of-knowledge by applying even-flow production theory to the analysis of rework in the residential construction sector, with the intention of ensuring minimal disruption to construction production process and improving productivity

    Metatarsophalangeal joint pain in psoriatic arthritis: a cross-sectional study

    Get PDF
    Methods. Thirty-four consecutive patients with PsA (mean age 45.3 years, 65% female, mean disease duration 9.9 years) and 22 control participants (mean age 37.9 years, 64% female) underwent clinical and US examination to determine the presence of pain, swelling, synovitis, erosions, effusions and submetatarsal bursae at the MTP joints. Mean barefoot peak plantar pressures were determined at each MTP joint. Levels of pain, US-determined pathology and peak pressures were compared between groups. Binary logistic regression was used to identify demographic, clinical examination-derived, US-derived and plantar pressure predictors of pain at the MTP joints in the PsA group. Results. The presence of pain, deformity, synovitis, erosions (P < 0.001) and submetatarsal bursae and peak plantar pressure at MTP 3 (P < 0.05) were significantly higher in the PsA group. MTP joint pain in PsA was independently predicted by high BMI, female gender and the presence of joint subluxation, synovitis and erosion. Conclusion. These results suggest local inflammatory and structural factors, together with systemic factors (gender, BMI), are predominantly responsible for painful MTP joints in PsA, with no clear role for plantar pressure characteristics

    Bulletin 570T Timothy

    Get PDF

    Dinosaur tracks from the Kilmaluag Formation (Bathonian, Middle Jurassic) of Score Bay, Isle of Skye, Scotland, UK

    Get PDF
    Tracks of a juvenile theropod dinosaur with footprint lengths of between 2 and 9 cm as well as adults of the same ichnospecies with footprints of about 15–25 cm in length were found in the Bathonian (Middle Jurassic) Kilmaluag Formation of Score Bay, northwestern Trotternish Peninsula, Isle of Skye, Scotland, UK. Two footprint sizes occur together on the same bedding plane in the central portion of Score Bay, both in situ and on loose blocks. Another horizon containing footprints above this was also identified. The footprints from the lowest horizon were produced in a desiccated silty mud that was covered with sand. A close association of both adults and juveniles with similar travel direction indicated by the footprints may suggest post-hatching care in theropod dinosaurs. Other footprints, produced on a rippled sandy substrate, have been found on the slightly higher bedding plane at this locality. Loose blocks found 130 m to the northeast in the central part of Score Bay have not been correlated with any in situ sediments, but were preserved in a similar manner to those from the higher bedding plane. These tracks represent the youngest dinosaur remains yet found in Scotland

    Ontologies, Mental Disorders and Prototypes

    Get PDF
    As it emerged from philosophical analyses and cognitive research, most concepts exhibit typicality effects, and resist to the efforts of defining them in terms of necessary and sufficient conditions. This holds also in the case of many medical concepts. This is a problem for the design of computer science ontologies, since knowledge representation formalisms commonly adopted in this field do not allow for the representation of concepts in terms of typical traits. However, the need of representing concepts in terms of typical traits concerns almost every domain of real world knowledge, including medical domains. In particular, in this article we take into account the domain of mental disorders, starting from the DSM-5 descriptions of some specific mental disorders. On this respect, we favor a hybrid approach to the representation of psychiatric concepts, in which ontology oriented formalisms are combined to a geometric representation of knowledge based on conceptual spaces
    • 

    corecore