492 research outputs found
Parsec-scale HI absorption structure in a low-redshift galaxy seen against a Compact Symmetric Object
We present global VLBI observations of the 21-cm transition of atomic
hydrogen seen in absorption against the radio source J0855+5751. The foreground
absorber (SDSS~J085519.05+575140.7) is a dwarf galaxy at = 0.026. As the
background source is heavily resolved by VLBI, the data allow us to map the
properties of the foreground HI gas with a spatial resolution of 2pc. The
absorbing gas corresponds to a single coherent structure with an extent
35pc, but we also detect significant and coherent variations, including a
change in the HI optical depth by a factor of five across a distance of
6pc. The large size of the structure provides support for the Heiles &
Troland model of the ISM, as well as its applicability to external galaxies.
The large variations in HI optical depth also suggest that caution should be
applied when interpreting measurements from radio-detected DLAs. In
addition, the distorted appearance of the background radio source is indicative
of a strong jet-cloud interaction in its host galaxy. We have measured its
redshift ( = 0.54186) using optical spectroscopy on the William Herschel
Telescope and this confirms that J0855+5751 is a FRII radio source with a
physical extent of 1kpc and supports the previous identification of this
source as a Compact Symmetric Object. These sources often show absorption
associated with the host galaxy and we suggest that both HI and OH should be
searched for in J0855+5751.Comment: 14 pages and 10 figures. Accepted for publication in MNRA
Analysis and Modeling of the Quasi-Z-Source-Inverter
This paper presents a dynamic average model of the Quasi-Z-Source Inverter (QZSI), based on the short term average values over one PWM-period, and the analysis of the possible switching states that can occur in the QZSI. The model is considerably descriptive since the modeling has been performed by analyzing the physical and functional relations with only little mathematical complexity. Another advantage of the proposed model is that the load current only acts as a disturbance input, and is not directly linked with the model structure itself. This allows a separate examination of either command input or disturbance response and makes the model independent of the given load. The model has been tested successfully in conjunction with an adequate cascade control loop design and a QZSI-prototype in hardware
Recommended from our members
Beneficial Reuse of San Ardo Produced Water
This report summarizes the work performed from 1 April 2003 to 30 September 2003 and recommends the tasks to be performed during Phase II (Pilot Evaluation). During this period discussions were held with various water agencies regarding use of the treated produced water either directly or indirectly through a water trading arrangement. In particular, several discussions were held with Monterey County Water Resources Agency, that has been charged with the long-term management and preservation of water resources in Monterey County. The Agency is very supportive of the program. However, they would like to see water quality/cost estimate data for the treated produced water from the pilot study prior to evaluating water use/water trade options. The agency sent a letter encouraging the project team to perform the pilot study to evaluate feasibility of the project. In addition, the regulations related to use of the treated water for various applications were updated during this period. Finally, the work plan, health and safety plan and sample analyses plan for performing pilot study to treat the oilfield produced water were developed during this period
Recommended from our members
Beneficial Reuse of San Ardo Produced Water
This DOE funded study was performed to evaluate the potential for treatment and beneficial reuse of produced water from the San Ardo oilfield in Monterey County, CA. The potential benefits of a successful full-scale implementation of this project include improvements in oil production efficiency and additional recoverable oil reserves as well as the addition of a new reclaimed water resource. The overall project was conducted in two Phases. Phase I identified and evaluated potential end uses for the treated produced water, established treated water quality objectives, reviewed regulations related to treatment, transport, storage and use of the treated produced water, and investigated various water treatment technology options. Phase II involved the construction and operation of a small-scale water treatment pilot facility to evaluate the process's performance on produced water from the San Ardo oilfield. Cost estimates for a potential full-scale facility were also developed. Potential end uses identified for the treated water include (1) agricultural use near the oilfield, (2) use by Monterey County Water Resources Agency (MCWRA) for the Salinas Valley Water Project or Castroville Seawater Intrusion Project, (3) industrial or power plant use in King City, and (4) use for wetlands creation in the Salinas Basin. All of these uses were found to have major obstacles that prevent full-scale implementation. An additional option for potential reuse of the treated produced water was subsequently identified. That option involves using the treated produced water to recharge groundwater in the vicinity of the oil field. The recharge option may avoid the limitations that the other reuse options face. The water treatment pilot process utilized: (1) warm precipitation softening to remove hardness and silica, (2) evaporative cooling to meet downstream temperature limitations and facilitate removal of ammonia, and (3) reverse osmosis (RO) for removal of dissolved salts, boron, and organics. Pilot study results indicate that produced water from the San Ardo oilfield can be treated to meet project water quality goals. Approximately 600 mg/l of caustic and 100 mg/l magnesium dosing were required to meet the hardness and silica goals in the warm softening unit. Approximately 30% of the ammonia was removed in the cooling tower; additional ammonia could be removed by ion exchange or other methods if necessary. A brackish water reverse osmosis membrane was effective in removing total dissolved solids and organics at all pH levels evaluated; however, the boron treatment objective was only achieved at a pH of 10.5 and above
Mapping the galactic gravitational potential with peculiar acceleration
It has been suggested recently that the change in cosmological redshift (the
Sandage test of expansion) could be observed in the next generation of large
telescopes and ultra-stable spectrographs. In a recent paper we estimated the
change of peculiar velocity, i.e. the peculiar acceleration, in nearby galaxies
and clusters and shown it to be of the same order of magnitude as the typical
cosmological signal. Mapping the acceleration field allows for a reconstruction
of the galactic gravitational potential without assuming virialization. In this
paper we focus on the peculiar acceleration in our own Galaxy, modeled as a
Kuzmin disc and a dark matter spherical halo. We estimate the peculiar
acceleration for all known Galactic globular clusters and find some cases with
an expected velocity shift in excess of 20 cm/sec for observations fifteen
years apart, well above the typical cosmological acceleration. We then compare
the predicted signal for a MOND (modified Newtonian dynamics) model in which
the spherical dark matter halo is absent. We find that the signal pattern is
qualitatively different, showing that the peculiar acceleration field could be
employed to test competing theories of gravity. However the difference seems
too small to be detectable in the near future.Comment: 11 pages, 10 figures, 3 tables, minor changes, accepted for
publication by MNRA
- …