76 research outputs found

    Site Report ,Stage One : Site Reports on Kevin Street and Camden Row Sites

    Get PDF
    Report produced to quantify the cost difference between the Kevin Street and Camden Row sites. Contains architect\u27s, quantity surveyor\u27s, structural, mechanical and electrical engineer\u27s reports. Note : Date is approximat

    The role of quantity surveyors in public–private partnerships in South Africa

    Get PDF
    Background: Quantity surveyors play an important role in providing cost and contractual advice in the built environment. This article seeks to investigate the current extent of their involvement in public–private partnerships (PPPs) in South Africa. Aim: The study intends to establish factors that influence quantity surveyors’ participation in PPPs. Methodology: A mixed-methods research approach was followed by firstly conducting a survey amongst South African quantity surveyors in order to determine their level of participation in PPPs. For triangulation purposes, a case study was also conducted. Results: The results of the research show that, although quantity surveyors have the corresponding skills and competencies required in a PPP project, their current involvement in PPPs in South Africa is limited and that there is a greater role they can play in future. Conclusion: Quantity surveyors are uniquely positioned to play a bigger role in the implementation of PPPs in South Africa

    Design development post contract signing in New Zealand:Client's or contractor's cost?

    Get PDF
    By offering fixed-price contracts for designs supplied by clients, contractors legally warrant that they can build what has been designed and do so within their fixed price. Yet detailed drawings are often issued during construction in response to contractors' requests for information on the basis that they cannot otherwise build what has been designed. Claim-entitlement decisions are often made by construction professionals (architects, engineers and quantity surveyors) without legal training in contractual interpretation, potentially varying who pays for design development after contract signing, contractors or clients. Prior studies have addressed buildability obligations relating to ground conditions and foundations. This study applies key principles of contract law to consider who should pay for instructed drawing details post contract signing under the New Zealand standard NZS 3910:2013, 'Conditions of contract for building and civil engineering construction', in terms of (a) when a variation claim may be accepted; (b) the effect of contractor involvement on design development; and (c) the effect if claimed from a building subcontractor to a consultant manager (no head contractor). A claim-entitlement flow chart and a table comparing the head contractor's and consultant construction manager's obligations provide practical guides for contract administrators. Identifying terms prone to interpretation informs contract drafters towards reducing ambiguity for contract users and therefore the potential for dispute

    The Importance of Getting Names Right: The Myth of Markets for Water

    Full text link

    Quantity Photos receipt

    No full text

    The future role of the chartered quantity surveyor

    No full text
    SIGLEAvailable from British Library Lending Division - LD:84/33825(Future) / BLDSC - British Library Document Supply CentreGBUnited Kingdo
    corecore